HomeMy WebLinkAboutMinutes_Special Meeting_06/16/1964 (3) MINUTES OF A PUBLIC AMING HELD BY THE
COUNCIINiE+N OF THE VILL&GE OF TEQUEST .A.
1. public hearing Was held by the Councilmen of the Village of Tequesta Tues-
day, June 16, 1964 at 80 P.M. at the First United Presbyterian Church; Tequesta,
Florida to consider and act upon the locating and firing of a bulkhead line off
shore from any existing lands within the territorial limits of the Village.
Councilmen present were: Messrs: Valier, Turnbull and Cornelius. .also present eras
Robert Harp, Village Clerk.
Council was advised that the hearing had been advertised according to law
and that only one property owner had stopped in the Village Office to look at
the plan of the proposed bulkhead line.
The prints of the proposed bulkhead line, as prepared by Brockway, Weber Er
Brockway Engineers, Inc. were shown and the council.was advised the line as shoim
was determined by actual field survey and t'y aerial photographs with the line being
approximately the high water line at the time of observation. All presently existing
bulkheads are tied into the proposed line with the water side of the bulkhead
being the outer side thus making all present bulkheads on the individuals' property.
There were no property oimers present and no protests of any manner had been
received.
Cornelius moved, seconded by Turnbull and passed that the bulkhead line as
shown on drawings prepared by Brockway, tTeber & Brockway Engineers, Inc. (February
1964, Job No. 63 -992) be approved and they be authorized to have a description
prepared for an Ordinance to be prepared by l ttorney* Lord for adoption by Council
and submission to the Trustees of the Interbal Improvement Fund for final approval.
Meeting adjourned at 8:40 P.M.
Res" ly submitted,
�.obert arp
Village Clerk
1
I