HomeMy WebLinkAboutDocumentation_Regular_Tab 16_08/11/2005 �8-�4-'�5 14;46 FBOM-�BCADIS �EE�E MACO� 5814338911 T-?34 P801/��3 F-86�
AR�ADl5 �Ma
�t$�ss, M�an �nd Associate�,
Inc.
$415 Lake Wotth Rcyad
Suite 307
Lake Worth
MEMO Florid� ����-29Q7
TQ: Copies: Tei 567 433 3226
F8X 561 d33 801 i
�trb CX�rlo Ray �'al)an
Village afTequ�sta Paul Brienzs
from: '
Tom 3en�en
Date: Aa�ADIS Frojeck Na.:
August 4, 2005 R�`OQ3I O�.00U01
Suhjeot;
�,�Kahatchee River Y.7istrict
1NT�' Cr�ner�tor Sharing
As �eve discu�s�d, the Foilpwing is � summary of th� alx3ve xeferen�ed project.
Several man#hs agc� I r�v�s apprc�ached hy 1'au1 Br►enz� at the 17istriGt regardin� the feasibiliCy of the Village
�llo�ving a p�rttyanent co�at�ection of thair 1ift st�tic�n, which sits auC front of the `W'T�, t� th� plants on-site
emer�;�ncy �en�ra[or_ The initia! revier�v �#`the imp��t �f this lo�d an the g�tterator �c!�s canducted, �nd it
was determined that tt►e generator has st�ffici�nt c�pa�i�y to h�ndle the two (2} 20-hors�powar pumps that is
in the Iift statian. In fact, the 1i� sta#ian load �quates to appraximat�l� 3°fa of th� generators capacity.
We th�n had our electrical consultart (J.I�. T�am �ci�ineerina}, who also has their o�n constru�tian crews,
visit the s'rte al�n� �vith the I]isxrict pers�»nal ta deterrnine the t�perating criteria af this ti�-in and the rnast
economicai way ta pro�vide the �m�tgency serv'ir„� to the lift station. The 1ift statian will hav� a manual
tr�nsf�r �witeh tl�at will require concurrence from l�istr'sct si�i�`an� `V�illage WTP st2tff prior tc� the transfer of
power Co the �ener�tor.
The DistriCt's intent of thi� connection is for its use to o�cur during m�jc�r stc�rre� ��r�nts w'here l�+ng tetm
power outages �re encount�red, li'ke vt�hat occurred last summer, not for narmat �1��, c�utages. The normal
outages csn b� handled by a I�istriot portabie generator. It should be nc�t,zd, that l�st summer the pl�nt did
expet'i�nce s[�r»� backt�p of sew��e �vithin the plant pipe ��lleys, dU8 Cc7 the T3sStriCt shor�a�� af'�ortabl�
generators_ '[`his �a� typic�i far all utiliti�s that were impacted by the storms.
.�.�-I. Ham has pravided a cost tc� eons#ruet the proposed improvemer�� of $] 9,850.00. T'heir ietter �ched
outlines the cast�. The C}ist�ict is v►rillinp; ta split the cast t�f t}��se impro�vements'witYf the V'ill�ge an� be
pre�ent at the Cc+unoil meeting to discuss Ch�ir c,ammiCment to C�tis project.
, IFy�u shoald �quire any additi�nal informa�ian regarding this, glease da not hesi#ate to call.
Ps9e:
g:18ltMG�plr.aYrespllGjl[Cj0310fi g6rb.genefatam:nmo.doc
AUG-04-2��5 0�:49PM FRX:5�i14338011 IQ: PA�aE:��1 R=96%
�7-15-'�5 1�;2� F�OM-ABCADIS BEESE MACON 5614338011 T-6$8 P0�1/0�2 F-681
J. H. HAM ENCINEEl�IhIG, tNC.
Electri�al & Instrurnenta►ti�n En�ineering & ConstructiQn
July 78, 2005
Post•it Fax Nate 7671 �� � . �, � ���1► �
ro Ftrim --+�,� �
� ArcadisiReese M�c.c�ri �nd Associ�ts �' °°.
�4�15 L�ke WOr#h Rd,,SUI#E 3�7 P�o�� �one;v
l��k� Worth, F{ 33463 F�� F�#
Attn: Mr. Thomas C. Jensr�n, l�.E.
Re: Emergency Paw�r fr�r �ewer Lift Station
J.H, Ham �ngineering, Inc. F�roposal No. P3�3'I8T
Dear Mr. J�nsen,
We are pleased ta submit Qur proposal to provid�: m�t�rial, labar, equipment and
sup�rvisian far th� falic�wing s�ope of work.
1. �urnish and install on� (1} �p0 amp, �00 vait, �� kai�, 3 pvfe breaker and buck�t
in the existing Cuttter Hammer switchgear laiaetect MCC 2�0.
� 2. Rout� 2" rigid galvanized s#eet �nduit ftom M�C 200 overhe�d �nd penetr�te
th� hA�C rc�om wall near the floar. Th� conduit will be caated with 2 p�rt epo�cy
pain# after installation.
3. Rout� 2" s�bedule 40 pvc conduit underground from outside the MCC r��m to
the existing sewer (ift station. A portion of #h� route will be a dire�Eic�nal bore
und$r the ��ph�lt driveway. This directinnal bore will be done by th� Village vf
Tequesta distribu��rn department a�s per John Collings 7-15-205.
4. Furnish and inst�ll �"f 00 amp, 60Q va!# wEMA 4X s#ainless steel double thrQw
switch with a st2�inless steef locking scissr�r h�sp for multiple focks. The switCh
will be mounted on a stainless steel uni�trut r�ck adde� tQ the existing equipm�nt
rack at #he lift st�tion.
5. Mak� all r��cess2�ty t�rminations and furnish s#�r#-up �ssistance.
G02 �l2A'N'N'�T� R.4A17 �,0. BOX 5106 wp67da1a/prqpos�UP3�318T OFFICE: (863} 646-1448
LAKEtAND, FLORIDA 338D7-51�B FAX: ($6$) �4�-0784
JUL-18-2005 02:23PM FRX:�614338011 ID: PA�E:0Q1 f�=96%
�7-18-'05 14;20 F�OM-A�CADIS �EESE MACON 5614�38�11 T-6$8 F�02I0�2 F-681
J.H. H�m Enginrering.lnC.
P�ge 2 aP2
'The grice �or tk�e abvve scope of rvarlr �s �19,$50.0�
C)ption; Ple�s� deduct $3,140.44 if yau elect not ha�ving the �QUble thraw switch inst�lled by
y.�T. T-�arn Engin��ring Inc. This op�ic�n �auld inalude 1'rne it�ms l, 2, and 3. Leaving the pulled
conductars stubbed out of the graund near the lifC station slab.
Tem�s �f P�y'�nsen�: Manthly pro�ress payments for insta.11ed work and rnaterials stored an sit+e;
A1ET thirt�' (��) da�s.
� Qualificatians:
I. We do not include any ternporary electric cath�r Ck�.au� for aur own nse.
'�. We hs�ve not included the cost of �lectrical permit.
3. We t►��re i,n�i�ded Fiorida Sales Tax an mat��s.a.ls �crhir�h �ve �urnish.
4. �e hav� 1�ased aur price c�n woxking a standard farty hour w��k exclusi�re c��' S�turdays,
Sundays or holida,ys. "W"e have not incluc�ed ��r premium time.
5. (3t� price is firm frar �c�ep#ance for a period of thirty (30) da�'�,
'p�e wonld like ta thank you ha�'e a�'orded us in presenting this prapasal and we hc�pe the �.bty�ve
infarma,tion rneets with �4ur appror��l. If _ yau have any c�uestic,n� or require �ddition�.l
informa,tian, ptease do not �esitat� tc� c�.l( aur office.