Loading...
HomeMy WebLinkAboutDocumentation_Regular_Tab 06_06/09/2005 INTEROFFICE MEMORANDUM TO: VII.LAGE MAYOR AND COUNCIL //' " FROM: R GARLO, ASSISTANT MANAGER SUBJECT: T'RAFFIC SIGNALS AT TEQUESTA DRIVE AND OLD DIXIE I-iWY. DATE: 6 J2/05 CC: VILLAGE MANAGER Resolution 70-04/05 - Design of traffic signals for Tequesta Drive/FEC Railroad intersection beautification projec�. The FEC landscape project was originally planned as the first phase of improvements to the Tequesta, Drive railway crossing and to Old Dixie Highway north of the intersection. The original budget of �220,000 was for landscaping at the railway crossing with future phases to include upgraded signals, decorative paving in the roadway intersection, and a linear park from Tequesta Drive north to Countp Line Road. The Village then received an additional �200,0(? in grant funding from the discretionarq account of County Commitssioner Karen Marcus, the intent of which was to include the upgraded signals. At that time, Council considered the cost and construction time for the traffic signals and direction was to begin landscaping the intersection and development of the linear park, and to consider the upgraded signals as phase two of the overall project The Village has sance entered into an amended Inter-local Agreement with the County in which Cominissioner Marcus offers the Village an additional $135,000 to fund the linear park. This affords an overall budget of �555,Q00 and provides the opportunity to complete the projectin its entirety. Design and cost estima,tes are underway for the Linear Park. I have subsequendy researched the pxocess of ha.ving the traffic signals de�igned and constructed. This process has been affected by last year's hurricanes, pla,cing an increased demand on productian, in addition to increased cost of construction ma,terials. In response to this, Palm �Beach Count�s Traffic Division has recendy completed a comprehensive bid proposal prceess for the design, engineering and construction of mast arm signals. They entered into a contract agreement with Kimley-Horn and Associates, Inc. to perform design and engineering services for the County. The County's Traffic Division has done due diligence in this process and advises utilizing their contractor t� provide the most efficient process, with assurances that the desi�n will comply with all D.O.T: specifications. Resolution 70- 04/05 will fund the cost of the necessary design and engineering. RESOLUTION NO. 70-04/OS A RESOLUTION OF THE VILLAGE COUNCIL OF THE VILLAGE OF TEQUESTA, PALM BEACH COUNTY, FLORIDA, APPROVING A CONTRACT WITH KIMLEY-HORN AND ASSOCIATES INC. FOR ENGINEERING DESIGN SERVICES TO REPLACE THE TRAFFIC SIGNALS AT TEQUESTA DRIVE AND OLD DIXIE HIGHWAY IN THE AMOUNT OF $23,149.29 FROM ACCOiINT #303-399-663.675. WHEREAS, the Village is undertaking the installation of improvements, including, but not limited to, tra�c signals and beauti�catian at the intersection of Tequesta Drive and OId Dizie Highway; and WHEREAS, the Village has budgeted $400,000 in the FY 2004-2005 Capital Projects Fund for the project in account #303-399-663.675 for this purpose; and WHEREAS, the Village wishes to accept the proposal of Kimley-Horn aad Associates, Inc. in the amount af $23,149.29 to design the mast-arm traffic signals for the intersection as specified in the Engineer's Opinion of Cost Estimate attached as "Exhibit A"; and NOW, THEREFORE, BE IT RESOLVED BY THE VILLAGE COUNCIL OF THE VILLAGE OF TEQUESTA, PALM BEACH COUNTY, FLORIDA, AS FOLLOWS: Section 1: The Proposal by Kimley-Horn and Associates, Inc. in the amount of $23,149.29 to design the mast-arm traffic signals for the intersection as specified in the Engineer's Opinion of Cost Estimate, atta.ched as "Exhibit A" is hereby approved. THE FOREGOING RESOLUTION WAS OFFERED BY Councilmember , who moved its adoption. The motion was secanded by Councilmember , and upon being put to vote, the vote was as follows: FOR ADOPTION AGAINST ADOPTION The Mayor thereupon declared the Resolution duly passed and adopted this 9th day of June, 2005 A.D. Mayor of Tequesta Jim Humpage ATTEST: Gwen Carlisle, Village Clerk i May 13, 2005 Ms. Fattoush Jafar, PE, PhD Traffic Signal Eugine� Palm Beach County Engineering and Public Works Department 160 Australian Ave, Suite 303 Palm Beach County, Florida 33406 RE: Contract # . Work Order # T,,, F'ile # Traflic Signal Design Tequesta Drive & Old Dixie Hwy (Int. No. 02600) Dear Ms. Jaffar: Kimley-Horn and Associates, Inc. (CONSLTLTANT) is pleased to submit this . letter proposal (5cope, Schedule, and Fee) in accordance with our contract for Traffic Signal Design Annual Services for Palm Beach County (COUNTI� to provide traffic signal design and related services for the subject Work Order. SCOPE OF SERVICES Task 1— Site Visit The CONSiJLTANT's signal designer will conduct a site visit to the Tequesta Drive and Old Dixie Highway intersection to obtain information pertaining to physical characteristics including visible existing utilities that may impact the construction of the proposed signal supports and displays. The data collected during the site visit will be utilized in preparation of the construction plans. Task 2 — Proiect Coordination The CONSiJLTANT will coordinate with all known utility owners in Palm Beach County that may have facilities in the proposed construction area. This coordination will consist of notificarion of the proposed improvements, and transmittal of conceptual plans to the owners for mark up and return to the CONSULTANT. Task 3 �urvev The CONSiJLTANT will procure the services of a Florida licensed professional surveyor and mapper to provide boundary and topographical survey of the intersection azea. The survey will consist of right-of-way and standard topographical survey to a point at or near 350' in each direction of the intersection on Tequesta Drive and at or near 350' on Old Dixie Highway. All at grade or above ground fixtures or structures within the right-of-way will be shown on the survey, and labeled in accordance with standard labeling procedures. Task 4 — Geotechnical Exnloration The CONSULTANT will procure the services of a professional geotechnical exploration firm to provide two 35' Standard Penetration Test borings at the proposed mast arm pole locations as well as spot borings in or near the existing roadways in the areas of proposed geometrical improvements. A geotechnical report will be prepared to provide roadway base and soils conditions documentation. This r�ort will be utilized by the CONSULTANT to pr�are roadway impro�rements and to perform structural calculations for mast arm foundations and poles for the signal supports. Task 5 Signal Desi�n and Plan Preparation The plans will include a Cover Sheet, Tabulation of Quantities and General Notes, roadway Plan and Profile Sheet sheets as required for proposed geometric improvements, a Signal Plan sheet including standard controller timing settings developed from volumes provided by the COUNTY and projected volnmes, a Pole Schedule Sheet, and any details that are specific to the proposed improvements. As part of the Plans package the CONSiJLTANT will design the structural . details and perforrn pole and foundation calculations for the mast arms to be included on the project. The geotechnical report prepared under Task 4 will provide the background soil information required for the mast arm structural designs. The CONSt7LTANT will submit the structural designs in FDOT format as part of the Signal Pian submittals. The CONSULTANT will submit Preliminary Plans to the COIJNTY for review and comment. Upon receipt of review comments, the plans will be revised and the Final Plans will be submitted for approval. The Final Plans will be suitable for construction by a signal contractor. Task 6— Construcdon En�neer'n� Insuection (Optional Service) The CONSLJLTANT will provide CEI services for the traffic signal installation if directed by the client. The service will consist of mast arm foundation installation, one interim visit while the signal is being constructed, a conditional acceptance inspection when the signal is placed in flashing operation, and a final inspection when the signal is placed in full operation. Task 7— Other Additional Services Services not included in the Scope of Services, but available if required include, but are not limited to: ♦ Bidding and/ar Contractor Selection Assistance ♦ Interconnect Plan Design ♦ Traffic Counts ♦ Timing Plan Development ♦ Utility Locations ♦ Permitting SCHEDULE The CONSLJLTANT will undertake and complete the described services as expeditiously as possible to meet a mutually agreed upon schedule. FEE AND BILLING Kimley-Hom and Associates, Inc. will provide the services described in Task 1 through Task 5 in the Scope of Secvices for the lump sum labar fee (not including expenses) as detailed below. Task 1 through 5 Fee Amount KHA Labor $15,663.Q0 Survey (Adair & Brody, Inc) S 2,500.00 Geotechnical (Tierra, Inc.) $ 4,070.00 Total $22,233.0(1 Direct Reimbr�rsable Eamense Task 1 through 5 For these tasks, direct reimbursable expenses such as express mail, air travel, out- of-town mileage and other direct expenses will be billed at 1.15 times cost. Estimated Fee $ 1,000.00 . Ontional Services If the client desires, KHA will provide the services described in Tasks 5 and 6 for a cost plus labor fee (using our current rate schedule in ef�ect at the time the services are rendered) plus expenses. Any direct expenses incurred, as the result of obtaining the services of a qualified sub-consuttant will be billed at 1.15 times cost. All permitting, application and similar project fees will be paid directly by the COUNTY. Fees will be invoiced monthly based upon the percentage of services completed as of the invoice date for all lump sum tasks and based on the actual amount of service performed and expenses incurred for all hourly tasks. Payment will be due within ZS days of the date of the invoice. CLOSURE If you concur in all the foregoing and wish to direct us to proceed with the services, please provide us with a purchase ord� for said work. We appreciate the opgortunity to submit this proposal. If you should have any questions, pleas� do not hesitate to contact us. Sincerely, KIMLEY-HORN AND ASSOCIATES, INC. Blair G. Marsdeq P.E. Project Manager !ClMLEY-HORN AND A534ClATES, thPC, PaJm Beach County Tra�a Engineering and '�ratfic Signaf Desfgrn Tequesta Drive & Old Dixie Nighway 5ignal f7esiyn SUMMARY FEE SHEET ProJect DescApUon: Traffie Signal Dasign Project Senior Projed CAOD Admin Man er En 'r�eedDesi ner En ineer/Deai ner Anal Techniaan Su Basic Manho Average Activity Man- HouAy Man- Hourly Man- Hourly Man- Hourly Man- Houriy Man- Fburly Activity By Hourly Hours Rate Hours Rate Hours Rate Hours Rate Hours Rate Hours Rate Activi Rate Meettnps(Two) 2 $57.00 2 $42.OQ 4 $37.f�0 4 $2�.00 $2.'I.Q� 2 $18.C��? $490.00 14 $35.00 SiteVisit(Task1) 0 $57.00 0 $42.00 4 $37.00 4 $27.00 0 �,^_1.�0 0 �1F.00 $256.00 8 $32.00 Projeet Coordinatlon (Teak 2) 0 $5i.0U 4 $44A0 4 �37.4C 8 $27.00 2 �29.00 2 y18.0u $610.00 20 $30.50 5) 2 $57.C�6 12 542.OU 32 �37.0� 30 $27.U0 27 $21.t1J 0 �4R.0� $3,179.00 103 $30.86 SfructualDesi n(Task5 2 $57,OQ 2 $42.60 8 $37,t30 4 $27.DQ 4 $2?.0� 0 $18.G0 $886.00 20 $34.30 Total Total Total Total Total Total Total Total Total Total Tofal Total TOTALS M/H AmouM M/H Amounf M/H Amount MM Amount M/H Amount M/H Amourn 8 $342.00 20 $840.00 52 $1,924.00 50 $1,350.00 33 $693.00 4 $72.00 ,221.00 185 $37.64 TOTAL CONTRACT FEE COMPUTATIONS Labor KHA Labor Fee $5,221.00 Labor N�uttipfier 3.00 Total Labor Fee 515,663.00 Expenses Subs (DBE Participation 28% Survey (Adair & Brady, Inc.) (fask 3) $2,500.00 Geotechiicat (Tierra. inc.) (Task4) $4.070.00 Aliocatfon 5.85% $916.29 rorar �.xpens. a�,aae.zs TOTAL FEE 523,149.29 5/182005