Loading...
HomeMy WebLinkAboutDocumentation_Regular_Tab 04C_11/18/2004 / �c � T�r .� � , tlF.' � �� 7 .�" � F; � 3 �� t r� ^ , ' O � �V �'�� �� �y N D M M EMO RA U TO: Michael R. Couzzo, Jr., Village Manager FROM: Robert Garlo, Assistant Village Manager DATE: November 10, 2004 SUBJECT: Hurricane Hardening of Village Hall CC: Viilage Council This memo is in regard to Item 4C of the November 18'h council agenda, specifically discussing the hurricane hardening of the Village Hall. Please note that Mayor and Village Council have previously received the most recent rendering of the proposed Village Hail. Additionally, I have included copies of the letters from CH2Mhill, dated September 10, 2004, September 23, 2004, and October 8, 2004. These documents discuss the wind resistance engineering of said project and proposed hardening of same. E/Administration/Council memos/hurricane hardening Village Hall CH2M HILL j One Marvard Circle West Pafm Beach, FL 3;i409 1 y23 TBI 561.515.6500 � �H2MHILL Fax561.515.6502 � September 23, 2004 VilIage of'I'equesta 250 Tequesta Drive — Suite 300 T�questa, �lorida 33469-02?3 ATT: Mr, Mict�ael R. Cauzza, Jr. Village Manager, VilIage of Tequesta Rl.: Village Hall Wind Resistance Uesign Criteria Dear Mr. Couzzo: 'fhe following is a surnmary of the design criteria used to engineer wind resistance for ihe Viltag� Hall Project. "i'he Florida Building Cade, 20Qt requires engineers to design buildings in accordance with Chapter 6 of ASCE 7. (Aroerican Society of Civil Engineers). The Vitlage Hali is located in a Exposure C Category, {Coastal BuiIding Zane) with a 3 secand gust wind speed af 140 MPH vv�th an importance Factor of 1.l S. Metrorologists describe storms in terrns of "sustained wind speeds" while engineers are required to design buildingr i'or peek gu5t. 'I'he definition of "sustained wind'speed" is the average wind speed over a b4 second period. 'T`l�e definition of "peak gust" is the ma�cimum wind speed for any 3 second peri�. Th� Village Hali is designed for a 140 mph, 3 second gust wind speed and after the importance factor is applied, the efFective design peak gust is 150 mph which equates to a sustained wind speed of approximately 125 mph According to the Saffer — Simpson Hurricane Scale, a Ca.tegory 3 Hurricane is one with sustained winds between I l 1 and 130 mph. To increase the wind resistance beyond the FBC, additional reinforcement of the buifdings extcrior envelope, svonger windaw and doar pm#ection, additional rooftie dawns and, stron�;er cladding building cornponents vv�ll be required. We trust this addresses your question. Shauld yau Tequire additional information, please call. Very truly ours, , Mike Flattery Project Manager CH2M NILL One Narvard Circle � West Paim 6each, Ft 334U9-i923 Tel 561.515.6500 � CH2MHILL F�56,.5,5.�02 �� Octaber 8, 20i?4 Village of'1'equesta 2S0 Tequesta Drive — Suite 300 Tequesta, Florida 33469-0273 A`I'T: Mr. Michael R. Couzzo, Jr. Village Manager, ViIlage af Tequesta Itf:: Village Hall `I-Iold Status' Dear Mr. Couzzo: Per yaur request, we have put a Hold on the Village Hall Praject'until the Commissioners have a chance to determine if the facility should be modified to increase the "wind laad resistancc". fn s�rdcr to provide a Category 4 Hurricane Resistance Faciliry orbetter, the existing design criteria will require re-engineering to increase the structural camponents of the foundation, wall and roof systems. Alsa, the mechanical and electrical systerns will require re-design tc� include a generator isoiating electrical panels, HVAC du.ct distribution, etc. W�thout the beneft of an evaluation study, a preliminary budgetary' oost increase af $8Q(},OQQ to $1,0OO,OUO ptus a lU% design fee can be expected to the currenf project cast. W� would recarnmend to do an evaluation study ta program the'Village needs and pravide c;oncepts with preliminary cost. Tbis service would nat exceed �5,000 for A/F, fees. We trust the above provides you with the information requested. Plcase cail should you have any questions. V�ry trt2iy yours, Mike Flattery Pr�ject Manager Cc: Tom Orlowski MEMORANDUM TO: Mayor and Council FROM: Michael R. Couzzo, Jr., Village Manage y- ___� DATE: September 10, 2004 SUBJECT: Amendment to Architectural/Engineering Agreement with CH2MHi11/Gee & Jenson to prepare plans and specifications for the new Tequesta Village Hall I am proposing for your consideration a change order to the existing contract with CH2MHilUGee & Jenson for the design of the new Village Hall. After further consideration, I recommend the Village Council approve a change order in the amount of $30,000.00 to modify the design of the new Village Hall to include hurricane hardening for the Council Chambers and employee lounge area. Preliminary construction estimates for the hurricane hardening are approximately $300,000.00 additional. This area could be used as a shelter of last resort for residents in addition to sheltering the families of emergency personnel on duty. This item is being placed on the agenda at this time so as not to significantly disturb the proposed construction schedule.