Loading...
HomeMy WebLinkAboutDocumentation_Regular_Tab 15_04/12/2012 , � • VILLAGE OF TEQUESTA �d"' AGENDA ITEM TRANSMITTAL FORM , 1. VILLAGE COUNCIL MEETING: Meeting Date: Meeting Type: Regular Ordinance #: .;+; i� r: «� a r, �:� t��„:: APRIL 12, 2012 Consent Agenda: No Resolution #: 3-12 Originating Department: Utilities 2. AGENDA ITEM TITLE: (Wording form the SUBJECT line of your staff report) Awarding a contract to Felix Associates of Florida, Inc. for the Tequesta Drive drainage improvements and increasing the fiscal year 2011/2012 Stormwater budget by appropriating Fund Balance in the amount of $43,175.00 3. BUDGET / FINANCIAL IMPACT: Account #: Amount of this Item: 403-250-663.663, Drainage Improvements $373,175.00, Amount of Contract 403-990-399.999, Appropriate Fund Balance $43,175.00, Appropriation Request Current Budgeted Amount Available: Amended Budget after Item: 403-250-663.663, $330,000.00 403-250-663.663, $382,725.00 Current Amount Appropriated to Date: Amended Amount Appropriated to Date: 403-990-399.999, $0.00 403-990-399.999, $43,175.00 Budget Transfer Required: Yes Appropriate Fund Balance: Yes 4. EXECUTIVE SUMMARY OF MAJOR ISSUES: (This is a snap shot description of the agenda item) This item is for the drainage and road improvements for Tequesta Drive starting at Seabrook Road and terminating at Short Avenue. 5. APPROVALS: � e � P.; � Dept. Head: • ��� Finance Director: � __ ; � �'�" ; �,�- � Attorney: (for legal sufficiency) Yes ❑ No ❑ _.,_..�,---� Village Manager: � • SUBMIT FOR COUNCIL DISCUSSION: � • APPROVE ITEM: ❑ • DENY ITEM: � TEQUESTA. UTILITIES � � MEMORANDUM :. TO: MICHAEL R COUZZO, VILLAGE MANAGER FROM: RUSSELL K. WI�TE, PUBLIC SERVICES MANAGER SUBJECT: TEQUESTA DRIVE DRAINAGE IMPROVEMENTS DATE: MARCH 29, 2012 Attached, please find a recommendation of award from Arcadis for the Tequesta Drive drainage improvements. They aze recommending awarding the project to Felix Associates of Florida, Inc. at a cost of $373,175.00. As you are aware, we budgeted $330,000.00 for this project. That estimated cost was from 201 p when we began the planning of this work. So, with the ever changing economy, if approved we will have to appropriate the balance of $43,175.00. I have discussed this with the Finance department and we do have the funds available to accomplish this. After review of the bids and engineers comments, I also recornmend approval of this proposal. Please let me know if you have any questions oz concenns relative to tlus. RESOLUTION NO 3-12 A RESOLUTION OF THE VII.LAGE COUNCIL OF THE VILLAGE OF TEQUESTA, PALM BEACH COUNTY, FLORIDA, AWARDING A CONTRACT TO FELIK AS50CIATES OF FLORIDA, INC. FOR THE TEQUESTA DRIVE DRAINAGE INIPROVEMENTS IN THE AMOUNT OF $373,175.OQ AND INCREASING THE FISCAL YEAR 2011/2012 BUDGET IN THE STORMWATER FUND #403 BY APPROPRIATING FUND BALANCE IN THE AMOUNT OF $43,175.00 AND AUTHORtZING THE VILLAGE MANAGER TO EXECUTE ON BEAALF QF THE VILI�AGE. WHEREAS, the improvemeats were advertised for bid and Felix Associates of Florida, Inc., the lowest bidder, has been approved by the Village's engineers to perform the improvements; WHEREAS, $330,000.00 was budgeted in the fiscal year 2011/2U12 Stormwater #403 budget for the project; WI�EREAS, an additional $43,175.00 needs to be appropriated in the Stormwater Fund #403, account # 403-250.663.663, Dra.inage Improvements to fund the improvements; NOW, THEREFORE, BE IT pRDAINED BY THE VII.,LAGE COUNCIL OF THE VILLAGE OF TEQUESTA, PALM BEACH COUNTY, FLORIDA, AS FOLLOWS: Section 1 Resolution No. is hereby approved awarding a contract to Fel� Associates af Florida, Inc. for the Tequesta Drive drainage improvements in the amount af $373,175.00 and increasing the fiscal year 2011/2012 budget in the Stormwater Fund #403 by appropriating Fund Balance in the amount of $43,175.00 and authorizing the Village Manager to execute on behalf of the Village. Section 2 This Resolution shall become effective immediately upon passage. 1 FISCA� YEAR Zo�2 Villaqe of Tequesta Ba # Bud�et Amendment Request JE # �� _ ., . ..� , , hi . . . �_ ,. . �z r . ., . . . ' -. � �... � , u . ,� ,�.�.�. .� . �., :'.,. ,. Departrnent: Stormwater Account: Drainage Improvements Accourrt #: 403-250-663.663 Original Budget Balance Available Transfer Amount New Balance Available $ 330,000.00 $ 330,000.00 $ 43,175.00 $ 373,775.00 Justification / Comments: Additional funding required to complete the Tequesta Drive drainage improvements. �partment: Accou�rt: Account #: Original Budget Balance Available Transfer Amount Nsw Ba#ance Available $ 0.00 $ 0.00 $ 0.00 $ 0.00 Justification / Comments: Department: Account: Account #: Original Budget Balance Available Transfer Amourrt New Balance Available $ 0.00 $ 0.00 $ 0.00 S 0.00 Justification ! Comments: Department: Account: Account #: Original Budget Balance Availabte Transfer Amount New Balance Available $ 0.00 $ 0.00 $ 0.00 S 0.00 Justiftcatlon / Comments: ., z -.�`��/� ,3 ' � 4 T f'� �q gi ' , �-.. '+ '� `a � l�MV'+rr� . . �.. , v _ ,� � .d„ ���_ � � �. � � .�.> >,e . �� ��e ,.. u� � „ r . �� �� swsw .r�� ,v �r. wr.s� .,r� x� �..�.. <. , w.G.-.. �. ,. c,. s.< Departmer�t: Stormwater Account: Appropriate Fund Balance Accourrt #: 403-990-399.999 Original Budget Appropriated to Date Appropriation Request New App�opriated to Date $ 258,130.00 $ 0.00 S 43,175.00 $ 43,175.00 Justification ! Comments: Additional funding required to complete the Tequesta Drive drainage improvements. DeparUner�t: Accour�t: Account #: Balance Available � 0.00 �i 0.00 b 0.00 b 0.00 Ju�tification / Comments: Department; Account; Account #: Original Budget Balance Available Transfer Amourrt New Balance Available $ 0.00 $ 0.00 $ 0.00 $ 0.00 Justification / Comments: DeparFment: Account: Account #: Original Budget Balance Availab� Trans�er Amount IMew Balar�ce Avai�ble $ 0.00 � 0.00 $ 0.00 $ 0.00 Justification / Comments: �'��''.. . e_ . � � . � � >>.� ,. }�. � , ti � ' , w�� „ � .s .. _ � ,. �. .. .�, �� � ..��: <.�. ., . .: ., . . . ���.�. �. Department Head: +�— • Date: 3� 1 � O f 2� Budget Officer: Da Village Manager Approval: Date: Village Council Approval: Resolution Number Da ,�� ARCADIS U.S., Inc. ARCADIS infrastructure Water Environment Buildings 2081 Vista Parkway West Palm Beach Florida 33411 Tel 561 697 7000 Russell White Fax 561 697 7751 Public Services Manager www.arcadis-us.com Village of Tequesta 136 Bridge Road Tequesta, FL 33458 WATER RESOURCES Subject: Tequesta Drive Drainage Improvement Project Recommendation of Award Date: Dear Mr. White, March 7, 2012 The bid results for the Tequesta Drive Drainage Improvements Project from February Contact: 14, 2012 are summarized below. Samantha Ciminello, E.I. Felix Associates of Florida, Inc. $373,175.00 Phone: 561-697-7007 Foster-Marine Contractors, Inc. $377,270.00 Email: Samantha.ciminello@arc2 Johnson-Davis, Inc. $385,000.00 -us.com Pipeline Utilities, Inc. $399,979.75 Our ref: W F900161.0000 Dickerson Florida, Inc. $416,120.00 Florida License Numbers B8B Underground Contractors, Inc. $421,725.00 Engineering E600007917 Centerline Utilities, Inc. $451,560.00 Geology G6564 Sunshine Land Design, Inc. $480,660.73 Surveying LB7062 Ranger Construction Industries, Inc. $526,110.00 Felix Associates of Florida, Inc. was the apparent low bid at $373,175.00. There was approximately a 29% price difference between the apparent low bid and the apparent high bid. The bottom three bid estimates were within 3.0% difference of each other. Please take note, this project was bid on a unit price basis. Therefore, the final cost amount will be based on actual quantities placed. Page: 1/4 Mr. Russell White � ARCADIS March 7, 2012 There were four bidders' qualifications in the bidding documents that have been listed below. • The bidder must have been in the general contracting business under their present name for a minimum of five years. • The bidder must be properly licensed to perform work as a Prime Contractor in the State of Florida, Palm Beach County, and the Village of Tequesta. • The bidder must have been awarded and performed as a Prime Contractor on a minimum of five similar projects during the past five years. • During the lifetime of the organization, as presently named, the Contractor shall not have defaulted to a bonding company for completion of any project referenced as a qualifying project. It is also reserved in the bid documents that the Owner has the right to award this project to whichever bidder he feels best serves his interests. The evaluation of the apparent low three bidders revealed that the apparent low bidder, Felix Associates of Florida, Inc. did not meet two of the four qualifications listed in the bid documents. Firstly, Felix Associates of Florida, Inc. has not been in business under their present name for at least five years. Secondly, Felix Associates of Florida, Inc. has only been awarded one project that meets the conditions of a "similar projecY' as defined in the bid documents. The remaining listed qualifications were fulfilled. Felix Associates of Florida, Inc. is properly licensed in the State of Florida, Palm Beach County, and the Village of Tequesta. In addition, Felix Associates of Florida, Inc. has not defaulted to a bonding company for any of the listed "similar projects." Felix Associates of Florida, Inc. has only been licensed under its current name since 2009. Prior to 2009, Felix Associates of Florida, Inc. was doing business as Felix Associates, LLC based out of Mamaroneck, NY. Felix Associates of Florida, Inc. has advised during the evaluation that they were created in 2009 by Felix Associates, LLC in order to take advantage of certain Federal Tax provisions and, with the same staff as Felix Associates, LLC, have been doing business since 2009 under the current name, Felix Associates of Florida, Inc. Page: 2/4 Mr. Russell White � ARCADIS March 7 , Zo, 2 Since Felix Associates of Florida, Inc. was not created until 2009, four of the five submitted qualifying projects were performed by Felix Associates, LLC. As a result, the current organization of Felix Associates of Florida, Inc. has been awarded prime contractor on only one of the submitted qualifying projects. As part of our evaluation of Felix Associates of Florida, Inc., the listed references were contacted. After receiving an overall satisfaction rating of 3 out of 3 for their performance from the single acceptable qualifying project, the remaining listed references were also contacted to verify the performance of the staff members currently of Felix Associates of Florida, Inc. From those contacts, it was determined that Felix Associates, LLC received an average overall satisfaction rating of 2.8 out of 3. In addition to the provided references, we also contacted the City of Port St. Lucie. The City has experience with Felix Associates, LLC and Felix Associates of Florida, Inc. and has indicated general satisfaction with the performance of both organizations for the quality of work performed in the past. It was also expressed by the City that there has been no difference seen in the quality of work since the creation of the Felix Associates of Florida, Inc. entity. Felix Associates of Florida, Inc. does not meet all of the qualifications requirements listed in the bidding documents. However, as previously noted, the bidding documents clearly state that the Owner may award in a manner that best serves their interest. In consideration of all of the above and their low bid, it is our opinion that Felix Associates of Florida, Inc. will indeed serve the best interest of the Village. We recommend award in the amount of their low bid of $373,175.00 for the Tequesta Drive Drainage Project. If you have any questions or wish to discuss this further, please don't hesitate to contact us. Sincerely, ARCADIS U.S., Inc. `, v�� � ��lti� � Samantha Ciminello, E.I. Water Resources Engineer I Page: 3/4 Mr. Russell White � ARCADIS March 7 , Zo,2 Copies: File (1) Enclosed: Reference Evaluation for Felix Associates of Florida, Inc. Bid Packages from: Felix Associates of Florida, Inc. (1) Foster-Marine Contractors, Inc. (1) Johnson-Davis, Inc. (1) Pipeiine Utilities, 1nc. (1) Dickerson Florida, {nc. (1 } B&B Underground Contractors, Inc. (1) Centerline Utilit+es, Inc. (1) Sunshine Land Design, Inc. (1) Ranger Construction Industries, Inc. (1) Page: 4/4 Felix Associates of Florida, Inc. Reference Check Overal I Reference Would you Contractor Project Year of Reference Position Final Contract Number of C.O. Number of C.O. due On Time Satisfaction � for Project Namel�ocation Project Contact on the Project Amount due to Time (OIC) to Money (O/C) Completion Rating of 1,2, or hire again for Any additional comments . Information a similar job? Civil Engineer for Yes (unsure how Yes (unsure how Contractor has always been Felix Village Parkway, many...some took many...some took honest and fair to Owner, handled Associates, Phase 2 in Port 2p� � �ennifer Jent City and Project g33,748,024.77 away time and away time and YES 2.75 - 3 YES unexpected issues LLC. St. Lucie, FL �77z370-5785) Manager for various money..due to site money..due to site well...exceptional underground projects in City conditions) conditions) work reat with filter fabrics Walton Road Felix Phenomenal contractor to work Project - US1 to Yes (not at their Yes (not at their Associates John Frank Project Manager for with (Ben Miller and Jim Story - Village Green 2010 $4,413,855.50 request...design request...design YES 3 YES of Fbrida. Drive in Port St. (�72-462-2097) St. Lucie County engineer oversight) engineer oversight) superintende�t)...only issue with Inc. Lucie, FL concrete subcontractor Felix City Center in Yes (4 C.O. due to YES (even Jim Angstadt Engineer for the City changes that City though time Associates, Port St. Lucie, 2009 �772_344-4239) of PoR St. Lucie $�5,047,372.48 No Wanted during the as 2.$ YES LLC. FL project) shortened) Crosstown Yes (Felix asked Best contractor to use for basic Felix Parkway, for additional YES (ahead roadway construction...might have Jim Angstadt Engineer for the City Yes (Construction time Associates, Segment 4 in 2009 $14,206,758.59 compensation for of original 3 YES been able to handle the MOT LLC. Port St. Lucie, �772-344-4239) of Port St. Lucie accelerated time was reduced) schedule) better in residential area FL schedule) Felix Westmoreland �im Angstadt Engineer for the City Yes (nothing Yes (nothing Associates, Blvd. 2007 �772344-4239) of Port St. Lucie $3,205,013.83 significant) significant) YES 2.5 YES LLC. Im rovements in Felix Felix has worked on many jobs at Associates, Port St. Lucie over the years and LLC and is �ot aware of any issues with Port St. Lucie, Laney Southerly Engineer Manager of Felix Florida (772-873-6442) Port St. Lucie - - - - their reputation and business Associates approach; not aware of any major of Florida, problems that would affect the Inc. Tequesta project