Loading...
HomeMy WebLinkAboutAgreements_General_08/30/2012iA ARCADIS Infrastructure, Water ' Environment 'Buildings Village ofTaoueaba 345Tequeata Drive Tequesta, FL 33469 Attn: Michael Couzzo'Village Manager Subject: WTP — Hypochlorite Tank Replacement Dear Mr. Couzzo: RECEIVED AUG 2,7 2012 VILLAGE CLERKS OFFICE Asdiscussed, we visited the WTP|ast week on matters related to operations but noted the condition of the referenced tank. These are the same tanks we had previously recommended for replacement and were planned for incorporation into a construction package to include other important rehabilitation items. We noted that the north tank is leaning slightly. It is not clear whether this as a new development or just previously unnoticed and is also not clear whether it indicates imminent failure, or not. However, it is of significant concern that we feel the effort to replace the tanks should be pursued with a higher degree of urgency. We recommend that design/permit efforts should commence at the earliest possible date. We also recommend that his be treated as an emergency to avoid the delays inherent with conventional bidding. In |ieu, thereof, we recommend that quotes to oeouna and install the bank be obtained from two or three properly licensed Contractors with whom the Vi|leBo, and we, have previous reasonable experience and the project awarded bzthe lowest price company. As we diaouesed, a revised work authorization to cover associated emergency services is included heren, should you agree with this approach and elect to proceed accordingly. Obviously, we will also modify and forward the previous work authorization toreflect the removal ofthese tanks from the prior, larger project. Should you have any questions or wish to discuss anything further, please call. Very truly yours, ARCAD|8U.S,Inc. William O.Reese, P.E Vice President Imagine the result o:�a,rojec*\w^ proj°cts\t"qu°*" 2nM"ou,=hypochlorite tank o82o20,o.doc WATER RESOURCES Date: Contact: William D. Reese, P.E. Phone. 561-087-7089 sm°. wlm=m.reeso@arcad i°-uo=nrn Florida License Numbers Engineering EB0000ro1r Geology o8os4 Surveying VILLAGE OF TEQUESTA WATER SYSTEM AND GENERAL UTILITYICIVIL PROJECTS WORK AUTHORIZATION YTP — Hypochlorite Tank Replacement This Work Authorization authorizes ARCADIS G&M, Inc. to perform the work set forth herein and is issued pursuant to the "Professional Engineering Consulting Services Agreement for Water System and General Utility/Civil Projects", dated November 17, 2005. All terms and conditions of said agreement shall be applicable to this Work Authorization. SCOPE This project includes design, permitting and engineering construction services for the replacement of the sodium hypochlorite tanks at the water treatment plant. The Engineer will perform the following tasks. 1. Prepare finals plans, specifications and bidding documents for the work and review with the owner. 2. Prepare PBCHD permit documents, submit the permit application and act as the owner's liaison with the agency during the permitting process. 3. Prepare a construction cost estimate. 4. Assist the owner with securing a quotation from two or three qualified Contractors. Evaluate the quotes and make a recommendation of award. Note, the project will not be conventionally bid. 5. Perform all `Engineering' duties as set forth in the construction contract and administer the construction contract. 6. Provide part-time inspection services during construction. 7. Provide periodic site visits from the Engineer during construction. 8. Certify project completion to the PB CHIT upon completion. Page 1 of 2 16,410Y " jo COMPENSATION For Scope Items 1 thru 8, the Engineer shall be paid a lump sum fee of twelve thousand dollars ($12,000). The Engineer has assumed all permitting fees will be paid directly to the agencies by the Owner. TIME of PERFORMANCE The Engineer will complete Scope Items I thru 3 within 30 days of the receipt of an executed authorization, exclusive of delays beyond the control of the Engineer. This authorization can be cancelled with or without cause by the Village with 30 days written notice. Should said cancellation occur, the Engineer will be paid for all services performed through the cancellation date. ACCEPTED BY: Village of Tequesta (WTP —Hypochlorite Tank Replacement) Michael R. Couzzo, Village Manager Date: , ARCADIS US, Inc. (PVTP —Hypochlorite Tank Replacement) VWW71ian e5 c, P.E., Vice President I - Of -Z -�/ ( q Date: Page 2 of 2 VILLAGE OF TEQiTESTA WATER SYSTEM ANIS GENERAL UTILITYICIVIL PROJECTS WORK AUTHORIZATION YTP — Hypochlorite Tank Replacement This Work Authorization authorizes ARCADIS G&Ni, Inc. to perform the work set forth herein and is issued pursuant to the "Professional Engineering Consulting Services Agreement for water System and General Utility/Civil Projects", dated November 17, 2005. All terms and conditions of said agreement shall be applicable to this work Authorization. SCOPE This project includes design, permitting and engineering construction services for the replacement of the sodium hypochlorite tanks at the water treatment plant. The Engineer will perform the following tasks. 1. Prepare finals plans, specifications and bidding documents for the work and review with the Owner. 2. Prepare PBCHD permit documents, submit the permit application and act as the owner's liaison with the agency during the permitting process. 3. Prepare a construction cost estimate. 4. Assist the owner with securing a quotation from two or three qualified Contractors. Evaluate the quotes and make a recommendation of award. Note, the project will not be conventionally bid. 5. Perform all 'Engineering' duties as set forth in the construction contract and administer the construction contract. 6. Provide part-time inspection services during construction. 7. Provide periodic site visits from the Engineer during construction. 8. Certify project completion to the PBCHD upon completion. Page l of 2 .pp.. Al 4 COMPENSATION For Scope Items I thru 8, the Engineer shall be paid a lump sum fee of twelve thousand dollars ($12,000). The Engineer has assumed all permitting fees will be paid directly to the agencies by the Owner. The Engineer will complete Scope Items I thru 3 within 30 days of the receipt of an executed authorization, exclusive of delays beyond the control of the Engineer. This authorization can be cancelled with or without cause by the Village with 30 days written notice. Should said cancellation occur, the Engineer will be paid for all services performed through the cancellation date. ACCEPTED BY: Village of Tequesta (WTP —Hypochlorite Tank Replacement) Michael R. Couzzo, Village Manager Date: te>j ARICADIS US, Inc. t JIL (FFTP—kr0Ch'0--*-e Ta-1-1,1tc-Reple, cepient) T W11 lai-171 Page 2 of 2