Loading...
HomeMy WebLinkAboutDocumentation_Regular_Tab 06C_10/14/1993 .. , ` � � � � • VILLAGE OF TEQUESTA ` f •S WATER DEPARTh1ENT • r ' ' � ; " � Post Offic� Box 3474 • 357 Tcyucsta Drivc ° ° Tcyucsta, Florida 33469-0474 • (�307) 575-6230 �f � '� fOVM�• . O � 1 . ��-, • fi,99 2 MEMORANDUM � . oF�• �,�r .� � � u� cn a TO: Thomas G. Bradford, Village Manager FROM: Thomas C. Nall, Water System Manager DATE: October 7, 1993 SUBJECT: Replacement of Emergency Power Automatic Transfer Switch On September 14, 1993, our Water Treatment Facility on Old Dixie Highway experienced several equipment failures due to excessive lightning and power surges during a severe thunderstorm that day. Most of the damage was relatively minor with the exception of our Automatic Transfer Switch (ATS) switching to generator power. Our electrical and instrumentation consultant was contacted as well as representatives from Edwards Electric Corporation. A temporary repair was made on the unit the next day by J. H. Ham Engineering, Inc. This existing unit was bu31t in 1977 and is considered by the manufacturer to be obsolete. To properly repair this unit, which will require replacement of the main circuit boards in the control panel, will cost nearly $4,000 and require twelve weeks for delivery. Parts are not a shelf item and would have to be manufactured. After much deliberation with staff and our consulting engineers, we feel that rather than invest half of the replacement cost in this dinosaur, we should replace this unit with one of a new modern design with upgraded features better suited for our facility. A simple cost analysis is as foliows: Repair Old Unit Replacement Cost: 53,920.00 57,236.00 * Delivery: 12 weeks 6-8 weeks Warranty: 30 days 1 year * includes sequential load controls not installed in existing unit. Recyr.IrJ Pay+cr r ♦ � Thomas G. Bradford RE: Replacement of Emergency Power ATS October 7, 1993 --------------------------------------------- Based upon the recommendations of staff and engineering consultants, we would like to replace our ATS at a cost of $7,236.00. Work to be performed by J.H. Ham Engineering, Inc. of Lakeland, Florida. Please place this important item on the Council Agenda of October 14, 1993 for their approval. Installation of this new ATS will allow staff to eat, sleep and breathe easier when those infamous FPL power outages occur. . TCH/mk.