Loading...
HomeMy WebLinkAboutDocumentation_Regular_Tab 10D_09/14/2000 Memo�andum To: ' Joanu Manganiello, Acting Village Manager/Village Clerk From: Thomas C. Jensen, P.E., Acting Utilities Directo Date: September 6, 2000 . Subject: Village Council Agenda Item for September 14, 2000; Consideration To Award Well Rehabilitation Annual Contract to Aquifer 1Vlaintenance and Performance Systems (AMPS) in the Amount of $44,350, Subject to Funds Being Appropriated for FY 2001, Having a Total Proposed FY 2001 Budget Allocation of $ 20,000. � The contract with Aquitfer Maintena.nce and Performance Systems (AMPS) is set to expire at the end of this fiscal year. We publicly advertised (Sunday, September 3, 2000) and sent out requests to three (3) local firms for costs. The three (3) firms we sent out proposals to are: 1. AMPS 2. Morton Pump & Drilling 3. Well Water Systems We received only one (1) proposal as noted below. Item # Firm � Total Base Pro sal l. Aquifer Maintenance Performance (AlV�S, Inc.) $94,350 3540 SW 46`� Avenue Davie, FL 33314 The other firms felt that they could not compete "cost wise" with AMPS who only do well development work. Note tb.at Well Water System did submit a cost but it was received a day late and was not considered. (Their cost was higher than AMPS). The total base cost includes: pump removal/re-insta.11ation, re-development of well acid treatment and chlorina.tion of each of the Village's ten (10) Surficial Wells. Individual unit costs axe stipulated in the proposal for each well. The Village will typically perform two to three well redevelopments during the year, depending upon the well performance. This will fa11 between the range of $15,000 to $20,000 per year. The contract language includes a clause to extend the contract an additional year if the firm performs well. Note that last year's contract with AMPS was for $89,450.00. We have evaluated AMPS' qualifications and find them to be an acceptable firm. Note, that the awazd should be based upon the availability of current funds. For fiscal yeaz 00/O1, that amount is budgeted at $20,000. Expenditures for FY Ol/02, if the contract is extended., would be subject to funds being appropriated an.d approved by the Village Council for that fiscal yea.r. 7oannn Manganiello RE: Agenda Item; Well Rehabilita.tion September 6, 2000 Page 2 - ---------------------------------------------------------- � I therefore recommend the Village Council award the Well Rehabilitation - Annual contract (FY 00/Ol) to AMPS in the amount of $94,350.00 subject to the FY 00/01 budget being approved by Council in the amount of $20,000. If you have any questions, please give me a call. TC7/mk Atta.chments Agemialtem. WellRehab. � RESOL'OTION NO. 82-99/00 . A RESOLUTION OF THE VILLAGE COUNCIL OF TH VILLAGE OF TEQUESTA, PALM BEACH COUNTY, FLORIDA, APPROVING THE BID AWARD FOR WELL REHABILITATION FOR A 12-MONTH CONTR.ACT (OCTOBER 1, Z000 THROUGH SEPTEMBER 2001), TO AQUIFER MAINTENANCE PERFORMANCE (AMPS) OF DAVIE, FLORIDA, IN THE AMOiJNT OF $94,350, WITH FUNDS FOR FY 2000/2001 BE�NG APPROPRIATED FROM THE WATER ENTERPRISE FUND, HAVING A FY 2000/2001 BUDGET ALLOCA.TION OF $20,000, AND SUBJECT TO FUNUS BEING APPROPRIATED AND APPROVED BY THE VILLAGE COUNCIL FOR FY 2000/2001, AND AUTHORIZING THE ACTING VILLAGE MANAGER TO EXECUTE THE APPLICABLE CONTRACT ON BEHALF OF THE VILLAGE. NOW, THERBFORTs, BL IT RESOLVED BY THB VILLAGL CODNCIL OF THF VILLAGL OF TLQUESTA, PALM BEP,CH COUNTY, FLORIDA, AS FOLLOWS: Section 1. The Contract for Well Rehabilitation wi�h Aquifer MaintenanGe Performance (.AMPS) of Davie, Florida, in the amount of $94,350, attached hereto as Exhibit "A" and incorporated by reference as part of this Resolution is hereby approved subject to funds being appropriated and approved by the Village Council for FY 2000/2001, and the Acting Village Manager is authorized to execute the same on behalf of the Village. THL FORSGOING RESOLIITION WAS OFFERED by Councilmember , who movad its adoption. The motion was seconded � by Councilmember , and• upon being put to a vote, the vote was as follows: FOR ADOPTION AGAINST ADO PTION The Mayor thereupon declared the Resolution duly passed and adopted this 14 day of September, A.D, 2000. MAYOR OF TEQUESTA Joseph N. Capretta ATTEST: Joann Manganiello Village Clerk Reaolution\wellRehab PROPOSAL TO: VILLAGE OF TEQUESTA P.O. BOX 3273 357 TEQUESTA DRIVE TEQUESTA, FLORTDA 33469 FROM: , � -�- ��..� � ��. F� ��� �� � . (Herein�fter referred to as Firm) Gentlemen: The undersigned proposes to furnish all labor, materials, ' equipment, services, and incidentals necessary to perform all work in accordance with the Contract Documents entitled: Village of Tequesta, Well Rehabilitation - Annual Contract. The Firm now submits the following and hereby agrees: 1. The only person(s) interested in this proposal, or P,greement, as principal are named herein; that the proposal is made � without connection with any other person, company, or parties making a proposal; and that it is in all respects fair and in good faith without collusion o� fraud, or other illegal practices. 2. To hold Proposal open vatil aa Agreement has been executed between the Village aad the accepted F'irm, or until sixty (60) calendar days after the bid opening date, whichever is shorter. 3. To enter into and execute an Agreement on the basis of this Proposal, within fifteen (15) calendar days after the award of . the Contract. 4. To start work within ten (10) calendar days of the Date of written authorization for a selected well to be rehabilitated, from the Village/Engineer. Work shall be completed within the number of calendar days specified in Article 3 of the Agreement. 5. In the event of multiplication, addition, or clerical errors on the Proposal Forms, the Village may correct these erro.rs to clarify the Proposals. The information which results in the lowest cost to the Village will be considered correct, and therefore utilized. P-1 00-106we1 BAS� PROPOSAL FORM ESTIMATED ITEM OUANTITY DESCRIPTION � LUMP SUM A. WF�LL REHABILITATION, WELL 7 1.0 Pump Removal/Iaspection For providing the complete mobilization of all equipment, materials and labor necessary to perform the pump removal/inspection outlined within Section 11202, Well Reha.bilitation,. Item A, Pump Removal/Inspection. UNIT PRICE PER PUMP REMOVAL/INSPECTION $,�2�Z /p� Rem./Inspect. 2.0 Mechaaical and Acid Treatmeat Process 2.1 Mechanical. Agitation Process For providing all equipment, materials and labor necessary to perform the mechanical agitation process as outYined within Section 11202, Well Rehabilitation, Item B.1., Mechanical Agitation. 'I7NIT PRICL PER MECHANICAL AGITATION PROCESS $ ��`Jw /Mech Agitation 2, 2 Acid Treaf�aent Process . For providing all equipment, materials and labor necessary to perform the acid treatment process as outlined within Section 11202, Well Rehabilitation, Item B.2.i, Acid Treatment. IINIT PRICL PER ACID TREATMENT PROCTSS $ 2��� /ACid Treatmeat P-2 00-106we1 . ESTIMATED ' � r ITEM OUANTZTY DESCRIPT�ON LUMP SUM 2.3 Prechlorinatioa Treatmeat For providing all equipment, materials and labor necessary to perform the � prechlorination treatment as outlined within Section 11202, Well Rehabilitation, Item B.2.ii, Prechlorination Treatment. IINIT PRICE PER PRTCHLORINATION TRLATMENT $ Z,`��5� /Pre- chlor. Treatmt 3.0 Assembly/Re-iastallat3cn of Pvmp For providing aIl equipment, materials and labor necessary to perform�the complete demobilization, clean-up/ restoration from the site, assembly/reinstallation of pump as outlined within Section 11202, Well Rehabilitation, Item C, , Assembly/Reinstallation of Pump. IINIT PRICE PER ASSFsMBLY/RLINSTALLATION OF PUMP $ � �Z.�J /Asmb � Reiastall. SIIBTOTAL, WELL RTHABILITATION, WELL 7 $ V y P- 3 00-106we1 f BASE PROPOSAL FORM ESTIMATED ITEM OUANTITY DESCRIPTION LUMP SUM B. WELL REHABILITATION, WELL 8 � 1.0 Pump Removal/Inspection For providing the complete mobilization of al.l equipment, materials and labor necessary to perform the pump removal/inspection outlined within Section 11202, Well Rehabilitation, Item A, Pump Removal/Inspection. tTNIT PRICE PLR PUMP REMOVAL/INSPECTION $ �,}°' /p�p Rem. Iaspect. 2.0 Mechaaical aad Acid Treatmeat Process � 201 Mechaaical Ag3tation Process � For providing all equipment, materials and la.bor necessary to perform the mechanical agitatian process as outlined within Section 11202, Well Rehabilitation, Item B.1., Mechanical Agitation. '[TNIT PRICE PER MECHANICAL AGITATION PROCESS $ �J�J`� /Mech � Agitation 2.2 Acid Treatmeat Process For providing all equipment, materials and labor necessary to perform the acid treatment process as outlined within Section 11202, � Well Rehabilitation, Item B.2.i, Acid Treatment. � � IINIT PRICE PER ACID TRFATMENT PROCESS $ �/Acid Treatment P-4 00-106we1 � ESTIMATED ITEM OUANTITY DESCRIPTION LUMP SUM 2.3 Prechlorinatian Treatmen� For providing all equipment, materials and labor necessary to perform the • � prechlorination treatment as outlined within Section 11202, Well Rehabilitation, Item . B.2.ii, Prechlorination Treatment. UNIT PRICL PER PRECHLORINATION TRTATMLNT $�j�'j``= �pr�_ � chlor . Treafiaat 3.0 Assembly/Re-installation of Pump For providing all equ3.pment, materials and labor necessary to perform the complete demobilization, clean-up/ restoration from the site, assembly/reinstallation of pump as outlined within Section 11202, Well Rehabilitation, Item C, Assembly/Reinstallation of Pump. ' IINIT PR=CT PLR ASS�LY/REINSTALLATION OF PIIMP $_ .�.�2,�'S`� /Asntb � & Reiastall. SIIBTOTAL, WLLL REHABILITATI�N, WELL 8 $ 'g`j"�'' • P � 5 , 00-106we1 BAS� PROPOSAL FORM ESTIMATED ITEM OUANTITY DESCRIPTION � LUMP SUM � C. WELL REHABILITATION, WELL 18 1.0 Pump Removal/Iaspectioa For providing the complete mobilization of all equipment, materials and labor necessary . to perform the pump removal/inspection outlined within Section 11202, Well Rehabilitation, Item A, Pump Removal/Inspection. UNIT PRICE PLR PIIMP REMOVAL/INSPECTION $ I Z �/Pump Rem./Iaspeat. 2.0 Mechanical and Acid Treatment Process 2.1 Mechanical Agitatioa Process For providing all equipment, materials and labor necessary to perform the mechanical agitation process as outlined within Section 11202, Well Rehabilitation, Item B.1., Mechanical Agitation. tTNIT PRICE P�R NlECHANICAL AGITATION PROCTSS $� ��'j� /Mech Agitatioa 2.2 Acid Treatment Process For providing all equipment, materials and labor necessary to perform the acid treatment process as outlined within Section 11202, � Well Reha.bilitation, Item B.2.i, Acid Treatment. IINIT PRICE PER ACID TREATMENT PROCE3S $ Z�61��'"" /Acid Treatment P 6 00-106we1 ESTIMATED ITEM OUANTITY DESCRIPTION LUMP SUM 2.3 Prechlorination Treatmeat For providing all equipment, materials and labor necessary to perform the prechlorination treatment as outlined within Section 11202, Well Rehabilitation, Stem B.2.ii, Prechlorination Treatment. UNIT PRICE PER PRECHLOR=NATION TREAZ'NlENT $ 2,5"'�`'`� �p ahlor. Treatmt 3.0 Assembly/Re-iastallation of Pump For providing all equipment, materials and labor necessary to perform the complete demobilization, clean-up/ restoration from the site, assembly/reinstallation of pump as outlined within Section 11202, Well Rehabilitation, Item C, Assembly/Reinstallation of Pump. UNIT PRICE PER ASSEMBLY/REINSTAI,LATION OF PTJMP $�.y2�S` /Asmb � � & Reiastall. SUBTOTAL, WELL REHABILITATION, WELL 18 $� J� P- 7 00-106we1 SASE PROPOSAL FORM ESTIMATED , ITEM OUANTITY DESCRIPTION � LUMP SUM D. WELL REHABILITATION, WELL 19 1.0 Pump Removal/Inspection For providing the complete mobilization of all equipment, materials and la.bor necessary to perform the pump removal/inspection outlined within 5ection 11202, Wel1 Rehabilitation, Item A, Pump Removal/Inspection. IINIT PRICE PTR PUMP REM04AL/INSPECTION $� �p�p Rem./Iaspect. 2.0 Mechaaical and Acid Treatment Process 2.1 Mechanical Agitation Process For providing all equipment, ma�erials and labor necessary to perform the mechanical . agitation process as outlined within Section 11202, Well Rehabilitation, Item B.l., Mechanical Agitation. IINIT PRICE PER MECHANICAL AGITATION PROCESS $ j.,`jgj �/Mech Agitation 2.2 Acid Treatmeat Process For•providing all equipment, materials and labor necessary to perform the acid treatment process as outlined within Section 11202, Well Rehabilitation, Item B.2.i, Acid Treatment. UNIT PRICE PTR ACID TREATMENT PROCESS $ Z�� �/ACid Treatment p-8 ' 00-106we1 ESTIMATED . 2TEM OUANTITY DESCRIPTION LUMP SUM 2.3 Prechloriaation Treatment For providing all equipment, materials and labor necessary to perform the prechlorination treatment as outlined within Section 11202, Well Rehabilitation, Item B.2.ii, Prechlorination Treatment. IINIT PRICL PER PRECHLORINATION TREATMENT $ Z '7� ��pre_ chlor. Treatmt 3.0 Assembly/Re-installatioa of Pump �'or providing all equipment, materials and la.bor necessary to perform the complete demobilization, clean-up/ restoration from the site, assembly/reinstallation of pump as outlined within Section 11202, V�Tell Rehabilitation, Item C, Assembly/Reinstallation of Pump. IINIT PRICL PER ASSEMBLY/REINSTALLATION OF PUMP $ i.,Z��"'- /Asmb & Reinstall. SIIBTOTAL, WELL REHABILITATION, WELL 19 $�,Z..�� � p-9 00-106we1 B�PiSE PROPOSAL FORM ESTIMATED ITEM OUANTITY DESCRIPTION LUMP SUM E. WELL REHABILITATION, WELL 20 , 1..0 Pump Removal/Inspectioa For providing the complete mobilization of all equipment, materials and labor necessary to perform the pump removal/inspection outlined within Section 11202, Well Rehabilitation, Item A, Pump Removal/Inspection. IINIT PRICL PER PUMP REMODAL/INSPECTION $)�T /Pump Rem./Iaspect. 2.0 Mechaaical aad Acid Treatmeat Process 2.1 Mechanical Agitatioa Process For providing all equipment, materials and labor necessary to perform the mechanical agitation process as outlined within section 11202, Well Rehabilitation, Item B.1., Mechanical Agitation. UNIT PRICP PER MECHANICAL AGITATION PROCESS $ S�`J �/Mech . Agitation 2.2 Acid Treatmeat Process For'providing all equipment, materials and la.bor necessary to perform th.e acid treatment process as outlined within Section 11202, Well Reha.bilitation, Item B.2.i, Acid Treatment. UNIT PRICE PER ACID TREATMENT PROCESS $�,��� /ACid Treatment - P-10 00-106we1 ESTIMATED �TEM OUANTITY • DESCRIPTION LUMP SUM 2.3 Prechlorinatiora Treatment For providing all equipment, materials and labor necessary to perform the prechlorination treatment as outlined within Section 11202, Well Rehabilitation, Item B.2.ii, Prechlorination Treatment. 'ONIT PRICE PER PRECALORINATION TREATMENT $ Z,S�S /P=e- chlor. Treatmt 3.0 Assembly/Re-iastallation of Pump For providing all equipment, materials and labor necessary to perform the complete demobilization, clean-up/ restoration from the site, assembly/reinstallation of pump as outlined within Section 11202, Well Rehabilitation, Item C, Assembly/Reinstallation of Pump. UNIT PRICB PER ASSE1�dBLY/REINSTALI,ATION OF PIIMP $ ��'CS` /Asmb & Reix�stall. SIIB�'OTAL, WFLL REHABILITATION, WELL 20 $ U�Z.�`°� _ P• - P-11 00-106we1 SASE PROPOSAL FORM ESTIMATED ITEM OUANTITY DESCRIPTION LUMP SUM F. WFLL REHABILITATION, WELL 23 � 1.0 Pump Removal/Iaspectioa For providing the complete mobilization of all equipment, materials and labor necessary to perform the pump removal/inspection outlined within Section 11202, Well Rehabilitation, Item A, Pump ; Removal/Inspection. UNIT PRICE PLR PIIMP REM04AI,/INSPTCTION $ i��"`� �p� P Rem. =nspect. 2.0 • Mechanical and Acid Treatment Process 2.1 Mechaaical Agitation Process � For providing all equipment, materials and labor necessary to perform the mechanical agitation process as outlined within Section 11202, Well Rehabilitation, Item B.1., Mechanical Agitation. UNIT PRICE PER MECHANICAL AGITATION PROCFSS $�'�`•'� /Mech Agitatioa 2..2 Acid Treatment Process For providing all equipment, materials and labor necessary to perform the acid treatment process as outlined within Section 11202, Well Rehabilitation, Item B.2.i, Acid Treatment. � IINIT PRICE PER ACID TREATMENT PROCBSS $ Z��� /Acid Treatmeat P-1'2 0o-106we1 ESTIMATED ITEM OUANTITY DESCRIPTION LUMP SUM 2.3 Prechlorination Treatment For providing all equipment, materials and labor necessary to perform the prechlorination treatment as outlined within Section 11202, Well Rehabilitation, Item B.2.ii, Prechlorination Treatment. IINIT PRICE PER PRLCFILORINATION TREATMENT $ Z.,�j�J`� /pre- chlor. Treatmt 3.0 Assembly/Re-installatioa of�Pump For providing all equipment, materials and labor necessary to perform the complete demobilization, clean-up/ restoration from the site, assembly/reinstallation of pump as outlined within Section 11202, Well Rehabilitation, Item C, Assembly/Reinstallation of Pump. IINIT PRICE PER ASSEMBLY/RLINSTALLATION OF PIIMP $�,2Yj�' �Agmb & Reinstall. SIIBTOTAL, WELL REHABILITATION, WELL 2 3 $ ��}�'j`'-Z P-13 00-106we1 . SAS� PROPOSAL FORM ESTIMATED ITEM OUANTITY DESCRIPTION LUMP SUM G. WELL REAASILITATION, WLLL 24 � 1.0 Pump itemoval/Iaspection For providing the complete mobilization of all equipment, materials and labor necessary to perform the pump removal/inspection outlined within Section 11202, Well Rehabilitation, Item A, Pump RemovalJInspection. IINIT PRICL PER PIIMP R�'lOVAL/INSPTCTION $ 2��= /p�p Rem.jlaspect. 2.0 Mechanical and Acid Treatment Process 2.1 Mechaniaal Agitation Process For providing all equipment, materials and . labor necessary to perform the mechanical agitation process as outlined within Secti.on 11202, Well Rehabilitation, Item B.1., Mechanical Agitation. UNIT PRICB PER MECHANICAL AGITATION PROCESS $_���'J`�S� /Mach Agitatioa 2.2 Ac3d Treatment Process � . For providing all equipment, materials and lahor necessary to perform the acid treatment process as outlined within Section 11202, Well Rehabilitation, Item B.2.i, Acid Treatment. IINIT PRICE PER ACID TREATMENT PROCESS $_ �.,$C�` /Acid Treatment P-14 00-106we1 ESTIMATED ITEM OUANTITY DESCRIPTION LUMP SUM 2.3 Prechloriaatioa Treatament For providing all equipment, materials and labor necessary to perform the prechlorination treatment as outlined within Section 11202, Well Rehabilitation, Item B.2.ii, Prechlorination Treatment. IINIT PRICB PER PRECHLORINATION TR�ATMENT $ ��1'S'•'� /Pre- � chlor. Treatmt 3.0 ASSembly/Re-iastallatioa of Pump For providing all equipment, materi.als and . labor necessary to perform the complete demobilization, c].ean-up/ restoration from the site, assembly/reinstallation of pump as outlined within Section 11202, Well Rehabilitation, Item C, Assembly/Reinstallation of Pump. IINIT PRICE PLR ASSEMBLY/RLINSTALLATION OF PUMP $��Z.�"'- �,'p�s� � & Reinstall. SIIBTOTAL, W�LL REAABILITATION, WELL 24 $�,L��Cj�= . � P-15 � 00-106we1 , BASL PROPOSAL FORM ESTIMATED ITEM OUANTITY DESCRIPTION LUMP SUM � H. WELL RTHABII�ITATION, WELL Z5 � 1.0 Puinp Removal/Iaspectioa For providing the complete mobilization of all equipment, materials and labor necessary to perform the pump removal/inspection outlined within Section 11202, We11 Rehabilitation, Item A, Pump Removal/Inspection. TJNIT PRICE PER PUMP REMOVAL/INSPECTION $ I��SU`�` /Pump Rem./=aspect. 2.0 Mechanical aad Acid Treatment Process 2.1 Mechanical Ag3tation Process For providing all equipment, materials and labor necessary to perform the mechanical agitation process as outlined within Section 11202, Well Rehabilitation, Item B.1., � Mechanical Agitation. IINIT PRICT PER MECHANICAL AGITATION PROCESS $ I,S9S`� /Mech Agitatioa 2.2 Acid Treatment Process For providing all equipment, materials and labor necessary to perform the acid treatment process as outlined within Section 11202, Well Rehabilitation, Item B.2.i, Acid Treatment. 'DNIT PRICE PTR ACID TREATMENT PROCESS $ ��at /ACid Treatment P-16 00-106we1 ESTIMATED ITEM OUANTITY DESCRIPTION LUMP SUM 2.3 Prechlorination Treatment For providing all equipment,.materials and labor necessary to perform the prechlorination treatment as outlined within Section 11202, Well Rehabilitation, Item B.2.ii, Prechlorination Treatment. IINIT PRICE PER PRECHLORINATION TREATMENT $ Z�J�S`T /pre_ chlor. Treatmt 3.0 Asse�mbly/Re-iastallatioa of Pump For providing all equipment, materials and labor necessary to perform the complete demobilization, clean-up/ restoration from the site, assembly/reinstallation of pump as � outlined within Section 11202, Well Rehabilitation, Item C, Assembly/Reinstallation of Pump. UNIT PRICL PLR ASSEN�LY/REINSTALLATION OF PUMP $ I �Z�'S�'•"- /Asmb & eil� astall. SUBTOTAL, WELL REHABILITATION, WELL 25 $ � t 4�5 4 P-17 00-106we1 BAS� PROPOSAL FORM ESTIMATED ITEM OUANTITY DESCRIPTION LUMP SUM I. Tn1ELL REHABILITATION, WELL 26 . 1e0 Pump Removal/Inspectioa . For providing the complete mobilization of all equipment, materials and labor necessary to perform the pump removal/inspection outlined within Section 11202, Well Rehabilitation, Item A, Pump Removal/Inspection. ' � IINIT PRICE PER PUMP RENl04AL/INSPECTION $ Zjd4:' / Rem./Inspect. 2.0 Mechanical aud Acid Treatment Process 2.1 Mechanical Agitatioa Process For providing all equipment, materials and labor necessary to perform the mechanical agitation process as outlined within Section 11202, Well Rehabilitation, Item B.1., Mechanical Agitation. � UNIT PRICE PER MECHANICAL AGITATION PROCESS $�SW /Mech Agitation 2.2 Acid Treatmeat Process For providing all equipment, materials and labor necessary to perform the acid treatment pro�ess as outlined within Section 11202, Well Rehabilitation, Item B.2.i, Acid Treatment. UNIT PRICF P�R ACID TREATMENT PROCESS $��°� /Acid Treatmeat P-18 00-106we1 ESTIMATED � ZTEM OUANTITY DESCRZPTION LUMP SUM 2.3 Prechloriaatioa Treatment For providing all equipment,' materials and labor necessary to perform the prechlorination treatment as outlined within Section 11202, Well Rehabilitation, Item B.2. Prechlorination Treatment. � UNIT PRICE PER PRECHLORINATION TItFATMENT $ Z,S�JW /Pre- � chlor. Treatmt 3.0 Assembly/Re-iastallatioa of Pvmp For providing all equipment, materials and labor necessary to p�rform the complete� demobilization, clean-up/ restoration from the site, assembl.y/reinstallation of pump as outlined within Section 11202, Well Rehabilitation, Item C, Assembly/Reinstallation of Pump. IINIT PRICE PTR ASS7sMBLY/REINSTALLATION OF PUMP $�.,2�"" /Asmb & Re3nsta1l. . SIIBTOTAL, WELL RTHABILITATION, WELL 26 $�,� �S= p- 00-106we1 , ' SASE PROPOSAI+ FORM ESTIMATED � ITEM OUANTITY DESCRIPTION LUMP SUM J. WELL RLHABILITAT=ON, WLLL 27 1.0 Pump Removal/Inspectioa � ' For providing the complete mobilization of all equipment, materials and labor necessary to perform the pump removal/inspection outlined within Section 11202, Well Reha.bilitation, Item A, Pump Removal/Inspection. UNIT PRICE PER PUMP REMOVAL/INSPLCTION $� 2�� /Putnp Rem. IaspeCt. 2.0 Mechaaical and Acid Treatment Process � 2.1 Mechanical Agitation Process For providing all equipment, materials and . labor necessary to perform the mechanical agitation process as outlined within Section 11202, Well Rehabilitation, Item B.1., Mechanical Agitation. UNIT PRICE PTR MECHANICAL AGITATION PROCPSS $ �� /Mech Agitation 2.2 Acid Treatmeat Process For providing all equipment, materials and labor necessary to perform the acid treatment pracess as outlined within Section 11202, Well Rehabilitation, Item B.2.i, Acid Treatment. IINIT PRICB PI�R ACID TREATMENT PROCBSS $ `� � Z' /Acid Treatment P -20 00-106we1 ti ESTIMATED ITEM OUANTITY DESCRIPTION LUMP SUM 2:3 Prechloriaatioa Treatmeat For providing all equipment, materials and labor necessary to perform the prechlorination treatment as outlined within Section 11202, Well Rehabilitation, Item . B.2.ii, Prechlorination Treatment. UNIT PRICB PER PRECHLORINATION TRPATMENT $ z /pre- chlor. Treatmt 3.0 Assembly/Re-iastallation of Pump For providing all equipment, materials and labor necessary to perform the complete demobilization, clean-up/ restoration from the site, assembly/reinstallation of pump as outlined within Section 11202, Well Rehabilitation, Item C, Assembly/Reinstallation of Pump. 'ONIT PRICI� PER ASSEMBI�Y/REINSTALLATION OF PUMP $�.,'Z�` /Asznb & Reinstall. SIIBTOTAL, WELL REHABILITATION, WELL 27 $���>"� TOTAL, TnTELL REHABILITATION $ 'JSC�`� t (Wells 7,8,18,19,20,23,24,25,26,27) ADDITIV'E ALTERNATL ADJIISTMENTSt 4.0 For providing a video on the specific well being rehabilitated as requested by the Owner/Engineer. P�R VIDEO PRICE OF $ ��� 5.0 For providing more or less than eight (8) hours of mechanical agitation. � PER HOUR COST OF $ ��� P-21 00-106we1 � o� The following is a complete list of the subcontractors to be used if the undersigned is awarded the Contract for this project. The subcontractors for the electrical and instrumentation must be included as well as any subcontract�r performing more than $5,000 work (equipment and labor) on the project. If the General Contractor will be performing any of the electrical or instrumentation work with their own forces, indicate below. Subcontractors named below may not be changed by the Contractor. The Owner may request a change under the terms of applicable sections of the General Conditions. Type of Work Name and Address of Subcontractor � I �' �� r ,� P' 22 00-106we1