HomeMy WebLinkAboutDocumentation_Regular_Tab 10D_09/14/2000 Memo�andum
To: ' Joanu Manganiello, Acting Village Manager/Village Clerk
From: Thomas C. Jensen, P.E., Acting Utilities Directo
Date: September 6, 2000 .
Subject: Village Council Agenda Item for September 14, 2000; Consideration To
Award Well Rehabilitation Annual Contract to Aquifer 1Vlaintenance and
Performance Systems (AMPS) in the Amount of $44,350, Subject to Funds
Being Appropriated for FY 2001, Having a Total Proposed FY 2001
Budget Allocation of $ 20,000. �
The contract with Aquitfer Maintena.nce and Performance Systems (AMPS) is set to expire at the end
of this fiscal year. We publicly advertised (Sunday, September 3, 2000) and sent out requests to
three (3) local firms for costs. The three (3) firms we sent out proposals to are:
1. AMPS
2. Morton Pump & Drilling
3. Well Water Systems
We received only one (1) proposal as noted below.
Item # Firm � Total Base Pro sal
l. Aquifer Maintenance Performance
(AlV�S, Inc.) $94,350
3540 SW 46`� Avenue
Davie, FL 33314
The other firms felt that they could not compete "cost wise" with AMPS who only do well
development work. Note tb.at Well Water System did submit a cost but it was received a day late
and was not considered. (Their cost was higher than AMPS).
The total base cost includes: pump removal/re-insta.11ation, re-development of well acid treatment
and chlorina.tion of each of the Village's ten (10) Surficial Wells. Individual unit costs axe stipulated
in the proposal for each well. The Village will typically perform two to three well redevelopments
during the year, depending upon the well performance. This will fa11 between the range of $15,000
to $20,000 per year. The contract language includes a clause to extend the contract an additional
year if the firm performs well. Note that last year's contract with AMPS was for $89,450.00.
We have evaluated AMPS' qualifications and find them to be an acceptable firm. Note, that the
awazd should be based upon the availability of current funds. For fiscal yeaz 00/O1, that amount is
budgeted at $20,000. Expenditures for FY Ol/02, if the contract is extended., would be subject to
funds being appropriated an.d approved by the Village Council for that fiscal yea.r.
7oannn Manganiello
RE: Agenda Item; Well Rehabilita.tion
September 6, 2000
Page 2 -
---------------------------------------------------------- �
I therefore recommend the Village Council award the Well Rehabilitation - Annual contract (FY
00/Ol) to AMPS in the amount of $94,350.00 subject to the FY 00/01 budget being approved by
Council in the amount of $20,000.
If you have any questions, please give me a call.
TC7/mk
Atta.chments
Agemialtem. WellRehab.
�
RESOL'OTION NO. 82-99/00 .
A RESOLUTION OF THE VILLAGE COUNCIL OF TH
VILLAGE OF TEQUESTA, PALM BEACH COUNTY,
FLORIDA, APPROVING THE BID AWARD FOR WELL
REHABILITATION FOR A 12-MONTH CONTR.ACT
(OCTOBER 1, Z000 THROUGH SEPTEMBER 2001), TO
AQUIFER MAINTENANCE PERFORMANCE (AMPS) OF
DAVIE, FLORIDA, IN THE AMOiJNT OF $94,350, WITH
FUNDS FOR FY 2000/2001 BE�NG APPROPRIATED FROM
THE WATER ENTERPRISE FUND, HAVING A FY
2000/2001 BUDGET ALLOCA.TION OF $20,000, AND
SUBJECT TO FUNUS BEING APPROPRIATED AND
APPROVED BY THE VILLAGE COUNCIL FOR FY
2000/2001, AND AUTHORIZING THE ACTING VILLAGE
MANAGER TO EXECUTE THE APPLICABLE CONTRACT ON
BEHALF OF THE VILLAGE.
NOW, THERBFORTs, BL IT RESOLVED BY THB VILLAGL
CODNCIL OF THF VILLAGL OF TLQUESTA, PALM BEP,CH
COUNTY, FLORIDA, AS FOLLOWS:
Section 1. The Contract for Well Rehabilitation
wi�h Aquifer MaintenanGe Performance (.AMPS)
of Davie, Florida, in the amount of $94,350,
attached hereto as Exhibit "A" and incorporated by
reference as part of this Resolution is hereby
approved subject to funds being appropriated and
approved by the Village Council for FY 2000/2001,
and the Acting Village Manager is authorized to
execute the same on behalf of the Village.
THL FORSGOING RESOLIITION WAS OFFERED by
Councilmember , who movad its
adoption. The motion was seconded � by
Councilmember , and• upon being
put to a vote, the vote was as follows:
FOR ADOPTION AGAINST ADO PTION
The Mayor thereupon declared the Resolution duly
passed and adopted this 14 day of September, A.D,
2000.
MAYOR OF TEQUESTA
Joseph N. Capretta
ATTEST:
Joann Manganiello
Village Clerk
Reaolution\wellRehab
PROPOSAL
TO: VILLAGE OF TEQUESTA
P.O. BOX 3273
357 TEQUESTA DRIVE
TEQUESTA, FLORTDA 33469
FROM: , �
-�- ��..�
�
��. F� ��� �� � .
(Herein�fter referred to as Firm)
Gentlemen:
The undersigned proposes to furnish all labor, materials, '
equipment, services, and incidentals necessary to perform all work
in accordance with the Contract Documents entitled: Village of
Tequesta, Well Rehabilitation - Annual Contract.
The Firm now submits the following and hereby agrees:
1. The only person(s) interested in this proposal, or P,greement,
as principal are named herein; that the proposal is made �
without connection with any other person, company, or parties
making a proposal; and that it is in all respects fair and in
good faith without collusion o� fraud, or other illegal
practices.
2. To hold Proposal open vatil aa Agreement has been executed
between the Village aad the accepted F'irm, or until sixty (60)
calendar days after the bid opening date, whichever is
shorter.
3. To enter into and execute an Agreement on the basis of this
Proposal, within fifteen (15) calendar days after the award of
. the Contract.
4. To start work within ten (10) calendar days of the Date of
written authorization for a selected well to be rehabilitated,
from the Village/Engineer. Work shall be completed within the
number of calendar days specified in Article 3 of the
Agreement.
5. In the event of multiplication, addition, or clerical errors
on the Proposal Forms, the Village may correct these erro.rs to
clarify the Proposals. The information which results in the
lowest cost to the Village will be considered correct, and
therefore utilized.
P-1 00-106we1
BAS� PROPOSAL FORM
ESTIMATED
ITEM OUANTITY DESCRIPTION � LUMP SUM
A. WF�LL REHABILITATION, WELL 7
1.0 Pump Removal/Iaspection
For providing the complete mobilization of
all equipment, materials and labor necessary
to perform the pump removal/inspection
outlined within Section 11202, Well
Reha.bilitation,. Item A, Pump
Removal/Inspection.
UNIT PRICE PER PUMP REMOVAL/INSPECTION $,�2�Z /p�
Rem./Inspect.
2.0 Mechaaical and Acid Treatmeat Process
2.1 Mechanical. Agitation Process
For providing all equipment, materials and
labor necessary to perform the mechanical
agitation process as outYined within Section
11202, Well Rehabilitation, Item B.1.,
Mechanical Agitation.
'I7NIT PRICL PER MECHANICAL AGITATION PROCESS $ ��`Jw /Mech
Agitation
2, 2 Acid Treaf�aent Process
. For providing all equipment, materials and
labor necessary to perform the acid treatment
process as outlined within Section 11202,
Well Rehabilitation, Item B.2.i, Acid
Treatment.
IINIT PRICL PER ACID TREATMENT PROCTSS $ 2��� /ACid
Treatmeat
P-2 00-106we1
.
ESTIMATED ' �
r ITEM OUANTZTY DESCRIPT�ON LUMP SUM
2.3 Prechlorinatioa Treatmeat
For providing all equipment, materials and
labor necessary to perform the
� prechlorination treatment as outlined within
Section 11202, Well Rehabilitation, Item
B.2.ii, Prechlorination Treatment.
IINIT PRICE PER PRTCHLORINATION TRLATMENT $ Z,`��5� /Pre-
chlor. Treatmt
3.0 Assembly/Re-iastallat3cn of Pvmp
For providing aIl equipment, materials and
labor necessary to perform�the complete
demobilization, clean-up/ restoration from
the site, assembly/reinstallation of pump as
outlined within Section 11202, Well
Rehabilitation, Item C, ,
Assembly/Reinstallation of Pump.
IINIT PRICE PER ASSFsMBLY/RLINSTALLATION OF PUMP $ � �Z.�J /Asmb
� Reiastall.
SIIBTOTAL, WELL RTHABILITATION, WELL 7 $ V y
P- 3 00-106we1
f
BASE PROPOSAL FORM
ESTIMATED
ITEM OUANTITY DESCRIPTION LUMP SUM
B. WELL REHABILITATION, WELL 8 �
1.0 Pump Removal/Inspection
For providing the complete mobilization of
al.l equipment, materials and labor necessary
to perform the pump removal/inspection
outlined within Section 11202, Well
Rehabilitation, Item A, Pump
Removal/Inspection.
tTNIT PRICE PLR PUMP REMOVAL/INSPECTION $ �,}°' /p�p
Rem. Iaspect.
2.0 Mechaaical aad Acid Treatmeat Process
� 201 Mechaaical Ag3tation Process �
For providing all equipment, materials and
la.bor necessary to perform the mechanical
agitatian process as outlined within Section
11202, Well Rehabilitation, Item B.1.,
Mechanical Agitation.
'[TNIT PRICE PER MECHANICAL AGITATION PROCESS $ �J�J`� /Mech
� Agitation
2.2 Acid Treatmeat Process
For providing all equipment, materials and
labor necessary to perform the acid treatment
process as outlined within Section 11202,
� Well Rehabilitation, Item B.2.i, Acid
Treatment. � �
IINIT PRICE PER ACID TRFATMENT PROCESS $ �/Acid
Treatment
P-4 00-106we1
�
ESTIMATED
ITEM OUANTITY DESCRIPTION LUMP SUM
2.3 Prechlorinatian Treatmen�
For providing all equipment, materials and
labor necessary to perform the •
� prechlorination treatment as outlined within
Section 11202, Well Rehabilitation, Item .
B.2.ii, Prechlorination Treatment.
UNIT PRICL PER PRECHLORINATION TRTATMLNT $�j�'j``= �pr�_
� chlor . Treafiaat
3.0 Assembly/Re-installation of Pump
For providing all equ3.pment, materials and
labor necessary to perform the complete
demobilization, clean-up/ restoration from
the site, assembly/reinstallation of pump as
outlined within Section 11202, Well
Rehabilitation, Item C,
Assembly/Reinstallation of Pump. '
IINIT PR=CT PLR ASS�LY/REINSTALLATION OF PIIMP $_ .�.�2,�'S`� /Asntb
� & Reiastall.
SIIBTOTAL, WLLL REHABILITATI�N, WELL 8 $ 'g`j"�''
• P � 5 , 00-106we1
BAS� PROPOSAL FORM
ESTIMATED
ITEM OUANTITY DESCRIPTION � LUMP SUM
� C. WELL REHABILITATION, WELL 18
1.0 Pump Removal/Iaspectioa
For providing the complete mobilization of
all equipment, materials and labor necessary .
to perform the pump removal/inspection
outlined within Section 11202, Well
Rehabilitation, Item A, Pump
Removal/Inspection.
UNIT PRICE PLR PIIMP REMOVAL/INSPECTION $ I Z �/Pump
Rem./Iaspeat.
2.0 Mechanical and Acid Treatment Process
2.1 Mechanical Agitatioa Process
For providing all equipment, materials and
labor necessary to perform the mechanical
agitation process as outlined within Section
11202, Well Rehabilitation, Item B.1.,
Mechanical Agitation.
tTNIT PRICE P�R NlECHANICAL AGITATION PROCTSS $� ��'j� /Mech
Agitatioa
2.2 Acid Treatment Process
For providing all equipment, materials and
labor necessary to perform the acid treatment
process as outlined within Section 11202,
� Well Reha.bilitation, Item B.2.i, Acid
Treatment.
IINIT PRICE PER ACID TREATMENT PROCE3S $ Z�61��'"" /Acid
Treatment
P 6 00-106we1
ESTIMATED
ITEM OUANTITY DESCRIPTION LUMP SUM
2.3 Prechlorination Treatmeat
For providing all equipment, materials and
labor necessary to perform the
prechlorination treatment as outlined within
Section 11202, Well Rehabilitation, Stem
B.2.ii, Prechlorination Treatment.
UNIT PRICE PER PRECHLOR=NATION TREAZ'NlENT $ 2,5"'�`'`� �p
ahlor. Treatmt
3.0 Assembly/Re-iastallation of Pump
For providing all equipment, materials and
labor necessary to perform the complete
demobilization, clean-up/ restoration from
the site, assembly/reinstallation of pump as
outlined within Section 11202, Well
Rehabilitation, Item C,
Assembly/Reinstallation of Pump.
UNIT PRICE PER ASSEMBLY/REINSTAI,LATION OF PTJMP $�.y2�S` /Asmb �
� & Reiastall.
SUBTOTAL, WELL REHABILITATION, WELL 18 $� J�
P- 7 00-106we1
SASE PROPOSAL FORM
ESTIMATED ,
ITEM OUANTITY DESCRIPTION � LUMP SUM
D. WELL REHABILITATION, WELL 19
1.0 Pump Removal/Inspection
For providing the complete mobilization of
all equipment, materials and la.bor necessary
to perform the pump removal/inspection
outlined within 5ection 11202, Wel1
Rehabilitation, Item A, Pump
Removal/Inspection.
IINIT PRICE PTR PUMP REM04AL/INSPECTION $� �p�p
Rem./Iaspect.
2.0 Mechaaical and Acid Treatment Process
2.1 Mechanical Agitation Process
For providing all equipment, ma�erials and
labor necessary to perform the mechanical
. agitation process as outlined within Section
11202, Well Rehabilitation, Item B.l.,
Mechanical Agitation.
IINIT PRICE PER MECHANICAL AGITATION PROCESS $ j.,`jgj �/Mech
Agitation
2.2 Acid Treatmeat Process
For•providing all equipment, materials and
labor necessary to perform the acid treatment
process as outlined within Section 11202,
Well Rehabilitation, Item B.2.i, Acid
Treatment.
UNIT PRICE PTR ACID TREATMENT PROCESS $ Z�� �/ACid
Treatment
p-8 ' 00-106we1
ESTIMATED .
2TEM OUANTITY DESCRIPTION LUMP SUM
2.3 Prechloriaation Treatment
For providing all equipment, materials and
labor necessary to perform the
prechlorination treatment as outlined within
Section 11202, Well Rehabilitation, Item
B.2.ii, Prechlorination Treatment.
IINIT PRICL PER PRECHLORINATION TREATMENT $ Z '7� ��pre_
chlor. Treatmt
3.0 Assembly/Re-installatioa of Pump
�'or providing all equipment, materials and
la.bor necessary to perform the complete
demobilization, clean-up/ restoration from
the site, assembly/reinstallation of pump as
outlined within Section 11202, V�Tell
Rehabilitation, Item C,
Assembly/Reinstallation of Pump.
IINIT PRICL PER ASSEMBLY/REINSTALLATION OF PUMP $ i.,Z��"'- /Asmb
& Reinstall.
SIIBTOTAL, WELL REHABILITATION, WELL 19 $�,Z..�� �
p-9 00-106we1
B�PiSE PROPOSAL FORM
ESTIMATED
ITEM OUANTITY DESCRIPTION LUMP SUM
E. WELL REHABILITATION, WELL 20 ,
1..0 Pump Removal/Inspectioa
For providing the complete mobilization of
all equipment, materials and labor necessary
to perform the pump removal/inspection
outlined within Section 11202, Well
Rehabilitation, Item A, Pump
Removal/Inspection.
IINIT PRICL PER PUMP REMODAL/INSPECTION $)�T /Pump
Rem./Iaspect.
2.0 Mechaaical aad Acid Treatmeat Process
2.1 Mechanical Agitatioa Process
For providing all equipment, materials and
labor necessary to perform the mechanical
agitation process as outlined within section
11202, Well Rehabilitation, Item B.1.,
Mechanical Agitation.
UNIT PRICP PER MECHANICAL AGITATION PROCESS $ S�`J �/Mech
. Agitation
2.2 Acid Treatmeat Process
For'providing all equipment, materials and
la.bor necessary to perform th.e acid treatment
process as outlined within Section 11202,
Well Reha.bilitation, Item B.2.i, Acid
Treatment.
UNIT PRICE PER ACID TREATMENT PROCESS $�,��� /ACid
Treatment
- P-10 00-106we1
ESTIMATED
�TEM OUANTITY • DESCRIPTION LUMP SUM
2.3 Prechlorinatiora Treatment
For providing all equipment, materials and
labor necessary to perform the
prechlorination treatment as outlined within
Section 11202, Well Rehabilitation, Item
B.2.ii, Prechlorination Treatment.
'ONIT PRICE PER PRECALORINATION TREATMENT $ Z,S�S /P=e-
chlor. Treatmt
3.0 Assembly/Re-iastallation of Pump
For providing all equipment, materials and
labor necessary to perform the complete
demobilization, clean-up/ restoration from
the site, assembly/reinstallation of pump as
outlined within Section 11202, Well
Rehabilitation, Item C,
Assembly/Reinstallation of Pump.
UNIT PRICB PER ASSE1�dBLY/REINSTALI,ATION OF PIIMP $ ��'CS` /Asmb
& Reix�stall.
SIIB�'OTAL, WFLL REHABILITATION, WELL 20 $ U�Z.�`°� _
P•
- P-11 00-106we1
SASE PROPOSAL FORM
ESTIMATED
ITEM OUANTITY DESCRIPTION LUMP SUM
F. WFLL REHABILITATION, WELL 23 �
1.0 Pump Removal/Iaspectioa
For providing the complete mobilization of
all equipment, materials and labor necessary
to perform the pump removal/inspection
outlined within Section 11202, Well
Rehabilitation, Item A, Pump ;
Removal/Inspection.
UNIT PRICE PLR PIIMP REM04AI,/INSPTCTION $ i��"`� �p�
P
Rem. =nspect.
2.0 • Mechanical and Acid Treatment Process
2.1 Mechaaical Agitation Process
� For providing all equipment, materials and
labor necessary to perform the mechanical
agitation process as outlined within Section
11202, Well Rehabilitation, Item B.1.,
Mechanical Agitation.
UNIT PRICE PER MECHANICAL AGITATION PROCFSS $�'�`•'� /Mech
Agitatioa
2..2 Acid Treatment Process
For providing all equipment, materials and
labor necessary to perform the acid treatment
process as outlined within Section 11202,
Well Rehabilitation, Item B.2.i, Acid
Treatment. �
IINIT PRICE PER ACID TREATMENT PROCBSS $ Z��� /Acid
Treatmeat
P-1'2 0o-106we1
ESTIMATED
ITEM OUANTITY DESCRIPTION LUMP SUM
2.3 Prechlorination Treatment
For providing all equipment, materials and
labor necessary to perform the
prechlorination treatment as outlined within
Section 11202, Well Rehabilitation, Item
B.2.ii, Prechlorination Treatment.
IINIT PRICE PER PRLCFILORINATION TREATMENT $ Z.,�j�J`� /pre-
chlor. Treatmt
3.0 Assembly/Re-installatioa of�Pump
For providing all equipment, materials and
labor necessary to perform the complete
demobilization, clean-up/ restoration from
the site, assembly/reinstallation of pump as
outlined within Section 11202, Well
Rehabilitation, Item C,
Assembly/Reinstallation of Pump.
IINIT PRICE PER ASSEMBLY/RLINSTALLATION OF PIIMP $�,2Yj�' �Agmb
& Reinstall.
SIIBTOTAL, WELL REHABILITATION, WELL 2 3 $ ��}�'j`'-Z
P-13 00-106we1
. SAS� PROPOSAL FORM
ESTIMATED
ITEM OUANTITY DESCRIPTION LUMP SUM
G. WELL REAASILITATION, WLLL 24 �
1.0 Pump itemoval/Iaspection
For providing the complete mobilization of
all equipment, materials and labor necessary
to perform the pump removal/inspection
outlined within Section 11202, Well
Rehabilitation, Item A, Pump
RemovalJInspection.
IINIT PRICL PER PIIMP R�'lOVAL/INSPTCTION $ 2��= /p�p
Rem.jlaspect.
2.0 Mechanical and Acid Treatment Process
2.1 Mechaniaal Agitation Process
For providing all equipment, materials and
. labor necessary to perform the mechanical
agitation process as outlined within Secti.on
11202, Well Rehabilitation, Item B.1.,
Mechanical Agitation.
UNIT PRICB PER MECHANICAL AGITATION PROCESS $_���'J`�S� /Mach
Agitatioa
2.2 Ac3d Treatment Process
� . For providing all equipment, materials and
lahor necessary to perform the acid treatment
process as outlined within Section 11202,
Well Rehabilitation, Item B.2.i, Acid
Treatment.
IINIT PRICE PER ACID TREATMENT PROCESS $_ �.,$C�` /Acid
Treatment
P-14 00-106we1
ESTIMATED
ITEM OUANTITY DESCRIPTION LUMP SUM
2.3 Prechloriaatioa Treatament
For providing all equipment, materials and
labor necessary to perform the
prechlorination treatment as outlined within
Section 11202, Well Rehabilitation, Item
B.2.ii, Prechlorination Treatment.
IINIT PRICB PER PRECHLORINATION TR�ATMENT $ ��1'S'•'� /Pre-
� chlor. Treatmt
3.0 ASSembly/Re-iastallatioa of Pump
For providing all equipment, materi.als and
. labor necessary to perform the complete
demobilization, c].ean-up/ restoration from
the site, assembly/reinstallation of pump as
outlined within Section 11202, Well
Rehabilitation, Item C,
Assembly/Reinstallation of Pump.
IINIT PRICE PLR ASSEMBLY/RLINSTALLATION OF PUMP $��Z.�"'- �,'p�s�
� & Reinstall.
SIIBTOTAL, W�LL REAABILITATION, WELL 24 $�,L��Cj�= .
� P-15 � 00-106we1
,
BASL PROPOSAL FORM
ESTIMATED
ITEM OUANTITY DESCRIPTION LUMP SUM �
H. WELL RTHABII�ITATION, WELL Z5 �
1.0 Puinp Removal/Iaspectioa
For providing the complete mobilization of
all equipment, materials and labor necessary
to perform the pump removal/inspection
outlined within Section 11202, We11
Rehabilitation, Item A, Pump
Removal/Inspection.
TJNIT PRICE PER PUMP REMOVAL/INSPECTION $ I��SU`�` /Pump
Rem./=aspect.
2.0 Mechanical aad Acid Treatment Process
2.1 Mechanical Ag3tation Process
For providing all equipment, materials and
labor necessary to perform the mechanical
agitation process as outlined within Section
11202, Well Rehabilitation, Item B.1., �
Mechanical Agitation.
IINIT PRICT PER MECHANICAL AGITATION PROCESS $ I,S9S`� /Mech
Agitatioa
2.2 Acid Treatment Process
For providing all equipment, materials and
labor necessary to perform the acid treatment
process as outlined within Section 11202,
Well Rehabilitation, Item B.2.i, Acid
Treatment.
'DNIT PRICE PTR ACID TREATMENT PROCESS $ ��at /ACid
Treatment
P-16 00-106we1
ESTIMATED
ITEM OUANTITY DESCRIPTION LUMP SUM
2.3 Prechlorination Treatment
For providing all equipment,.materials and
labor necessary to perform the
prechlorination treatment as outlined within
Section 11202, Well Rehabilitation, Item
B.2.ii, Prechlorination Treatment.
IINIT PRICE PER PRECHLORINATION TREATMENT $ Z�J�S`T /pre_
chlor. Treatmt
3.0 Asse�mbly/Re-iastallatioa of Pump
For providing all equipment, materials and
labor necessary to perform the complete
demobilization, clean-up/ restoration from
the site, assembly/reinstallation of pump as
� outlined within Section 11202, Well
Rehabilitation, Item C,
Assembly/Reinstallation of Pump.
UNIT PRICL PLR ASSEN�LY/REINSTALLATION OF PUMP $ I �Z�'S�'•"- /Asmb
& eil� astall.
SUBTOTAL, WELL REHABILITATION, WELL 25 $ � t 4�5 4
P-17 00-106we1
BAS� PROPOSAL FORM
ESTIMATED
ITEM OUANTITY DESCRIPTION LUMP SUM
I. Tn1ELL REHABILITATION, WELL 26 .
1e0 Pump Removal/Inspectioa .
For providing the complete mobilization of
all equipment, materials and labor necessary
to perform the pump removal/inspection
outlined within Section 11202, Well
Rehabilitation, Item A, Pump
Removal/Inspection. ' �
IINIT PRICE PER PUMP RENl04AL/INSPECTION $ Zjd4:' /
Rem./Inspect.
2.0 Mechanical aud Acid Treatment Process
2.1 Mechanical Agitatioa Process
For providing all equipment, materials and
labor necessary to perform the mechanical
agitation process as outlined within Section
11202, Well Rehabilitation, Item B.1.,
Mechanical Agitation. �
UNIT PRICE PER MECHANICAL AGITATION PROCESS $�SW /Mech
Agitation
2.2 Acid Treatmeat Process
For providing all equipment, materials and
labor necessary to perform the acid treatment
pro�ess as outlined within Section 11202,
Well Rehabilitation, Item B.2.i, Acid
Treatment.
UNIT PRICF P�R ACID TREATMENT PROCESS $��°� /Acid
Treatmeat
P-18 00-106we1
ESTIMATED
� ZTEM OUANTITY DESCRZPTION LUMP SUM
2.3 Prechloriaatioa Treatment
For providing all equipment,' materials and
labor necessary to perform the
prechlorination treatment as outlined within
Section 11202, Well Rehabilitation, Item
B.2. Prechlorination Treatment. �
UNIT PRICE PER PRECHLORINATION TItFATMENT $ Z,S�JW /Pre- �
chlor. Treatmt
3.0 Assembly/Re-iastallatioa of Pvmp
For providing all equipment, materials and
labor necessary to p�rform the complete�
demobilization, clean-up/ restoration from
the site, assembl.y/reinstallation of pump as
outlined within Section 11202, Well
Rehabilitation, Item C,
Assembly/Reinstallation of Pump.
IINIT PRICE PTR ASS7sMBLY/REINSTALLATION OF PUMP $�.,2�"" /Asmb
& Re3nsta1l.
. SIIBTOTAL, WELL RTHABILITATION, WELL 26 $�,� �S=
p- 00-106we1
, '
SASE PROPOSAI+ FORM
ESTIMATED �
ITEM OUANTITY DESCRIPTION LUMP SUM
J. WELL RLHABILITAT=ON, WLLL 27
1.0 Pump Removal/Inspectioa �
' For providing the complete mobilization of
all equipment, materials and labor necessary
to perform the pump removal/inspection
outlined within Section 11202, Well
Reha.bilitation, Item A, Pump
Removal/Inspection.
UNIT PRICE PER PUMP REMOVAL/INSPLCTION $� 2�� /Putnp
Rem. IaspeCt.
2.0 Mechaaical and Acid Treatment Process
� 2.1 Mechanical Agitation Process
For providing all equipment, materials and
. labor necessary to perform the mechanical
agitation process as outlined within Section
11202, Well Rehabilitation, Item B.1.,
Mechanical Agitation.
UNIT PRICE PTR MECHANICAL AGITATION PROCPSS $ �� /Mech
Agitation
2.2 Acid Treatmeat Process
For providing all equipment, materials and
labor necessary to perform the acid treatment
pracess as outlined within Section 11202,
Well Rehabilitation, Item B.2.i, Acid
Treatment.
IINIT PRICB PI�R ACID TREATMENT PROCBSS $ `� � Z' /Acid
Treatment
P -20 00-106we1
ti
ESTIMATED
ITEM OUANTITY DESCRIPTION LUMP SUM
2:3 Prechloriaatioa Treatmeat
For providing all equipment, materials and
labor necessary to perform the
prechlorination treatment as outlined within
Section 11202, Well Rehabilitation, Item
. B.2.ii, Prechlorination Treatment.
UNIT PRICB PER PRECHLORINATION TRPATMENT $ z /pre-
chlor. Treatmt
3.0 Assembly/Re-iastallation of Pump
For providing all equipment, materials and
labor necessary to perform the complete
demobilization, clean-up/ restoration from
the site, assembly/reinstallation of pump as
outlined within Section 11202, Well
Rehabilitation, Item C,
Assembly/Reinstallation of Pump.
'ONIT PRICI� PER ASSEMBI�Y/REINSTALLATION OF PUMP $�.,'Z�` /Asznb
& Reinstall.
SIIBTOTAL, WELL REHABILITATION, WELL 27 $���>"�
TOTAL, TnTELL REHABILITATION $ 'JSC�`�
t
(Wells 7,8,18,19,20,23,24,25,26,27)
ADDITIV'E ALTERNATL ADJIISTMENTSt
4.0 For providing a video on the specific well being
rehabilitated as requested by the Owner/Engineer.
P�R VIDEO PRICE OF $ ���
5.0 For providing more or less than eight (8) hours of
mechanical agitation.
� PER HOUR COST OF $ ���
P-21 00-106we1
� o�
The following is a complete list of the subcontractors to be used
if the undersigned is awarded the Contract for this project. The
subcontractors for the electrical and instrumentation must be
included as well as any subcontract�r performing more than $5,000
work (equipment and labor) on the project. If the General
Contractor will be performing any of the electrical or
instrumentation work with their own forces, indicate below.
Subcontractors named below may not be changed by the Contractor.
The Owner may request a change under the terms of applicable
sections of the General Conditions.
Type of Work Name and Address of Subcontractor
� I �' ��
r ,�
P' 22 00-106we1