Loading...
HomeMy WebLinkAboutDocumentation_Regular_Tab 07G_08/30/1994 , � * � ' � � VILLAGE OF TEQUESTA � ' � � WATER DEPARTMENT - Post Office Box 3474 • 357 Tequesta Drive �.' �" Tequesta, Florida 33469-0474 • (407) 575-6234 '` �o y Fax: (407) 575-6239 r�o�vnvr� � TO: Thomas G. Bradford, Village Manager FROM: Thomas C. Hall, Water System Manager DATE August 25, 1994 SUBJECT: Consideration of Change Order to Johnson Davis, Inc. In the Amount of $11,350.00 As you know, we are under construction with the raw water main which will connect our wells on the Western Peninsula to our supply line at Sandy Pines. While reviewing construction plans and verifying actual field locations of existing utilities (both ours and others), we realize an excellent opportunity exists to further enhance flows, pressures and service to our Northwest Service area. Since our present construction will be taking place within the right-of-way west of County Line Road near the tracking station, and not on the east side as originally intended, we will be excavating an area parallel to that in which we intend to install 700 ft. of distribution main in FY-95/96. Therefore, it would be prudent at this time to Change Order this work and save on unit cost of the pipe, utilize our existing permits and only have to be concerned with right-of-way restoration one time. Based on the foregoing, both our consulting engineers and staff recommend issuing a Change (7rder to the Contractor, Johnson Davis, Inc. of Lantana Florida in the amount of $11,350.00. Funding will be provided from the Water Department Capital Improvement, Retained Earnings, Well 25 and Pipeline Project, which has an unencumbered account balance for items such as this, in the amount of $80,853.00. Please place this item on the agenda of August 30, 1994 for Council approval. Once approved by Council, the Change Order will be executed by the Village Manager and a purchase order issued. The Contractor then may construct this line simultaneously with the current pipeline work and both our customers and ourselves receive maximum benefit. TCH/mk Attachs. . . �t.MA Reese. Macon and Associates, inc. August 23, 1994 Village of Tequesta P.O. Box 3273 Tequesta, FL 33469 ATTN: Mr. Tom Hall �: County Line Road Water Main Extension Dear Tom: � EncIosed for your review and approval are four (4) copies of Change Order No. 4 (Johnson Davis, Inc.) for the abave referenced project. This main extension will close a loop in the Village's distribution system which has been planned to be constructed for some time now. We recommend that the Village construct this main at this time since the raw water main contractor, Johnson Davis, will be working in the same area. Doing this installation now, the V�lage will realize cost savings in restoration of the right-of-way and utilizing favorable unit prices for this work from Johnson Davis. If you have questions or wish to discuss this further, please call. Very truly you , � � Tho as C. Je n, P.E. tcj-229�94-106 9121 N. Military Trail • Suite 207 • Paim Beach Gardens, Florida 33410 Ph. (407) 625-6660 FAX (407) 625-6664 CHANGE ORDER NO. 3 � UNIT PRICE SCI-�DULE TTEM ESTIMATED UNTT ESTIlVIATED NO. DESCRIP'TION QUA►NTITY UNTT PRI�CE AMOUNT II Water Main Fxt. 1. Water Main a. 8" PVC 750 LF 11.OQ $8,250.00 2. Valves & Box a. 8" RSGV 1 EA 500.00 500.00 3. D.I. Fittings 2S0 LBS. 2.00 500.00 4. Main Connections 2 EA 400.00 800.00 5. Sod 100 SY 3.00 300.00 6. Air Release Valve 1 EA 1,000.00 1,000.00 TOTAL, Change Order No. 3 $11,350.00 tc�-228�90-162.4 � - , N '(� R��nl WA rn a, �.1 � CNANGE ORD�2 Wat�K Av�nct a.ue / _ lE Ai�K_ , / � --- -. � , � A j�� + � 1 �.�' )�1. � "� '{ ( 'RACKI N G � -� � � � � STA oN I � \ � \ • • . �� WRE • � ! � ��y • Mily )- Y � q ��VEl�t , _ � +,�uE � \ • . � i �� � � \ � ✓ / ti�ttw� tE�neACE � ---- — -- 1JiTONMI00D �T� � � � � / � • � � �'� CJlEZ1C ORlVE • � � • � �� I � � I � I �I ; I � I � '�- � y -- �� � � ' �,� • i � � Q � � i � � ��� � � 'y i ,� � 9 � • � � � i � �' 1 y ��' � � � -� --�, �'�, � _ , , .� _ ��.�__------ - - - - - -