Loading...
HomeMy WebLinkAboutDocumentation_Regular_Tab 10_01/09/2014 VILLAGE CLERK'S OFFICE AGENDA ITEM TRANSMITTAL FORM Meeting Date: Meeting Type: Regular Ordinance #: N/A 1 /9/14 Consent Agenda: No Resolution #: N/A Originating Department: Manager ' � ` • • • • - : - • � -�• Award of Contract to Arcadis for Utility Financial Evaluation — Water System and General Uti�ity / Civil Projects Work Authorization in the Amount of $35,000 to Evaluate and Determine the Ability of the Utility Rate System Rate Structure to Support Pending R&R Projects, including by not limited to, Replacement of Asbestos Cement Pipe within the Distribution Syst�r� � . . -. Account #: � Amount of this item: Current Budgeted Amount Available: Amount Remaining after item: N/A Budget Transfer Required: No Appropriate Fund Balance: No '' • � •' • • • • ....� . . Department Head Submitted by Manager Finance Director Reviewed for Financial Sufficiency ❑ No Financial Impact ❑ Attorney: (for legal sufficiency) Village Manager: Submit for Council Di�cussion: ❑ � Approve Item: 0� �, � 1 ' Deny Item: � • • - . . - .. -- - . -. .- - . .- - .- . ..- . . -. _ ... . - - - . - Form Amended: 7/12/12 , � �� ARCADI S ARCADIS U.S., Inc. ir%�ru�:±r�i��tu�c �Water Environment 6uildings 2081vistaParkway West Palm Beach Florida 33411 Tel 561 697 7000 Fax 561 697 7751 Village of Tequesta www.arcadis-us.com 345 Tequesta Drive Tequesta, FL 33469 Attn: Michael Couzzo, Village Manager Re: Utility Financial Evaluation WATER RESOURCES Dear Mr. Couzzo: Enclosed, as discussed, are three copies of the work authorization to cover Date: the referenced project. As you are aware, the intent of this effort is to evaluate and August 29, 2013 determine the ability of the utility system rate structure to support pending R&R projects, including but not limited to, replacement of asbestos cement pipe within the Contact: distribution system. Essentially, the intent will be to integrate the previously �Nilliam D. Reese, PE completed Equipment Condition Assessment with the financial ability to support the Phone: recommended improvements (and if necessary, alter and re-prioritize the initially 561.697.7069 developed scheme). Email: If acceptable, please execute and return two copies. Due to potential timing william.reese@arcadis- considerations related to AC Pipe matters and to the Jupiter Inlet Colony project we us.com have notified PRMG, Inc. of the need to reach an initial discussion point with Our ref: urgency. They are prepared to expedite their initial work accordingly. Should you have questions or require anything further at this point, please Florida License Numbers call. Engineering E600007917 Very truly yours Geology GB564 ARCADIS U.S., Inc. � Surveying , ,' , LB7062 William D. Reese, PE Vice President encls. Imagine the result g:\aprojects\wr\rf projects\correspondence (e)1wp60\proposal\tequesta\couuo_u.f.e._08292013.doc VII..LAGE OF TEQUESTA WATER SYSTEM AND GENERAL UTILITY/CIVIL PROJECTS WORK AUTHORIZATION Utility Financial Evaluation This Work Authorization authorizes ARCADIS G&M, Inc. to perform the work set forth herein and is issued pursuant to the "Professional Engineering Consulting Services Agreement for Water System and General Utility/Civil Projects", dated November 17, 2005. All terms and conditions of said agreement shall be applicable to this Work Authorizarion. SCOPE The work performed under this authorization will be primarily performed by the rate consultant used for prior similar projects for the Village. The scope of work is as set forth in the sub- consultant's (PRMG, Inc.) documentation, attached as Appendix A to this authorization. The Engineer will supply the required engi.neering documentation (cost estimates, project prioriti�tion, etc.) to support PRMG's work effort. COMPENSATION For the scope of services as set forth herein the Engineer shall be paid a lump sum amount of thirty five thousand five hundred dollars ($35,500). TIME OF PERFORMANCE The Engineer will complete Scope within 120 days of the receipt of an executed authorization, exclusive of delays beyond the control of the Engineer. This authorization can be ca.ncelled with or without cause by the Village with 30 days written notice. Should said cancellation occur, the Engineer will be paid for a11 services performed through the cancellation date. Page 1 of 2 ACCEPTED BY: Village of Tequesta (Utility Financial Evnluation) Michael R. Couzzo, Village Manager Date: ARCADIS G&M, Inc. (Utility Financial Evaluation) William . eese, P.E., Vice President Date: B 24 /3 Page 2 of 2 ATTACHI��NT A PUBLIC RECOUSRCES MANAGEMENT GROUP, INC. SCOPE OF SERVICES - UTILITY FINANCIAL EVALUATION The scope of services to be performed by PRMG, as a subconsultant to ARCADIS, will include the following tasks: Task 1— Data. Acquisition and Review• Based on information complied by the Village, PRMG will request and evaluate specific information as it relates to the System necessary to complete the financial forecast. Information to be requested from the Village will include, but not be limited to: i. Customer statistical information as it relates to the service area needs by franchise or specific service area component; ii. Bill frequency information required to develop a detailed revenue model for rate estimation purposes; iii. Information regarding the operating expenses of the Water System; iv. Information regarding the funds availability by type of fund; v. Information regarding potential changes in service area needs due to the expiration of franchise agreement as well as extension of service to other areas; vi. Capital improvement program as estunated by both the Village and ARCADIS, including the recognition of the capital needs identified in the Assessment Report; and vii. Other relevant information (e.g., consumer price index for price index rate adjustments, etc.) as deemed necessary by PRMG to prepare the financial evaluation of the System. PRMG will prepare a date request for response by both the Village and ARCADIS to initiate the data compilation efforts and will also attend a kick-off/data review meeting with both parties to evaluate trends of the Water System as well as review the compiled data. necessary for project completion. Task 2— Customer Statistical and Revenue Forecast: Based on an up-to-five-year historical trend of customer forecast statistics by primary service area andlor franchise, PRMG will prepare a five- year customer forecast of the Water System. The Test Year for the forecast will be the Fiscal Year 2014 and the forecast period will consist of the Fiscal Years ending September 30, 2014 through 2018 (the "Forecast Period"). PRMG will work with the Village and ARCADIS to identify potential growth the existing service area, changes in the service area due to incremental utility extensions required of the Water System, as well as reduction in service area due to the expiration of franchise and other service agreements that may occur during the Forecast Period. PRMG will conduct a corresponding evaluation of the utility rate revenues from existing rates based on the customer forecast delineated above, recognizing increases rates due to the application of the annual price index rate adjustment as currently allowed by utility ordinance. The customer and -1- corresponding revenue forecast will serve as the basis for the review of net margins and availability in the overall evaluation of the Water System. Task 3— Develonment of Revenue Projections from Existin Rates• This task involves the development of projections of utility rate revenues for the Forecast Period from existing rates recognizing: i.) the results of the customer and sales forecast performed in Task 2; and u.) the Village's existing rates for service. Additionally, this task will involve a rate-revenue "reasonableness" test (reconcile model results to reported amounts on Village financial statements) to ensure that the revenue model and billing determinants are reasonable relative to the modeling process. This task will also involve the projection of other operating revenues, interest income earned on unrestricted fund balances as defined in the bond resolution for the utility system and revenues derived from other utility transactions (e.g., customer service charges). Task 4— Development of erati.ng Expense Projections• This task involves the development of the estimated amount of operating expenses required to be funded from water rates for the Forecast Period. PRMG will work with both the Village and ARCADIS to identify changes in utility operations that may result due to changes in service demographics as well as any revisions to the facilities which are currently in place due to anticipated capital unprovement program for the Village. PRMG projections will be based on recent historical trends and changes in cost of providing service, estimates provided by the Village and ARCADIS as it relates to ongoing operations, and the recognition of inflationary allowances for the general cost of operations. The operating expense analysis will be performed to identify the net revenue margins to the utility that are critical in meeti.ng the debt compliance requirements of the Water System as well as identifica.tion of fund availability for repayment of debt and capital funding. Finally, other operating expenses such as inter-fund transfers, administrative allocations, contingency reserves, insurance needs, and other expenses will be evaluated to ensure that the full recovery of costs are reflected in the rate sufficiency analysis. Task 5— Canital Imnrovement and Fundin�alysis• This task involves a detailed review of the Village's five-year or applicable capital improvement program and other engineering planning documents such as the Assessment Report, and the performance of a funding analysis to identify available sources of funds for financing of the capital improvement program and the estimated impact on utility rate revenues associated with the capital funding program for the Forecast Period. This task will include the development of the estimated fiand balance by individual fundlaccount and the development of a flow of fiinds analysis for liquidity evaluation purposes. Task 6— Other Revenue Requirement Identification a.nd Mana�ement Dashboard• In order to meet the financial obligations of the Villa.ge's utility systems, PRMG will review the financial aspects of the Village's utility systems in order to potentially recognize other revenue requirements that may need to be allocated or included in the rate analysis and program updates to the financial forecast model. This task will include assistance in the development of fiscal policies in terms of working capital maintenance, the funding of capital re-investment for long-term planning needs, the funding of other departmental capital or maintenance reserves for items such as vehicles and equipment, and the recognition of any other transfer requirements that may be associated with the utility system. As part of this task, PRMG will develop a"management dashboazd" to allow for the review of the financial position of the utility and the ability to perform sensitivity analyses in order to finalize the finaneial forecast. -2- Task 7— Compliance Analysis: This task will be conducted in order to satisfy the rate covenant requirements and the flow of fund requirements as defined in the goveming bond resolution that authorized the issuance of the outstanding utility system revenue bonds. The compliance analyses will be performed for the Forecast Period to mai.ntain the financial integrity of the utility system. Task 8— Rate Comparison with Nei boring Utilities: As part of the evaluation of the sufficiency of rates, PRMG will prepare a rate comparison of the Village's existing water rates with other neighboring utilities and illustrate the potential customer impact on any recommended rate adjustment associated with the development of the financial forecast and rate evalua.tion. Task 9— Develo of Net Revenue Requirements and Rate Impact Anal and Staff Presentation: Based on the aforemenrioned tasks, PRMG will prepare a summary of the total net revenue requirements of the Water System and the accompanying rate requirements for each fiscal year of the Forecast Period. A meeting by not more than two representatives of PRMG will be held with both the Village staff and ARCADIS in order to present the results of the initial study findings and results. Based on the results of the staff ineeting, PRMG will make modifications to the analysis prior to the presenta.tion of the evaluation to the Village Council. Task 10 — Report Preparation and Presentation: PRMG will prepare a technical memorandum or report in support of the evaluation of the sufficiency of rates to meet the expenditure requirements of the Water System, which encompasses the financial plan and capita.l improvement plan funding analysis. The report prepared by PRMG will include delinea.tion of the assumptions and analysis used to prepaze the financial forecast, the available or identified fiinding sources that meet the overall capital improvement program needs of the Water System, and any other aspects of the Water System (i.e., action plan items based on noted ixends and the attainment of certa.in financial targets for the System). This task will include a presentation of financial ratios and ta.rgets to illustrate the overall financial position of the Water System in relation to the funding needs, especially as it pertains to the capital improvement program requirements. Task 11 — Meetin�s: During the course of the project, it is anticipated that PRMG will attend a total of three (3) on-site meetings with the Village and ARCADIS and attend two WebEx meetings to present ongoing results with Village staff and/or ARCADIS. Attendance of the on-site meetings will be by not more than two (2) employees of PRMG. The on-site meetings in this scope of services include the following: Description Meetings Kick-Off/Data Review 1 Development and Review of Fina.ncial Forecast 1 Presentation of Fina1 Report to Council 1 Total Meetings 3 PROJECT SCHEDULE Upon notification to proceed as provided by the Village, PRMG would complete the Project within one hundred and twenty (120) days after being given notification to proceed as defined below for presentation to the Village Council at a public workshop, the date of which has yet to be determined. The completion of the analysis would be subject to the availability of information -3- provided to PRMG from both ARCADIS and the Village that would be necessary to conduct our financial analysis. ADDITIONAL SERVICES During the course of this engagement, the Village may request that PRMG perform additional services as a subconsultant to ARCADIS on behalf of the Water System. Although no additional services are anticipated by PRMG at this time, any additional services as requested by the Village will be performed by PRMG upon written authorization by the Village and as mutually agreed between the three parties. Examples of additional services that could be performed by PRMG may include, but not be limited to, the following activities: 1. Attendance of ineetings to what is contemplated in the scope of services. 2. Performance of a detailed utility rate study to design proposed rates to meet the financial requirements of the Water System. 3. Development of a project feasibility report associated with any financing activities (debt service issuance) necessary to fund the identified capital improvement program. 4. Negotiations with third parties associated with franchise ageements, provisions for services, or other related activities. 5. Performance of substantial cha.nges in the financial forecast due to the receipt of inaccurate information as provided by the Village or due to delays in the Project that were not caused by PRMG. 6. Performance of any anticipated update to the overall financial forecast after substantial completion of such forecast at the request of the Village, including the preparation of additional financial forecast scenarios. (Remainder of page intentionally left blank) -4- Public Resources Management Group, Inc. Utility, Rate, Financial and Management Consultants August 17, 2012 Mr. William D. Reese, P.E. President ARCADIS/Reese, Macon and Associates, Inc. 2081 Vista Parkway, Suite 100 West Palm Beach, FL 33411-2702 Subject: Village of Tequesta Request for Services Dear Bill: As you know and based on my conversations with Mr. Couzzo at the Village of Tequesta (the "Village"), he would like PRMG to prepare a high-level analysis of the indirect cost allocation currently being budgeted for payment by the water utilities system (the "System") to the Village's General Fund. Furthermore, he would like us to be a sub-consultant to ARCADIS for this limited engagement. Recognizing the request of Mr. Couzzo, we are proposing the following to ARCADIS for consideration: PROJECT TEAM AND BILLING RATES With respect to the performance of this analysis, Mr. Robert J. Ori will be the principal-in-charge for the project and will serve as primary contact between ARCADIS, the Village, and PRMG. PRMG may utilize other employees or associates during the course of the Project as needed. The services covered by this Agreement shall be provided based on the direct labor ra.tes set out in Attachment A. SCOPE OF SERVICES T'he scope of services to be performed by PRMG is summa.rized as follows: 1. Compile financial, statistical, and operational information to identify the costs to be allocated and to assist in the development of the allocation basis or factors. PRMG will prepare requests for information and conduct discussions with Village staff to compile information required for analysis. 2. Prepare a cost allocation analysis to identify the costs that reasonably support the operations of the System which are accounted for in non-utility funds such as the General Fund. Compare the results of the analysis with current transfer levels for genera.l reasonableness. K�DLY1056�Upd UN Fin Foremst 20l IP�Bg\CoaespVnd'veclCos�PcoposelroARCADIS 341 NORTH MAITLAND AVENUE — SUITE 300 — MAITLAND, FL 32751 Tel: 407-628-2600 • Fax: 407-628-2610 • Email: PRMG@PRMGinc.com • Website: www.PRMGinc.com Mr. William D. Reese, P.E. ARCADIS/Reese, Macon and Associates, Inc. August 17, 2012 Page 2 3. After review with Village management, finalize the cost allocation analysis and provide working paper / analysis to the Village for future use. 4. PRMG will budget the attendance of two meetings with management and staff to evaluation the cost centers / activities that support the operations of the System and to develop the analysis. 5. Prepare transmittal letter to provide Village the analysis; it is assumed that that tables atta.ched to letter will provide general cost allocation basis for determination of the indirect cost allocation. COMPENSATION AND BILLING Based on the scope of services as summarized above and the direct hourly labor billing rates as shown on Attachment A herein, we propose a not-to-exceed budget allowance of $5,000 for the Project. We do not anticipate that the analysis performed by PRMG will approach this estimate but it will provide an allowance for additional analytical analyses that may be required based on requests made by the Village, condition of the data received, and other factors. The billings for the services provided by PRMG will be on a monthly basis and will include the direct cost of personnel anticipated to be assigned to the Project as well as any other direct costs such as tra.vel, telephone, copying, printing, and shipping charges. The costs incurred by PRMG for such other direct costs, if any, will be billed based on the actual cost or the standard unit cost rates as summarized on Attachment A. The services provided by PRMG will be billed on an hourly basis predicated on the actual work effort performed by PRMG and not on a lump-sum basis. To the extent that the analysis is completed at a cost less than the proposed contract budget allowance as identified above, PRMG will not invoice the Village for any amounts remaining (unbilled) within the contract budget except for the provision of any additional services which the Village may request from PRMG, as mutually agreed between the parties. SCHEDULE It is anticipated that the preparation of the indirect cost analysis and transmittal of the findings and work product will be submitted to the Village within fifteen (15) business da.ys after being given authorization to proceed by both ARCADIS and the Village. The completion of the analyses contemplated herein will be subject to the availability of information provided to PRMG by the Village that is considered as being necessary to conduct the financial services being requested by the Village. K�DC11056�Upd Util Fm Foreeast ZOl1P�dglCortespUndirectCoetPropoaeltoARCADiS Mr. William D. Reese, P.E. ARCADIS/Reese, Macon and Associates, Inc. August 17, 2012 Page 3 If this proposal is acceptable to both ARCADIS and the Village, please provide us with a notice to proceed recognizing the provisions of this proposal and any other contractual agreements needed between our two firms. The receipt of the notice to proceed will be considered as acceptance of this proposal by both ARCADIS and the Village. We appreciate the opportunity provided by ARCADIS to assist the Village in its review of the cost allocation process and look forward to working with both the Village and you in the near future. Very truly yours, Public Resources Management Group, Inc. �.� � � • � � Robert J. Ori President RJO/dlc Attachment K�DCi10561Upd Util Fin Foreeast 2011P�d'g\Co�avpUnd'veclCoatPmposeltoARCADIS DRAFT PUBLIC RESOURCES MANAGEMENT GROUP, INC. SCHEDULE OF DIItECT LABOR HOURLY RATES AND STANDARD COST RATES DIRECT LABOR HOURLY RATES Direct Labor Project Team Title Hourly Rates [*] Principal $170.00 Associate $125.00 Managing Consultant $115.00 Supervising Consultant $110.00 Senior Consultant $105.00 Rate Consultant $ 95.00 Consultant $ 85.00 Senior Rate Analyst $ 75.00 Rate Analyst $ 65.00 Analyst $ 55.00 Assistant Analyst $ 45.00 Administrative $ 48.00 [*] D'vect labor houdy rates effective twelve months atter the date of execubion of the Agreement; rates will be adjusted by not more tk� the net percentage chenge (but not less than 0%) in the Consumer Price Index — Urban Consumers per azmum (roimded to the nearest dollar) or as mutually agreed between parties for invoices rendered ai�er each anniversary date of each year thereafter imtil project completion or terminaiion of the Agreement between the parties. STANDARD COST RATES Expense Description Standard Rates [*] Mileage Allowance — Personal Caz Use Only $0.485 per mile Reproduction (black and white) (in house) $0.05 per page Reproduction (color) (in house) $0.25 per page Reproduction (contracted) Actual Cost Computer Time $0.00 per hour Telephone Charges Actua.l Cost Delivery Charges Actual Cost Lodging/Other Travel Costs Actual Cost Meals Not W exceed per PRMG Employee: $8.00 — Breal�ast $12.00 — Lunch $25.00 — Dinner Subconsultant Services Actual Cost plus 5.0% Other Costs for Services Rendered Actual Cost [*] Standard cost rates effective twelve months aftcr the date of execution of the Agreeme� where applicable, rates will be adjusted by not more than the net perce�age change (but not less than 0%) in the Consumer Price Index — Urben Cons�ers per annum (rounded to the nearest dollar) or as mutually agreed between pazties for invoices rendered after each anniversary date of each year thereafter imU7 project completion or termination of the Ageement between the �rties. A�ry Standard Rate edopted by policy by Clieot will supersede rates shown above. K�nCilos6�vpd ufil Fm Fo�st 20t 1P�8g�CorraspUndirectCustAoposelmARCAn7S