WATER SYSTEM AND GENERAL UTILITY/CIVIIl PROJECTS
WORK AUTHORiZATIO�V'
Tequesta Drive Water Maira Replacement
This Work Authorization atxthorizes ARCADIS G&M, Inc. to perfvrm the work set forth herein
and is issued pursuanYto the "Professional Engineering Consulting Services Agreem,ent for Water
Sys�tem and General Utili�y/Civil Proj ects", dated November 17, 2005. All terms and conditians
of said a8reement shall be applicable to this Work Authonization.
BACKGROUND
The Engineer understands that this W ark Authorization shall cover the design, permitting and
bidding assistance for the replac.ement of the existing 12-inch cement asbestos pipe within the
Tequesta Drive right of way. The limits of work for the watermain replacennent are as foIlows;
• Cypress Drive to Riverside Drive
• Poini Drive to west side of Country Club Drive
The Engineer also understands that the proposed water main replacement will have an impact on
Tequesta Drive, thereby requiring it to be reconstructed or overlaid (road enhancements) as
required This roadway bas developed some deficiencies, so the water main replacement timing
with the road enhancements complement each other and benefit the Village. The limit of the road
enhancements is as follows;
• G�press Drive to Seabrook Road
• Short Avenue to Riverside Drive
• Point Drive to Country Club Drive
SCOPE
The Engineer will perform the following tasks.
1• Prepare desiga plans and specifications for the �lete replacement of the
existing l2-inch ma.in with a new i2-inch main within the limits stipulated
above.
2. Prepare design plans and specifications for the road enhancement as determi.ned
by the Engineer within the roadway limits of work stipulated above.
3. Prepare an Engineer's estimate of construction.
4. Prepare permit support documents for the Palm Beach County Health
Departznent / FDEP and process accordingly. {Note that any applicable permit
fee shall be paid separately by the Village}.
5. Meet with Village periodically during the design pmcess to gather input on the
proposed water main alignment and road enhancement details.
Page 1 of 3
6. r� s�t �aa� a��r�.
7. Pm�a� a�s� t� rhe v�age �ng t�e hi� p�o� to iacinde � at
1� P�bid �ence, r�ponse to biddErs � for additioaal infa�ation,
�a� of a,ddendums, s�ndaaoe at a bid apen�n� review of bidders
costsJqnalifir,arians a�d maldng a ' of.Awaid.
COMPENS.ATION
Far Scope Items 1 thru. 7, the Engineer shall be pa.id a lump sum fee of seventy six�housand five
huadred dollazs ($76,SOQ).
T.�ViE OF PERFORMANCE
'The E�e� �1 c�mPl�e Scope I�ems 1 thra 6 within IZO days af z+ecxapt af an ex�.
�a� �ve of delays be�nd the conficol of the �: Far Scape Item No. 7, the
v�a� w�1 lre complet�d caa�m�e with the Village's biddi�8 8��s,
T1� anthari�tion c�. be c�.r,�i�. w�xh or w� «�se by the V�lage �vith 30 days wr�t�
no�ic�e. Should said. �on occ�r, the Bagiaeer w�1 be p�id fia�e a91 �rvices �ed
through the caacellation date.
Page 2 af 3
ACCEPTED BY:
Village of T�
�1`e4u�sta Ihive �aterhlain �lar:ement)
Michael R. Couzzo, V7�age Manager
Date•
ARCADIS G&M, Inc.
(Tequesta Drive �ater Alain Reptacement)
`���
illiam D. Reese, P.E., Vice President
l�e:_ - l l� /3-
Page 3 of 3
America's 10 most dangerous infrastructure problems- MSN Money Page 1 of 4
bnor� Ocax:: �,.,, .,....,_ 3��,my �ee�a�ds rJ�.ak= piiS!� you- homepage
sign m
�if MON� ` _
Follow
HOME NEWS VIDEO IN /�„ :, w . ,,,.. .�.-..�,.. .�„_ c��`�, _ _ ,c=.< ..,-.-.. .,i:ES
portfolio manager markets stocks mutual funds etfs broker center top stocks
America's 10 most dangerous -I-� ���.�:�� �.
RECENTQUOTES � ''�'-
infrastructure problems — ----- -- - - -----
Our aging infrastructure earned a D+ overall in the American Society of Civil SYMBOL LAST CHANGE % CHANGE
Engineers' annual repor card. Here are the main cwprits DLX 48.54 -'].-E -`�..60 °/
By Rob Garoer. The Fiscal Times $INDU 15.843.08 -„�.03 -023 %
AAPL 549.69 .. ,.._ �0.66 %.
.,_.._. _ . _ _. . . .. v �. . = APPL NA NA NA
' .,w DIS 72.15 -C.57 -078 %
� ' '�, .. ., -
� � ��� �� � C q8.92 �.?� -0.83 %
..,�_ .�"+,��.
� �� Update quotes � Clear this list
�� t
^� �� � Quotes tlelayetl at least 95 min (t32 PM ETj
i' � �� ��nsorea by
MARKET UPDATE
US "_-.. . .. . . . . . . . .... ..
e�r� �:_ : , . : ;' ��&
Drinking water NAME LAST CHANGE % CHANGE
At the dawn of the 21st cenYUry. much of our drinking water infrastructure is neanng the end of its usefw Iife- DOW 15.843.08 -..__� -�._._
There are an estimated 240,000 water main breaks per year in the United States. Assuming every pipe would
need to be replaced, the cost over the coming decades could reach more than $1 trillion, according [o ?he r
American Water Works Association (AWWA). The qua6ty of dnnkino water in the United Statas remains
universally high, novoever
• Video. West Virqinia chemical spill shows risks to waterwavs
More frort? � he Fiscal Times
• American infrastructure aets a new wakeuo call
• You can no lonqer take your companv to court
• 8 thinqs that will cost vou more in 2014
NASDAQ 4.Oi9.05 -:-5_?2 '�.?9
� � � S8P 1.78�.34 -8.95 -0.50
MORE FROM MSN MONEY FROM AROUND THE WEB
� � � � � Sm Caos t544.i3 4827 -2.41
��Donald's reseives stardoff wiin !ingering elderly ' C Insanely Overp2id Pubiic �mployees (The Fisc21 ? C Yr i OQ21 -._ .". .. ,.
Time=_7
N^te
10 things not to buy in 2014 —
15 Best Burgzrs from Diners. Drive-Ins 2nd D�ves
How to win BufretYS S': biilion oracket challenge (FOOd Networkl � ��� � �- - ��-
Ford's new F-150 could hav2 a huge payoff 4 Stupid Investment Mistakes Nearly Everyone Mzkes tBRIEFWG.COM] At their lows ior the session, which
(etrede.comj were reached a little over an hour ago, the Dow,
Nasdaq, and S&P 500 were down 96, i5.. and 17 points,
5 dying and 5 thriving fndus?res ,yow Caffeine AfFects Your Heart (Health Central) respectively. Since then, howev2r. they have been
Legal pot could be the next great US industry engaged in 2 rebound effort thzt has helped pare those
Foreign Curroncy and Investment Advisor Career losses b a notable mar in
Guide !Florida Tech University) y g�
? 0 Gr�z± Sm2•.I Cities for Retirement (AARP) There hasn't been a specific piece of news to account
for the turnaround effort, so it w2s mest likely spurr�d by
a belief that the broader market :s due fcr z oeur.c2 a`ter
'""''��`"''-'��-� . dropping nearly 4A% in _ PAore
VIDEO ON MSN MONEY
- � � � � � � -•---� . � - More Market News
MARKETNEVJS �� '����^� =-_-�-������-� StockTiCker StoryStOC�cs
. .__- -.__._ _----_- --.__.__— ...__..._._---- ---------- InPlay ShortSiories
Currencies
NAME LAST CHANGE % CHANGE
Euro/Dollar 1_36775 -�_�_.,_� -_..,-
http://money.msn.com/investing/americas-l0-most-dangerous-infrastructure-problems 1/27/2014
S �
Village of Tequesta FL
TEQUESTA DRIVE Wi4TER A�AAIN REPLACEMENT
ENRt� E$TIdIATE 8F PROBA6IE t�DRFSTRUG110i�E COST
(1N1 FULL RDAD REP'LACENIENTa
PROJECT TiTLE DATE
WATER [�AAlNS REPLdCEIIAENTB 1I23P�14
PRQJECT LO{:ATIOAf DESIGR� PHASE
Village of Tequesta, FL C�NCEPTUAt. QESIGN
�� DESCRtPTiON 61uANTRY UI111�' UMT PRICE E �� worfs
NO.
1 PIPE
P F�„�n � i�
12° PVG 5 5Qfl LF $ 52A0 $ 286�OOO.oU
Fire tl �M. Fumish 8 Instal!
Fre rarrt 10 EA $ 2.750.00 $ 27,�O.d41
P Eumish 8, Instatl
DI Flttln 4 Qfl0 LS5 $ 4.50 $ 18�0OO.OD
PI Ssrvlc�, Runlsh 8� Install
Vliatar S�rvtces dential 35 EA $ 2.500.00 S 87�5BU.00
WaterSeroir.es Commetclal 90 EA $ 3.54D.00 $ 35�OOD.00
Flre 3eroic�s 10 FA $ 3 Q00.00 $ �,OOO.W
Sample Polnt�, Fumish & I�II
te Pofrds 24 EA $ 5Q0.00 $ 12 OUO.�
tiata Val�s Fumish 8lrrstall
92° Valves 8 EA $ 3�200_Od $ 25,600_00
s• v�� zo ea � z,000.oa s ao,oao.oa
Meln Tle-Ins, Fumish 8 Inaiall
N�in Tfe-ins 23 EA $ 2,000.00 $ 48.48D.00
Alr Rsle� Valv�, Fumish & Ir�stall
Ai� Rel�e VaPve� 4 EA $ 3,OQ0.00 $ 12,Q00.00
Grouk Fumish & I�0
�rart Existin Main B.00Q LF $ 2.50 S 12,500.00
2 R�toraHan
Drivewa 7,b00 SY $ 35.00 $ 52.500.Q0
Sidewralk f,F�O SY $ 15.00 $ 22,540.pp
� �0 SY $ 5.50 4d.000.Q0
S R�d RestaratYOn
�o� 17,500 SY $ 5A0 $ 87.500.Q0
Base Rewnrk 20,000 SY $ 15.OD $ �O,OOO.QO
t 2-Lffts 29.�0 SY $ 28.00 $ �48,OII0.00
Shi in I e 1 LS 20,000.00 $ Q00.00
4 @ZAilMI'ENANCE OF TRAFFlC
Farfumishing Uaific corttrol far the project mcluding flagmen, slgns, � LS $ 75 000.00 $ 75,(100.00
barrir�d�, mairrtenance of trafttc pFan ar�d similar items and wark
fw direcUng Vaffic and rr�trdatning safety
- - - - - SUS TOTALA _ 7 TT9, .b0
5 DEDICAIED ALLOWi4NCE5
Conti 1 LS $ 18Q400.�D $ 180.444.d0
- Si1B TOTAI. B �, _ 780
GRAND TOTAL $ _ 7 �.�
s . •
Yiltage of Tequesta, FL
TEQUESTA DRME WAT�R MAIN REPLACEpAENT
at�8 E$�Ii1I►TE OF R�BABLE i�S7RltG'ftON C.K�ST
(RUFU6L PAYEi�I'F' dVERLAY 1PIiRf1AL R�WLp}
ROJECT'fITLE DATE
ATER NAINS REPiAC�N�NTS ��14
PRQJECT LOCSTION QESEGN PHASE
VIUa�ge af Tequ�hd, FL GflNCEPTUAL DE�tiN
� DESCRIPTION QUANTITY UNR UNIT PRICE E ��� No�s
A6sOUWT
1 PfPE
P . Fumish 8lnstaU
72° PVC Ri b,600 LF $ 52.00 $ 286 OOQ.00
Flre ra Fumish & L►tistail
Fire rard 10 EA $ 2�750.ftfl $ 27�500,00
P Fittln , Famish & Instail
DI Fittln 4.000 LBS $ 4.50 $ 18�OOO.QO
Pi �rvir� Furnish & Install
Water Servtces Reside�ttiai 35 EA $ 2,500.00 $ 87,504.60
Water ServiCes Go�ttrtl8rc.lei 10 EA $ 3.500.00 $ 36�000.00
Fir� Senrlces 10 EA $ 3.QQO.W $ 3�.000.00
�F�� P��, Fumish & Install
Semple Palrrts 24 EA $ �Q.00 $ 12.t100.00
tiate Val�, FurnPsh & l�ta11
12" 1/ahres 8 EA $ 3,200.00 $ 25�6tI0.00
8° Valves 20 EA $ 2,OQ0.00 $ '40.0OO.Od
�llein Tle-Ins, Fumlah 8� Insfall
Main Tle-ins 23 EA S 2,�0.40 $ 46,000.�
Alr Release Vaives, Furnlsh 8� Insfell
Air Release Valves 4 EA $ 3,0OO.OQ $ 12.00O.QD
Grout, Furn�h 8lnefsll
Groui ExisUn Nlain b,000 LF $ 250 $ 1 5D0.00
2 Re�toraHon
� 1.5p{} SY $ 35.OQ $ �a2.5QQ.�
Sidewalk 1500 SY $ 15.00 $ 22,500.00
SOD 5,000 SY $ 5.50 $ 44 OOQ.aO
3' Road Reatoration
n�o 2-� 3s,oao sY � 2.0o s �o,000.oa
s� �o� ��� � 5,aoo sY $ ��.00 $ 7�,000.oa
na�t a� 2-�.�s 2�,aoa sY s xs.ao $ �,aoo.oa
Stri i na e 1 LS $ 20,Op0 QO $ 20 OQQ.OQ
4 IIAIUNTENANCE OF iRAF�IC
Farfumishing haffic coritrql for the pro�ect irtcludtng flagmen. signs, 1 � g 54,000.00 $ 50,000.00
barricades, mair►ternance of traflic plsn and slmilar ibams ar�d w�ork
for direc#ing lraffic and maintainirtg �fety
SUB TQTAL A $ 1,51$700.d0
5 DEDICATED ALLOVNANCE3
�� 1 LS $ 16'{,8�.00 $ 951,96fl.00
9UB TOTAL B 1$1,90p.00
GRAND TOTAL S 1 Q00.40