VILLAGE OF TEQUESTA
WATER SYSTEM AND GENERAL UTELITY /CIVIL PROJECTS
WORK AUTHORIZATION
Miscellamaus Drainage Systm Improvements
This Work Authorization authorizes ARCADIS G&K Inc. to perform the work set forth
herein and is issued pursuant to the "Professional Engineering Consulting Services
Agreement for Water System and General Utility /Civil Projects" dated November 17,
2005. All terms and conditions of said agreement shall be applicable to this Work
Authorization
SCOPE
The Engineer understands that this work authorization shall cover the design and
assistance in obtaining contractor pricing for the Miscellaneous Drainage System
Improvements for the replacement of aged corrugated metal per. The Village has
identified four (4) areas within the Village where they have experienced pipe and
associated roadway failures. The design shall address each area that is generally located
as follows:
• Pine Hill Trail East and Baytree Lane
• Pine Hill Trail West and Hickory Hill Road
• Cedarhdl Lane and Chestnut Trail
• Seabrook Road and Dover Road
Note that it is anticipated that a permit is not required by the regulatory agencies for this
PmjecL
The following specific tasks will be performed by the Engineer.
1. Prepare design plans to incorporate the following:
• Replacement of 30 -inch and 18 -inch CMP drainage pipe in the areas noted above.
• Roadway repairs within the vicinity adjacent to the drainage improvements
• A maintenance of traffic plan
• Standard details of construction
2. Assist the Village in obtaining Contractor pricing for this Work from a minimum of
three (3) Contractors.
3. Make a recommendation of award.
COMPENSATION
For Scope Items 1 thru 3, the Engineer shall be paid a lump sum amount of Nine
Thousand Two hundred and Fifty Dollars and Zero Cents ($9,250.00).
For any services that will be sublet, the Engineer shall order their services after obtaining
the written authorization of the Client. The Subcontractor shall work directly for the
Engineer as delineated within the November 17, 2005 agreement.
Note that the compensation referenced above excludes any permit fees, survey, or legal
ads required for bidding.
TIME OF PERFORMANCE
The Engineer will complete Scope Item No. 1 within 45 days of receipt of an executed
authorization, exclusive of delays beyond the control of the Engineer.
For Scope Items 2 and 3, the Engineer will complete the work within 30 days upon
completion of Scope Item No. 1, exclusive of delays beyond control of the Engineer.
This authorization can be cancelled with or without dose by the Village with 30 days
written notice. Should said cancellation occur, the Engineer will be paid for all services
performed through the cancellation date.
ACCEPTED BY:
VILLAGE OF TEQUESTA
(Miscellaneous Drainage System Improvements)
Michael R. Co ill I •
DATE: lee I
ARCADIS G&M, INC.
(Miscellaneous Drainage System Improvements)
Thomas ensen, P.E., ce President
DATE: