HomeMy WebLinkAboutAgreement_General_11/26/2007KISINGER CAMPO H~ ASSOCIATES CORP.
November 21, 2007
Mr. Mike Couzzo, Jr.
Village of Tequesta
250 Tequesta Drive, Suite 300
Tequesta, Florida 33469
Re: Bridge Cost Comparison, Bridge No. 930227
Dear Mr. Couzzo:
Kisinger Campo & Associates Corp. (the Consultant) is pleased to submit this proposal for engineering
services to the Village of Tequesta (the Owner) for the above referenced project. The scope of services for this
contract will consist of a cost comparison of total bridge replacement versus repair for general deficiencies as
outlined in the KCA inspection report of February 14, 2007. The services will be performed in accordance
with the following description and include:
• A review of the inspection report
• A brief overview of the previous repair construction documentation on file
• A cost estimate for a similarly configured replacement structure
• A repair cost estimate
The proposed document is intended as a letter report providing general information to the Owner. A more
detailed analysis can be provided under separate contract if requested. Other additional services that could be
provided under separate contract include development of repair plans, specifications, assistance with the
bidding process, construction management, or additional subconsultant services such as geotechnical analysis,
surveying, environmental survey, permitting, or architectural consultation. Construction engineering and
inspection services (CEI) could also be included as optional services.
Thank you for this opportunity to propose our services. Please contact me if you have any comments or
questions regarding our proposal. If you concur with the services proposed, please sign the attached agreement
and return it to my attention. We look forward to continuing our professional services with the Village of
Tequesta.
Sincerely,
~~3. %
%~
David B. Thompson, P.E.
Project Manager
cc: TJS, MM, file
Corporab Office • P.O. Box 25261 • Tampa, FL 33822-5241 • Phoes: 813/871-5331 • Fax: 813/8715135
Yn;it our web site at www kisingercampo.com
Fee Summary
Classification Rate Hours Subtotal
Chief Engineer $160 6 $960
Total Lump Sum Fee $960
Schedule
The report shall be completed within 2 weeks from the Notice to Proceed.
Authorization
This agreement is otherwise reaffirmed in its entirety. The approval of this work authorization shall act as the
"Notice to Proceed".
Kisinger Campo .Ass c~iates Co
~ /~ ' G '
By:
o as E. S
Title: Vice President
Village of Tequesta
By:
Mike Couzzo, Jr.
Title: Villa ee~ger
Date: Z/~c/od Zoo?
Date: ~ ylm -" ~`~~
Corponrte Ofi9cs • P.O. Box 25261 • Tampa, FL 33822-5281 • Phone: 813/871-5331 • Fax: 813/871-5135
Visit our web site at www.kisingercampo.com