Loading...
HomeMy WebLinkAboutAgreement_General_02/06/2015 Q ARCADIS ARCADIS U.S., Inc. Infrastructure Water Environment Buildings 2081 Vista Parkway Suite 305 West Palm Beach Florida 33411 Village of Tequesta Tel 561 697 7000 345 Tequesta Drive Fax 561 697 7751 Tequesta, FL 33469 www.arcadis- us.com Attn: Michael Couzzo, Village Manager RE: WTP and Water System Renovations WATER RESOURCES Dear Mr. Couzzo: Date. Enclosed are four copies of Field Order No. 1 for the referenced project. This January 29, 2015 field order memorializes prior direction given to the contractor and was previously authorized. The work items are a result of encountered field conditions that were Contact: beyond his control. The field order does not increase the contract amount but instead William D. Reese, PE authorizes a partial use of the previously approved contingency. Phone: 561.697.7069 Please execute and return two copies. The other two are for your record. Email: Should you have questions or require anything further, please call. william.reese@arcadis- us.com Very Truly Yours, Our ref: ARCADIS U.S., Inc. W F900204.0000 William D. Rees Florida License Numbers Vice President Engineering 7917 encls. Geology GB564 Surveying LB7062 Imagine the result giaprojects \wr \wf projects \900204 -vot wtp misc rehab \docs \couzzo fo 1 Itr 01292015.doc Village of Tequesta UNDEFINED CONDITIONS FIELD ORDER No. 1 Project Title: WTP and Water System Renovations 7233 Southern Blvd., Ste. B1 Contractor: TLC Diversified Address: West Palm Beach, FL 33413 Contract Completion Dates Substantial 9/27/14 Final 11/1/14 Contract Date 1/6/14 FIELD ORDER NO. This field order is issued in accordance with Section 01150. 1.05 and compensates the General Contractor for additional work as a result of unforeseen field conditions and improvements of existing conditions as follows: 1. The addition of a water heater, including power & plumbing in the new shop. 2. Removal and replacement of 8" flange & spool (existing fig was cracked). 3. Demolish old chemical room floor. Original floor would not support coating. 4. Provide new vinyl baseboard in Maintenance Shop. Total net additional cost of $6483.00 to be used from $50,000 Owner's Construction Contingency. This Field Order includes any amounts for changes in the sequence of work, delays, disruptions, rescheduling, extended overhead, acceleration and /or impact costs. This form shall be used for work associated with undefined conditions. All work resulting from undefined conditions shall be authorized in writing and in advance by the Owner. The actual amount to be paid per field order has been negotiated and agreed by both parties. The Owner reserves the right to award none, any portion of, or all of the money associated with this allowance. Recommended: /ARCADIS US, Inc Date: Accepted /Contractor Date: �Z j Approved: /Owne Date: r CM 404 (05/09/06) Reese, William From: Linwood Lee <LLee @ticdiversified.com> Sent: Monday, January 12, 2015 3:13 PM To: Reese, William Subject: 133201 Tequesta Proposal Attachments: RFP 1 Proposal.pdf Bill, Attached is our proposal for the following. • Furnish and install new Point of use Water Heater (EMT 6). • Furnish and Install 2 each new 8" FL x PE spool piece and Mega Flange, due to crack in existing Flanged pipe. • Demo Flooring in storage room. • Add base molding to storage room and main shop room. Please confirm this proposal is acceptable as soon as possible, so that we may continue to move forward with this project. Linwood Lee Project Manager 7233 Southern Blvd., Suite B -1 West Palm Beach, Fl. 33413 Office - 561.478.2025, X -10214 Cell-561.719.1531 Fax - 561.478.7159 www.ticdiversified.com r Bid Item Work Type Area Description Takeoff Quantity Grand Total Grand Unit Price Total 001. F & I New Water Heater 1.00 LS 1,216.38 1,216 002. Remove & Replace Buried 8" DIP 1.00 LS 2,327.86 2,328 003. Demo Store Room Concrete Floor 1.00 LS 728.48 728 004. F & I New Baseboard in Storage and Main Shop 1.00 LS 1,621.12 1,621 Area Estimate Totals Description Amount Totals Hours Rate Cost Basis Cost per Unit Percent of Total Labor 3,989 48.999 hrs 3,988.620 /LS 61.52% Material 1,905 1,905.220 /LS 29.39% Subcontract Equipment Other 5,894 5,894 5,894.000 /LS 90.91 Profit 589 10.000 % T 589.350 /LS 9.09% 589 6,483 6,483.000 /LS 9.09 Total 6,483 6,483.000 /LS We agree to do the above estimated work for the price of 6,482 dollars Signature Signature Print Name Print Name Date Date