HomeMy WebLinkAboutDocumentation_Workshop_Tab 01_03/30/2015 Summary Capital Projects — March 2015
5 Year Cap�ftal Plan
Vllage Manager Michael Couao
As we continue to refine and develop a long term cap�tal improvement plan for the
Village, I respectfutly submit the following observations and re�rt for your
conslderations.
This approach primarily addresses categories foliowed by ind'nridual projects. It is
important du�ng this assessment of needs that p�orities be in harmorry with the
�Ilages long term vision.
• Public Safeiy — The primary goal is the prever�ion, protection and welfare of the
general public. Over the year� the �Ilage has provided i#s residents w�h highly
trained personnel in �lice and flre/rescue sen�ic�. Efforts have been made to
provide the necessary capital equipment, including facilities, equipmerrt�
communications and fleet vehicles.
❖ Fre/Rescue:
• 2016 machinery/equipment (air packs) e�imated cost $135.0�.00.
• 2017 vehicle%quipment estimated c�st $83,000.00.
• 201 S vehicle (rescue truck replacement) estimated �st $240��0.�.
• 2019 vehicle%quipment estimated cost $75,000.00.
• 2020 is the antictipated replac:ement time frame for the ladder truck
estimated cost $800,000.00.
• 2021 vehiclpJequipment (rescue vehicle replacement) esstlmmated cost
$300,�.00.
• Additional signific;�nt capital c�sts will resu{t, should the �Ilage decide to
construct addifional facil'r�ies.
•'• Police:
♦ • 2016-2020 Capital consists primarily of vehicle lease paymen�s and
computer equipment withh an esiimated cost of $120,000.00 yeariy.
Estimates will vary 'rf additional �rsonrtef or pr�rams are added.
• A key cam�nent of providing Public Safeiy servic.�es to our residerrts is
through implementation of effeccfiivve �mmunication techniques. The
�Ilage has implemented numerous communiration technolo�ies over
ti�e years to keep residents ir�formed.
• Advancements in communication technology is ocxumng at a rapid
pace and should be cor�sidered to enhance �ar goals. Additionally,
this technot�r provides a more effective, efficient and economicai
meth� for ir�formation delivery.
• T�hnological advanc�ments in such fields as videos, automated
detection, aerial surveillance, drone rescue systems and monitoring
should be continually evaluated. Technalogical system advancemer�ts
and integration will continue to � important in c�mplimenting sen►ices
provided by �Ilage personnel, wrhile mitigating c�sts in those areas.
❖ Recreation:
• Recrea�on senrices have evoived over the last decade and a half, and
are enjoyed by all age groups. The dem�raphy of the Village has
also changed, m�t significan�y by the increased numbers of younger
families with children. If this trend continues, programs and senrices
may require m�ifications. In the year 20� the �Ilage esserrtially had
one park, Constitution (with minimal programs provided by the YMCA).
Tequesta Park was leased as it is today. In 2015 the Village has a
vibrant recreation departmerrt providing a wide variety of community
senrices, and four park locations.
• Considera�on to providing additional facilities should be given.
Continuing to pursue the acquisi�on of Paradi� Park should be a
pr�ority either through a long term lease, lease/purchase or direct
purchase. Its central I��on presents a g�d option for an additional
recreationaUmurti-use fac7ity. The costs for purchase and
improvemer�ts would be significarrt and finandng wwuld need to be
considered. In the irrterim, if program expansion is desired Station 11
would � an option.
• As � ap�ars� �e Village is desirous of c�rrtinuing its lease of Tequesta
Park vvit� the State of Florida. Addfional enhar�cemer�ts may be
c�sired.
❖ General Capital Infrastructure Improvements:
� Over the years there has been considerable discussion regarding
sidewalk improvemerrt/enhant�ments, der.orative ligh�ing, and
land�ping. With the excep�ion of large scale proje�ts, I continue to
. believe that these improvements c�n � most effectivefy undertaken
as in house" projects by our public works personnel. Additional
staff'mg and equipment would be requir�.
• US 1 Corridor improvemec�ts projected writhin the next 3-4 years may
require Village funding.
• Tequesta Drive RRR Project estimated at appro�amately $600,�0.00
not ir�luding ligh�ng, sidewalks or landscaping.
• The Village may want to consider altemative technolagies to extend and
improve the appearanr.e of asphalt roadway at considerable savings.
The aforementioned information is submitted for your consideration as one vievupoint
and is not intended to � inclusive. It is meant to be c�nsidered vvith other
recommendations and addi�onal considerations that may come from future
discussions.
• Page 2
10 Year
,� �s Capital Improvements Wish List
Mayor Abby Brennan
FIRST - Protect the identity and appeal of the Village.
• We are who we are..........and thaYs why we chose to live here;
• Not a gated community; residents have choice of aesthetics including home colors, roof
styles, mailboxes, etc. (within the law and existing Village code);
• Residents in certain neighborhoods do not want sidewalks;
• Widening roads where rights-of-way are routinely planted and maintained by residents
will be met with resistance;
• Residents want streets and existing sidewalks to be safe, bike-friendly and
walkable.........speed limit and "share the road" education and enforcement critical;
• Local businesses are patronized by our community......assure that they are included in
benefits from capital projects being considered.
Streets and Sidewalks Infrastructure — Map out entire grid of major streets and comply
with "complete streets" initiative including State-approved design striping and signage.
Will begin a Village-wide network of pedestrian and cycle-friendly streets.
• Repave Tequesta Drive: In conjunction with the current US1 "complete streets"
initiative, repaving Tequesta Drive from US 1 to Country Club Drive in advance of US1
improvements. .(Do nothing at RR right-of-way pending outcome of AAF)
a. Tequesta Drive Sidewalk — South Side: Although concrete would be
preferable, perhaps re-asphalt at the same time as Tequesta Drive. Much of the
pathway has been encroached by grass and other landscaping. Safe passage
being key component of Complete Streets network. — Perhaps phased-in public
works project?
• Assessment of other Village roads - prioritized by need:
a. Country Club Drive
b. Seabrook (north of Tequesta Drive)
c. Riverside Drive (Tequesta border north to County Line Road)
d. EI Portal
e. Side streets as needed
• Country Club Drive Sidewalk: — Long stretch of asphalt crumbling at sides of path and
lifted by tree roots. Dig up, treat tree roots and re-asphalt (instead of concrete) in
keeping with CC Drive and side streets. No sidewalk on west side of street.
• Old Dixie — lay groundwork with PBC and FDOT for the eventual control of the roadway
• US 1— continue improvements (decorative lighting) landscaping over time with MPO
grants and State funding.
Note — some of these projects may be accomplished through the expanded Public Works
department.
Lighting and Signage - Map out a grid of existing FPL-provided lights including cobra-heads,
lantem style and others.
• Fill in at even lengths to provide consistency and overlapping lighting as appropriate to
the coverage areas;
• Convert to LED technology using as many FPL-provided fixtures as possible — cost
factors;
� Design and finatize the logo to be used on ALL Village signage (not regulated by FDO�.
Watermark style perhaps that can be the backdrop for signs, banners, etc. Pick a color
(or palette of colors) based on ease of visibility during both day and night. STICK WITH
IT;
• Highly visible "�Ilage of Tequesta° monument signage and decorative lighting at all
major gateways to the �Ilage.
Parks and Recreation Areas
• Constitution Park — update and upgrade. Work with Greg to identify new installations
that make the most sense and are easily maintained. I have no preference for what that
would be;
• Parks and Rec Center — Work with Greg to determine what configuration, addition, etc.
will best serve our residents. Consider rental spaces; fee-based after-school care, etc.;
• Station 11 — Community Hall? Rental space? Sale may not yield enough $ to consider,
� Tequesta Park - invest in creating and promoting a more user-friendly park; on-site rec
staff at some point may make sense; upgrade dog park area to include seating, shade
trees, double entry gates, etc. Gato park for Tequesta Fest and Chili Cook-off if
Paradise Park access is lost;
• Paradise Park — with the exception of Tequesta Fest and Chili Cook-off, dog owners are
most often seen using the park. Usage not guaranteed; possible joint venture with
owner to assure access to some portion of the park;
• Remembrance Park — reconsider sale as a means to implement the above suggestions
— passive park needs maintenance and likely will have low usage — escrow funds to
upgrade other parks;
• Coral Cove Park — continue conversation with PBC for beach control and establish
public safety sutrstation more important because of pending US 1 Bridge closure in
2020.
Funding and Other Considerations:
• MPO Funding — increase chances by networking Village streets with FDOT complete
streets programs;
• Tequesta Park — State $$ may be available to upgrade this facility; State funding to
continue path from Martin County Line to the Park; Martin County being asked to
continue the path to Old Dixie;
• US1 Bridge closure — provides an opportunity to negotiate fire rescue contracts for all
unincorporated properties north of the bridge. Access by PBC Fire Station at Burt
Reynolds Park will be cut off. capital projects being considered. This may actually be an
inroad to the Shemff for the same reason.
• Annexation — begin conversation with State legislature which sets the minimum amourrt
of property required for an automatic annexation. Continue conversation with PBC for
possible top-down annexation support.
• All Aboard Florida — continue ... ... ...... ......
, � 10 Year
�: Capital Improvements Wish List
Vice-Mayor Vince Arena
1. Lights on other side of bridge
2. US 1
3. Tequesta Drive
a. Bike
b. Sidewalks
4. Remembrance Park
5. Sidewalks (Country Club Drive)
6. Front area of Tequesta Park
7. "Re-paint" or "Pressure Clean" bridge
8. Change out entrance signs
a. Four (4) total plus one (1) in Country Club back
9. Paddle board area by bridge (NE corner)
10. Water park in Constitution Park
11. Figure out what to do with old fire building on Seabrook
10 Year
Capital Improvements Wish List
Council Member Frank D'Ambra
1. US 1—(it would be nice to ultimately add new decorative lighting the entire stretch.)
2. Tequesta Drive repaving with concrete sidewalks, both sides of street and decorative
lighting
3. Country Club — Concrete Sidewalks both sides of street and decorative lighting
4. Curbs on both Tequesta Drive and Country Club
5. Seabrook - add decorative lighting.
6. All new streeUroad signs on all Tequesta Roads
7. New Village entry markers on US 1, Old Dixie, County Line, and Seabrook & Country
Club 8� on the island.
8. Constitution Park — Splash Park Addition
9. Constitution Park — New facilities building
10. Tequesta Park — Complete park wide upgrade
11. Paradise Park — Purchase & Enhance
12. Remembrance Park — Sell
13. Old Fire Building — Sell
14. Old Dixie — take ownership from County with an appropriate sum to renovate to new
Tequesta standards. (Gain Jupiter's consent for Tequesta to annex area north of A1A
and between US 1 and Old Dixie)
15. New/enhanced landscape p�antings on all main thoroughfares, Tequesta Drive, Country
Club, Seabrook, Old Dixie & Tequesta side of County Line.
Water Utility
1. Replace asbestos pipes.
, 10 Year
Capital Improvements Wish List
Council Member Steve Okun
A Capital Improvement Plan provides for a relatively short-range acquisition and financial
engineering plan that:
1. Identifies capital improvement needs and associated equipment purchases
2. Provides an adaptable prioritized planning & phased implementation schedule
3. Identifies funding options that provide for the financial acquisition and sustainability of
support good & services.
A 10-year projection of Capital Improvements in an achievable format, and can be scaled to suit
realistic management capacity related to the scope of activity. While the list of desired capital
improvements for consideration can be extensive and far-reaching, the actual number of
improvements will adapt annually according to need, and prioritized order of necessity and
financial capability. Safeguarding the health and welfare of the Village continuously remains the
top priority for action.
RECOMMENDATIONS [in no particular order] FOR CONSIDERATION
• RRR of Tequesta Drive from Old Dixie Highway Railroad tracks westward to
Riverside Drive, along with RRR of a small adjoining portion of Riverside Drive from
southern municipal property line to the intersection of Riverside Drive S. and Tequesta
Drive.
• Sidewalk repairs & construction in various areas within the Village. Ultimately, the Village
should consider a Village-wide sidewalk 8� curbing development plan. An inspection &
grading assessment should list the specific areas to determine priorities once a
"standard" is established.
• Village-wide beautification program with enhanced landscaping complemented by select
indirect LED lighting. A phased development plan would identify and prioritize phases in
concert with upgraded Village Public Works capabilities.
• Establishing Tequesta Gateway Monument Signage & Landscaping at all community
entry/exit points of Federal Hwy-US-1, Old Dixie Highway, Riverside Drive, and
Seabrook. These gateway monuments should be lighted by cost-effective LED
illumination.
• New logo-identified signage designating the when/where confines of the Village of
Tequesta.
• Centralize resources by acquiring real estate adjacent to and contiguous with the
existing Park & Rec./Constitution Park complex for expansion.
• Replacing or upgrading the existing Park & Recreation facility with a 2-story complex.
• Phased integration of LED street lighting for cost-effective lifetime illumination along the
entire span of major streets.
• Acquisition through negotiation with County of Old Dixie Highway roadway 8� easement
within the Village confines.
• Acquisition through annexation or other means of real estate within the existing US-1
corridor to the intersection of US-1 and Alternate A1A.
• Acquisition through annexation or other means of real estate within the existing Old Dixie
Highway north of intersection of Alternate A1A and Old Dixie Highway to Village line.
• Acquisition of a larger rigid-hull marine vessel for combined use by Tequesta Emergency
Services.
• Augmenting Constitution Park facilities with a children's °splash park° 8 community pool.
• Upgrade and enhance curb appeal and select areas within Tequesta Park.
• Upgrade signage program �Ilage-wide with logo and provide directional signage to
essential municipal sites such as Police, Fire-Rescue, Park � Rec, municipal campus,
and water department.
• Explore public-private partnership for strategic development of existing Paradise Park
site.
• Establish an emergency services sub-station at County's Coral Cove Park on Jupiter
Island.
Many of the Image suggestions are intended to upgrade perceptions in anticipation of the
increased rail activity (trafFc congestion, noise, etc.) that risk compromise to land values.
Spiraling erosion of land values will lower ad valorem that in tum raise the need to increase
revenues to compensate. Major source of revenue is ad valorem taxes. Ta�cpayer Relief:
Greater emphasis must be placed on emergency services enterprise initiatives to generate and
supplement non-ad valorem revenues.