Loading...
HomeMy WebLinkAboutAgreement_General_12/10/2015 (7) AR ARCADIS U.S., Inc. Infrastructure • Water. Environment. Buildings 2081 Vista Parkway Suite 305 West Palm Beach Florida 33411 Village of Tequesta Tel 561 6977000 345 Tequesta Drive Fax 561 697 7751 Tequesta, FL 33469 www.arcadis- us.com Attn: Sam Heady, Deputy Director of Utilities RE: WTP- Chemical Tank Replacements WATER RESOURCES Dear Mr. Heady: Enclosed is a proposed work authorization to cover the replacement of the Dale: sodium hydroxide and sulfuric acid bulk and day tanks. Since it was not included on October 23, 2015 the CIP we have not included a cover over the chlorine tanks or other items discussed but can easily do so if you wish. Along that same line we can also include Contact: the additional items as bidding alternatives if desired. William D. Reese, PE Phone: Please review and advise how you would like to proceed. Should you have 561.697.7069 questions or require anything further, please call. Email: • Very Truly Yours, william.reese @arcadis- ARCADIS U.S., Inc. us.com Our ref: �—' RF005106.0001 William D. Reese, PE Vice President Florida License Numbers encls. Engineering 7917 Geology GB564 Surveying LB7062 1 0 Imagine the result g:laprojects\wr \rf projecls\lequesla \15- 106\docs \heady Ilr lank report 10232015.doc r • VILLAGE OF TEQUESTA WATER SYSTEM AND GENERAL UTILITY /CIVIL PROJECTS WORK AUTHORIZATION WTP — Sodium Hydroxide and Sulfuric Acid Tank Replacement This Work Authorization authorizes ARCADIS G &M, Inc. to perform the work set forth herein and is issued pursuant to the "Professional Engineering Consulting Services Agreement for Water System and General Utility /Civil Projects ", dated November 17, 2005. All terms and conditions of said agreement shall be applicable to this Work Authorization. SCOPE This project includes engineering design, permitting and bid services for the replacement of the existing Sodium Hydroxide and Sulfuric Acid Tanks at the water treatment plant. This will include the bulk tanks and day tanks. The Engineer will perform the following tasks. 1. Prepare finals plans, specifications and bidding documents for the work and review with the Owner. • 2. If required, prepare PBCHD permit documents, submit the permit application and act as the Owner's liaison with the agency during the permitting process. 3. Prepare bidding documents. 4. Prepare a construction cost estimate. 5. Assist the Owner with securing a bid. Evaluate the bids and make a recommendation of award. 6. Prepare contract sets. 7. Perform all `Engineering' duties as set forth in the construction contract and administer the construction contract. 8. Provide part-time inspection services during construction. 9. Provide periodic site visits from the Engineer during construction. 10. Certify project completion to the PBCHD upon completion. • Page 1 of 2 • COMPENSATION For Scope Items 1 thru 5, the Engineer shall be paid a lump sum fee of fourteen thousand, five hundred dollars ($14,500). For scope items 6 -10 the Engineer sliall be paid a lump sum fee of seven thousand five hundred dollars (7,500). The compensation indicated above is predicated on the following assumptions: 1. The document will reflect the requirement that the plant will need to be maintained in service during the construction period. Temporary chemical feed facilities may be required. 2. Permit fees, if any, will be paid directly by the Village. 3. The need for heat tracing the caustic tank will be evaluated and implemented if appropriate. 4. The tank sizes and general materials of construction will remain the same as existing. TIME OF PERFORMANCE The Engineer will complete Scope Items 1 thru 4 within 75 days of the receipt of an executed authorization, exclusive of delays beyond the control of the Engineer. This authorization can be cancelled with or without cause by the Village with 30 days written notice. Should said cancellation occur, the Engineer will be paid for all services performed . through the cancellation date. ACCEPTED BY: Village of Tequesta (WTP — Sodium Hydroxide and Sulfuric Acid Tank Replacement) Michael R. Couzzo, Village Manager Date: ARCADIS US, Inc. (WTP— Sodium Hydroxide and Sulfuric Acid Tank Replacement) William D. Reese, P.E., Vice President Date: /O A • X//J— Page 2 of 2 • ADDENDUM Public Records: In accordance with Sec. 119.0701, Florida Statutes, the Contractor must keep and maintain this Agreement and any other records associated therewith and that are associated with the performance of the work described in the Scope of Services. Upon request, the Contractor must provide the public with access to such records in accordance with access and cost requirements of Chapter 119, Florida Statutes. Further, the Contractor shall ensure that any exempt or confidential records associated with this Agreement or associated with the performance of the work described in the Scope of Services are not disclosed except as authorized by law. Finally, the Contractor shall retain the records described in this paragraph throughout the performance of the work described in the Scope of Services, and at the conclusion of said work, transfer to the Village, at no cost to the Village, all such records in the possession of the Contractor and destroy any duplicates thereof. Records that are stored electronically must be transferred to the Village in a format that is compatible with the Village's information • technology systems. •