Loading...
HomeMy WebLinkAboutAgreement_General_08/27/1996 RECORD AND RETURN TO: JOHN C..RANDOLPH, ESQUIRE JONES, FOSTER, JOHNSTON & STUBBS, P.A. POST OFFICE BOYHFL 75 WEST PALM BEAC 33402 -3475 W�CALL #85 1' -0' -1996 4:15pm S`6 --30 x 510 ORB 94-42 F9 91 1 .i1 11 IN1111 will 1 11 ®1! D C Land Co., Ltd., Restaurant Site NAME OF PROJECT DEVELOPER AGREEMENT THIS AGREEMENT made and entered into this 2 day of 40 JS 19_96, by and between, DC Land Company, Ltd. hereinafter referred to as "Developer ", and Tequesta Water Department, hereinafter referred to as Utility. WHEREAS, Developer owns or controls lands located in the Utility ��rvice area, and described in Exhibit "A ", attached hereto and made a part hereof as if fully set out in this paragraph and hereinafter referred to as the "Property" and Developer intends to develop the Property by erecting thereon, individually metered residential units, commercial units, or a combination of these; and WHEREAS, Developer desires that the Utility provide water service for Developer's Property herein described; and WHEREAS, the Utility is willing to provide, in accordance with the provisions of this Agreement and Tequesta Water Department Service Policies, water service to the Property and thereafter operate applicable facilities so that the occupants of the improvements on the Property will receive an adequate water supply. NOW, THEREFORE, for and in consideration of the premises, the mutual undertakings and agreements herein contained and assumed, Developer and Utility hereby covenant and agree as follows: 1. The foregoing statements are true and correct. jr 2. The following definitions and references are given for the purpose of interpreting the terms as used in this Agreement and apply unless the context indicates a different meaning; (A) "CONSUMER INSTALLATION" - All facilities ordinarily on the consumer's side of the point of delivery. MT. 9427 Pg 92 D C Land Co., Ltd. Restuarant Site NAME OF PROJECT (B) "DEVELOPMENT PHASE" - A subdivision or construction phase of the construction of utility facilities on the property. (C) "EQUIVALENT RESIDENTIAL CONNECTION (ERC)" - A factor used to convert a given average daily flow (ADF) to the equivalent number of residential connections. For this purpose the average daily flow of one equivalent residential connection (ERC) is 350 gallons per day (GPD). The number of ERC's contained in a given ADF is determined by dividing that ADF by 350 GPD. (D) "POINT OF DELIVERY" - The point where the water lines or meter(s) of the Utility are connected with the water lines of the consumer. Unless otherwise indicated, the point of delivery shall be on the consumer's side or discharge side of the water meter(s) that will be utilized for delivery of water service. The Utility shall, according to the terms and conditions hereof, own all pipes and appurtenances to the point of delivery unless otherwise agreed upon. The pipes and appurtenances outside the point of delivery shall belong to others. (E) "PROPERTY" - The area or parcel of land described in Exhibit " A " by legal description. (F) "SERVICE" - The readiness and ability on the part of the Utility to furnish and maintain water service to the point of delivery for each lot or tract pursuant to applicable rules and regulations of applicable regulatory agencies. 3. Annexation - No unincorporated property contiguous to the corporate limits of the Village of Tequesta, not currently receiving water service pursuant to a water service agreement or franchise agreement with the Tequesta Water Department, shall be allowed to connect to or be provided water service through the Tequesta Water Department without first being annexed into the corporate limits of the Village of Tequesta. 4. Assurance of Title - At the time of execution of this Agreement, the Developer agrees to deliver to the utility a copy of Title Insurance Policy or an Opinion of Title from a qualified attorney -at -law, with respect to the Property, which opinion shall include a current report on the status of the title, setting out the name of the legal title holders, the outstanding mortgages, taxes, liens and covenants. The provisions of this paragraph are for the 2 ORE X427 P9 D C Land Co., Ltd. Restuarant Site NAME OF PROJECT purpose of evidencing Developer's legal right to grant the exclusive rights of service contained in this Agreement. S. Connection Charges - In addition to the contribution of any water distribution system, where applicable, and further to induce the Utility to provide water service, Developer hereby agrees to pay the Utility, connection charges as defined in Exhibit "B ". Payment of the connection charges does not and will not result in the Utility waiving any of its rates or rules and regulations, and their enforcement shall not be affected in any manner whatsoever by Developer making payment of same. The Utility shall not be obligated to refund to Developer any portion of the value of the connection charges for any reason whatsoever, nor shall the Utility pay any interest or rate of interest upon the connection charges paid. Neither Developer or any person or other entity holding any of the Property by, through, or under Developer, or otherwise, shall have any present or future right, title, claim or interest in and to the connection charges paid to the Utility. Any user or consumer of water service shall not be entitled to offset any bill or bills rendered by the Utility for such service or services against the connection charges paid. Developer shall not be entitled to offset the connection charges against any claim or claims of the Utility including claims for breach of contract, damages, or charges of the like of the Utility. 6. OVERSIZED FACILITIES REQUIREMENT; REIMBURSEMENT - If the water service facilities can reasonably be expected to serve other areas than those of the Developer, the Utility shall require that they be oversized to enable water service to be provided to such additional property. However, there will be no reimbursement for the construction of six (6) inch or eight (8) inch water mains, which are the minimum standard sizes, even if these sizes exceed the Developer's own requirements. The Developer will be reimbursed for the estimated difference in the cost of construction between the oversized facilities and those facilities the Developer otherwise would have been required for his own use. The amount of the reimbursement shall be determined by the Utility based on the data concerning construction costs of the Utility and upon data which may be supplied to the Utility by the Developer's engineer. The Utility shall make every effort to properly evaluate the "cost difference" for over sizing, but in the event of a disagreement, the decision of the Utility shall be final and binding. The method of reimbursement shall be as follows: The Developer will receive the reimbursement due it from the other Developers, as 3 - 9427 D C Land Co., Ltd., Restaurant Site NAME OF PROJECT each Developer connects, for a time period up to five (5) years. 7. PAYMENT - Developer shall pay, in full, connection charges at the time of execution hereof. 8. Equivalent Residential Connections Reserved - The parties agree that the capacity needed to provide service to the Property is 1.5 equivalent residential connections (ERC's) for water supply. Developer agrees that the number of units of capacity reserved hereby shall not exceed the number of units of development for which capacity is reserved hereby pursuant to Exhibit "B ". 9. On -Site Installation - To induce the Utility to provide the water treatment facilities, and to continuously provide consumers located on the Property with water service, unless otherwise provided for herein, Developer hereby covenants and agrees to construct and to transfer ownership and control to the Utility, the on -site water distribution systems referred to in Exhibit "B" herein. Developer shall cause to be prepared five (5) copies of the applications for permits and a sufficient number of sets of finalized engineering plans prepared and sealed by a professional engineer registered in the State of Florida (Utility will retain four (4) sets), along with a copy of the final estimate of quantities covering all contract items that are to be dedicated to the Utility. Plans shall show the on -site water distribution system proposed to be installed to provide service to consumers within the Property. Such plans will also show the interconnection of such on -site facilities to the off -site facilities of the Utility or off -site facilities that may be constructed by Developer or others and given to the Utility. Such detailed plans may be limited to the first development phase only, and subsequent phases may be furnished from time to time. However, each such development phase shall conform to a master plan for the development of the property and such master plan shall be submitted to the Utility concurrent with or prior to submission of engineering plans for the first development phase. Developer reserves the right to modify his master plan any time in such a manner as to not unduly interfere with the Utility's existing facilities and upon modification, shall submit four (4) copies of the modified plan to the Utility. The cost of any modifications to the Utility's existing systems or to its Master Plan that are caused by Developer's modifications or changes shall be borne by Developer. Developer shall cause his engineer to submit specifications governing the material to be used and the method and manner of installations. All such plans, specifications and shop drawings submitted to the Utility shall meet the minimum specifications of the Utility and shall not be unreasonably withheld. The Utility reserves the right to review the revised Master Plan and recalculate the connection charges that are to be paid by the Developer at the time the revised Master Plan is submitted. No construction shall commence 4 ORB 9427 Pa 95 D C Land Co., Ltd., Restaurant Site NAME OF PROJECT until the Utility and appropriate regulatory agencies have approved such plans and specifications in writing. When permits and approved plans are returned by appropriate regulatory agencies to Developer, Developer shall submit to the Utility one (1) copy of the water permit(s) and approved plans. If construction commences prior to all such approvals and any other approvals required hereunder, the Utility shall have no responsibility to accept such lines or facilities, and the Utility may elect to terminate this Agreement and /or not provide service to Developer until such time as Developer obtains such required approvals and the Utility has witnessed all of its required inspections and tests. After the approval of plans, specifications and shop drawings by the Utility and appropriate regulatory agencies, Developer, or the engineer of record, shall conduct a pre- construction conference with engineer of record, utility contractor, appropriate building official(s), all other utility companies involved in the development of the Property, and Tequesta Water Department. Developer shall provide to the Utility's inspector a minimum of forty -eight (48) hours notice, excluding weekends and holidays, prior to commencement of construction. Developer shall cause to be constructed at Developer's own cost and expense, the water distribution system as shown on the approved plans and specifications. During the construction of the water distribution system by Developer, the Utility shall have the right to inspect such installations to determine compliance with the approved plans and specifications. The Utility Engineer of record and Utility Contractor shall be present for all standard tests for pressure, exfiltration, line and grade, infiltration and all other customary engineering tests to determine that the systems have been installed in accordance with the approved plans and specifications, good engineering practices, and American Water Works Association (AWWA) criteria as well as other federal, state and local regulations which are applicable. Upon completion of construction, Developer's Engineer of record shall submit to the Utility a signed copy of the Certification of Completion submitted to the appropriate regulatory agencies. A copy of the bacteriological results and a sketch showing locations of all sample points shall be included. The engineer of record shall also submit to the Utility, ammonia mylars of the as -built plans prepared and certified by the engineer of record, and ammonia mylars of the recorded plat, including the dedications sheet(s). By these presents, Developer hereby covenants to transfer to the Utility title to all water distribution systems installed by Developer or Developer's contractor shown in Exhibit "B" of this Agreement dealing with those potable water supply facilities that will be transferred from Developer to the Utility, pursuant to the provisions 5 �`PP 9427 Ps 96 D C Lland Co., Ltd. Restaurant Site NAME OF PROJECT of the Agreement. Such conveyance shall take effect at the time the Utility issues its final Letter of Acceptance. As further evidence of said transfer of title, upon the completion of the installation, but prior to the issuance of the final Letter of Acceptance and the rendering of service by the Utility, Developer shall: (A) Convey to the Utility by notarized bill of sale in form satisfactory to Utility's counsel, the water distribution system listed in Exhibit "B" as constructed by Developer and approved by Utility. (B) Provide Utility with copies of invoices from contractor for installation of the utility systems being dedicated to Service Company, including engineering design and inspection fees so paid. (C) Furnish proof satisfactory to the Utility that the installation of the facilities and all contractors, sub- contractors, material men, laborers and engineers have been paid in full (i.e., by release of lien or other appropriate means). (D) Warrant and /or guaranty all utility facilities being dedicated to the Utility against faulty workmanship and defective materials for a period of one (1) year from the date of the Utility's final letter of acceptance. Also, Developer shall assign any and all warranties and /or maintenance bonds and the rights to enforce same to the Utility which Developer obtains from any contractor constructing the water system. Developer shall remain secondarily liable on such warranties. If Developer does not obtain such written warranty and /or maintenance bond from its contractor and deliver same to the Utility, which warrant and /or maintenance bond shall be for a minimum period of one (1) year, then in such event, Developer, by the terms of the Agreement covenants to indemnify and save harmless the Utility for any loss, damages, costs, claims, suits, debts, or demands by reason of defects in the systems for a period of one year from date of the final Letter of 3r Acceptance by the Utility. (E) Provide the Utility with all appropriate operation /maintenance and parts manuals. (F) Further cause to be conveyed to the Utility, free and clear of all encumbrances, all utility easements and rights -of -way covering areas in which water systems are installed, or otherwise required, in recordable form 6 ORB 9427 P9 D C Land Co., Ltd. Restaurant Site NAME OF PROJECT satisfactory to the Utility's counsel. If applicable, the Utility may require joinder or any condominium association, cooperative or other vendee of the Property. The Utility agrees that the issuance of the final Letter of Acceptance for the water distribution system installed by Developer shall constitute the assumption of responsibility by the Utility for the continuous operation and maintenance of such systems from that date forward, subject to the terms and conditions contained herein. Whenever the development of the subject property involves one consumer or a unity of title of several consumers, and /or in the opinion of the Utility ownership by the Utility of the internal water distribution system is not necessary or proper, then at the option of the Utility, Developer shall retain ownership and the obligation for maintenance of such on- site water facilities located on the discharge side of a master meter located on the consumer's side of the point of delivery. In the event that the Utility, for whatever reason, does not take possession, ownership and control of the on- site facilities constructed by the Developer, and provides master metered service to the Developer for the use of several consumers within the on -site facilities, the Developer shall be required to: 1) Maintain water quality at each individual outlet which is in compliance with all primary and secondary standards promulgated by the Florida Department of Environmental Protection, or County Health Department. At no time shall such water quality standards be required to be in excess of those attained at the Utility's point of delivery master meter. (2) Institute a program of line flushing in order to help in the reduction of sedimentary deposits in the Developer's on -site lines, and reduce the possibility that water quality standards will fall below those required by subsection " A " above. Such line flushing shall be conducted in accordance with reasonable engineering standards as necessary to meet the objectives as outlined herein. Such flushing shall occur at a minimum of not less than N/A Developer shall provide the Utility a minimum of forty -eight (48) hours 7 OR. 9427 P9 96 D C Land Co., Ltd. Restaurant Site NAME OF PROJECT notice of the time and place of such flushing. The Utility shall send its representative to observe such flushing and record the amount of water used for that purpose as indicated by the Master Meter. Developer shall be solely and directly responsible for the cost of all water used in the flushing of his on -site facilities, such billing and collection to be conducted in accordance with the provisions of the Utility's approved ordinances and /or policies. 3) Developer shall be responsible for maintaining all on- site water facilities in accordance with reasonably prudent engineering standards. The Utility shall have the right to inspect the facilities of the Developer during reasonable business hours upon twenty -four (24) hours notice to the Developer. If the Utility determines that the Developer has failed to comply with the provisions of this section, Utility shall provide an explanation of the reason for such violation at which point, the Developer shall have twenty (20) days or such other time as is reasonably necessary to correct the deficiency. Upon failure to do so, Utility shall have the power and right to discontinue service in accordance with the provisions of its approved ordinances and /or policies for non - payment of bills. 10. OFF -SITE INSTALLATION - Developer may be required to construct, at his sole expense, certain off -site water facilities in order to connect Developer's on -site facilities to the Utility's existing water system. In addition, Developer may be required to dedicate all or a portion of said off -site water facilities to the utility for ownership, maintenance and operation. All provisions in Section 9 above, entitled "On -Site Installations ", pertaining to specifications, plans, permits and approvals shall also be applicable to all off -site water facilities construction. 11. EASEMENTS - Developer hereby grants and gives to the'Utility, its successors and assigns, but subject to the terms of this Agreement, the exclusive right or privilege to construct, own, maintain or operate the water facilities to serve the Property; and the exclusive right or privilege to construct, own, maintain, alter, replace and operate said facilities in, under, upon, over and across the present and future streets, roads, alleys, easements, reserved utility strips and utility sites, and any public place as provided and dedicated to public use in the record plats, or as provided for in agreements, dedications, or 8 ORB 9427 Ps 99 D C Land Co., Ltd., Restaurant Site NAME OF PROJECT grants made otherwise, and is independent of said record plats. Developer shall obtain any and all necessary off -site easements that may be required in order to carry out the terms, conditions and intent hereof, at Developer's expense, and shall convey, if any, holding prior liens on the Property shall be required to release such liens, subor- dinate their position or join the grant or dedication of the easements or rights -of -way, or give to the Utility assurance by way of "non - disturbance agreement ", that in the event of foreclosure, mortgagee would continue to recognize the easement rights of the Utility, as long as the Utility complies with the terms of the Agreement. All water distribution facilities, save and except consumer installations, shall be covered by easements or rights -of -way if not located within platted or dedicated roads or rights -of -way for utility purposes. Developer hereby further agrees that the foregoing grants or promises of grants include the necessary right of ingress and egress to any part of the Property upon which the utility is constructing or operating such facilities: That the foregoing grants shall be for such period of time as the Utility or its successors or assigns require such rights, privileges or easements in the construction, ownership, maintenance, operation or expansion of water facilities, that in the event Developer and Utility agree that the Utility is to install any of its water facilities in lands within the Property lying outside the streets and easement areas described above, then Developer or the Owners shall grant to the Utility, without cost or expense to the Utility, the necessary easement or easements for such "private property" installation; provided, all such "private property" installations by the Utility shall be made in such a manner as not to interfere with the then primary use of such "Private Property ". The Utility covenants that it will use due diligence in ascertaining all easement locations; however, should the Utility install any of its facilities outside a dedicated easement area, the Utility will not be required to move or relocate any facilities lying outside dedicated easement area, so long as the facilities do not interfere with the then or proposed use of the area in which the facilities have been installed and so long as the Utility obtains a private easement for such facility location, which Developer will give if same is within his reasonable power to do so. The use of easements granted by Developer other than Utility shall preclude the use by other utilities of these easements, such as for cable television, telephone, electric, or gas utilities; or as otherwise agreed to by the Utility. In the event Developer fails to actually deliver such easement, this document shall serve as the Utility's authorization to substitute the Agreement as a recorded easement sufficient for the Utility's needs. 9 4RB 9427 Pe 100 D C Land Co., Ltd., Restaurant Site NAME OF PROJECT The Utility hereby agrees that all easement grants will be utilized in accordance with the established and generally accepted practices of all its facilities in any of the easement areas. However, this provision shall not be construed so as to require the Utility to restore those improvements constructed, installed or planted within the Utility Easement which are not in accordance with the established and generally accepted practices of the water industry with respect to the use of utility easements. 12. AGREEMENT TO SERVE - Upon the completion of construction of the on -site and off -site water facilities required hereunder by the Developer, its inspection, the issuance of the final letter of acceptance by the Utility, and when all appropriate governmental agency approvals have been received, the Utility covenants and agrees that it will connect or oversee the connection of the water distribution facilities installed by Developer to the central facilities of the Utility in accordance with the terms and intent of this Agreement. Such connection shall at all times be in accordance with rules, regulations and orders of the applicable governmental authorities. The Utility agrees that once it provides water service to the Property and Developer or others have connected consumer installation to its system, that thereafter the Utility will continuously provide, at its cost and expense, but in accordance with the other provisions of the Agreement, including rules and regulations and rate schedules, water service to the Property in a manner to conform with all requirements of the applicable governmental authority having jurisdiction over the operations of the Utility. 13. APPLICATION FOR SERVICE; CONSUMER INSTALLATIONS: - Developer, or any owner of any parcel of the Property, or any occupant of any residence, building or unit located thereon shall not have the right to and shall not connect any consumer installation to the facilities of the Utility by the prospective user of water service, in accordance with the then effective rules and regulations of the Utility and approval for such connection has been granted. Although the responsibility for connection of the consumer installation to the meter and /or lines of the Utility at the point of delivery is that of the Developer or entity other than the Utility, with reference to such connections, the parties agree as follows: (A) Approved backflow preventers must be installed prior to the Utility providing meters and service. (B) Application for the installation of water meters shall be made seventy -two (72) hours in advance, not including Saturdays, Sundays and holidays. 10 ORB 9427 P9 101 D C Land Co., Ltd., Restaurant Site NAME OF PROJECT (C) All consumer installation connections must be inspected • by the Utility before back - filling and covering of any pipes. (D) Notice to the Utility requesting an inspection of a consumer installation connection may be given by the plumber or Developer, and the inspection will be made within twenty -four (24) hours, not including Saturdays, Sundays and holidays, provided the water meter and backflow preventer have been previously installed. If the Utility fails to inspect the consumer installation connection within forty -eight (48) hours after such inspection is requested by Developer or the owner of any parcel, Developer or owner may backfill or cover the pipes without the Utility's approval and the Utility must accept the connection as to any matter which could have been discovered by such inspection. 14. THE UTILITY'S EXCLUSIVE RIGHT TO UTILITY FACILITIES - Developer agrees with the Utility that all water facilities accepted by the Utility in connection with providing water service to the Property (including fire service) , shall at all times remain in the sole, complete and exclusive ownership of the Utility, its successors and assigns, and any person or entity owning any part of the Property or any residence, building or unit constructed or located thereon, shall not have any right, title, claim or interest in and to such facilities or any part of them, for any purpose, including the furnishing of water service to other persons or entities located within or beyond the limits of the Property. 15. EXCLUSIVE RIGHT TO PROVIDE SERVICE - Developer, as a further and essential consideration of the Agreement, agrees that Developer, or the successors and assigns of Developer, shall not (the words "shall not" be used in a mandatory definition) engage in the business or businesses of providing potable water service to the Property during the period of time the Utility, its successors and assigns, provide water service to the Property, it being the intention of the parties hereto that under the foregoing provision and also other provision of this Agreement, the Utility shall have the sole and exclusive right and privilege to provide water service to the Property and to the occupants of such residence, building or unit constructed thereon. 16. RATES - The Utility agrees that the rates to be charged to Developer and individual consumers of water service shall be those set forth in the ordinances and /or policies of the Utility. However, notwithstanding any provision in this Agreement, the Utility, its successors and assigns, may establish, amend or revise, from time to time in the future, and enforce rates or rate schedules so established and enforced and shall at all times be reasonable and subject to 11 ORB 9427 Fg 10 ,7- D C Land Co., Ltd., Restuarant Site NAME OF PROJECT regulations by the applicable governmental agency, or as may be provided by law. Rates charged to Developer or consumers located upon the Property shall at all times be identical to rates charged for same classification of service, as are or may be in effect throughout the service area of the Utility. Notwithstanding any provision in this Agreement, the Utility may establish, amend or revise, from time to time, in the future, and enforce rules and regulations covering water service to the Property. However, all such rules and regulations so established by the Utility shall at all times be reasonable and subject to such regulations as may be provided by law or contract. Any such initial or future increased rates, rate schedules, and rules and regulations established, amended or revised and enforced by the Utility from time to time in the future, as provided by law, shall be binding upon Developer; upon any person or other entity holding by, through or under Developer; and upon any user or consumer of the water service provided to the Property by the Utility. 17. BINDING EFFECT OF AGREEMENT - This Agreement shall be binding upon and shall inure to the benefit of Developer, the Utility and their respective assigns and successors by merger, consolidation, conveyance or otherwise subject to the terms and conditions of this Agreement as contained herein. Developer understands and agrees that capacity reserved hereunder cannot and shall not be assigned by except in the case of a bona fide sale of Developer's Property, or limitation, the transfer or assignment of the Property as a result of a judicial proceeding such as mortgage foreclosure or sale, and assignment for the purposes of obtaining financing. In any such case, the Developer shall provide a Notice of evidence of such assignment, or partial assignment as the case may be, to the Utility and the Agreement with assignee or the transferee. Such approval to sale, transfer, or assignment shall not be unreasonably withheld. Nothing herein shall preclude sales of individual units and assignment or rights of water service pertaining thereto. 18. NOTICE - Until further written notice by either party to the other, all notices provided for herein shall be in writing and transmitted by messenger, by mail or by telegram, and if to Developer, shall be mailed or delivered to Developer at: William Shannon 4500 PGA Boulevard Suite 400 Palm Beach Gardens, FL 33418 12 ORB 9427 P9 103 D C Land Co., Ltd. Restaurant Site NAME OF PROJECT and if to the Utility, at: Tequesta Water Department 357 Tequesta Drive /P.O. Box 3474 Tequesta, Florida 33469 Attention: Water System Manager 19. LAWS OF FLORIDA - This Agreement shall be governed by the laws of the State of Florida and it shall be and become effective immediately upon execution by both parties hereto, subject to any approval which must be obtained from governmental authority, if applicable. 20. COSTS AND ATTORNEY'S FEES - In the event the Utility or Developer are required to enforce this Agreement by Court Proceedings or otherwise, by instituting suit or otherwise, then the prevailing party shall be entitled to recover from the other party all costs incurred, including reasonable attorney's fees. 21. FORCE MAJEURE - In the event that the performance of this Agreement by the Utility to this Agreement is prevented or interrupted in consequence of any cause beyond the control of the utility, including, but not limited to, Acts of God, or of the public enemy, war, national emergency, allocation or of other governmental restrictions upon the use or availability of labor or materials, rationing, civil insurrection, riot, racial or civil rights disorder or demonstration, strike, embargo, flood, tidal wave, fire, explosion, bomb detonation, nuclear fallout, windstorm, hurricane, earthquake, or other casualty or disaster or catastrophe, unforeseeable failure or breakdown of pumping transmission or other facilities, any and all governmental rules or acts or orders or restrictions or regulations or requirements, acts or action of any government or public or governmental authority or commission or board or agency or agent or official or officer, the enactment of any statute or ordinance or resolution or regulation or rule or ruling or order or decree or judgment or restraining order or injunction of any court, said party shall not be liable for such non - performance. 22. INDEMNIFICATION - Developer agrees to indemnify and hold the Utility harmless from and against any and all liabilities, claims, damages, costs and expenses (including reasonable attorney's fees) to which the Utility may become subject by reason of or arising out of Developer's breach or non - performance of this Agreement. This indemnification provision shall survive the actual connection to the Utility's water system. MISCELLANEOUS PROVISIONS 23. This Agreement supersedes all previous agreements or representations, either verbal or written, heretofore in effect between 13 ORB 9427 F9 105 D C Land Co., Ltd., Restaurant Site NAME OF PROJECT diligently and earnestly, at Developer's sole cost and expense, make the necessary and proper applications to all governmental authorities and will pursue the same to the end and that it will use its best efforts to obtain such approval. Developer, at his own cost and expense, agrees to provide necessary assistance to the Utility in obtaining the approvals provided for herein. 31. Regardless of where executed, this Agreement shall be construed according to the laws of the State of Florida. 32. In the event that relocation of existing water and sewer utilities are necessary for the Developer, Developer will reimburse the Utility in full for such relocations. 33. The Utility shall, at all reasonable times and hours, have the right of inspection of Developer's internal lines and facilities. This provision shall be binding cn the successors and assigns of the Developer. 34. There shall be no liability whatsoever on the Utility for failure to deliver water service to Developer according to Developer's needs or schedules. This Agreement constitutes a promise of good faith and not a timetable for delivery of utility services. 35. Each party hereby agrees to grant such further assurances and provide such additional documents as may be required, each by the other, in order to carry out the terms, conditions and comply with the express intention of this Agreement. 36. The Developer will be invoiced for reimbursable expenses by the Utility. These expenses will include, but not be limited to, Utility Engineer expenses, secretary time, computer time, plan review and inspection fees. IN WITNESS WHEREOF, DEVELOPER AND THE UTILITY have executed or have caused this Agreement, with the named Exhibits attached, to be duly executed in several counterparts, each of which counterpart shall be considered an original executed copy of this Agreement. WI SSES: THE UTILITY: TEQUESTA WATER DEPARTMENT P. O. Box 3474 357 Tequesta Drive Tequesta, Florida 33469 M AA a2A V12 BY: Thomas G. B adford Village Manager 15 ORB 9 4 P9 106 D C Land Co., Ltd., Restaurant Site NAME OF PROJECT WITNESSES DEVELOPER: DC LAND COMPANY, LTD. a Florida limited partnership By: DIVOSTA LAND COMPANY, its genera partner Sy: c Its: OTTO B. DIVOSTA, PRESIDENT (Please Print /Type Name and Title JOINDER & CONSENT OF PROPERTY OWNER (If other than Develop (Please print /type name & title) MORTGAGEE JOINDER (if applicable) By: Its: (Please print /type name & title) By: Its: (Please print /type name & title) 16 4RE 5 427 N 107 D C Land Co., Ltd., Restaurant Site NAME OF PROJECT FOR UTILITY: STATE OF FLORIDA ss COUNTY OF PALM BEACH The foregoing instrument was acknowledged before me this a day of 199,6' , by Thomas G. Bradford, Village Manager on behalf of 1he Utility, who is personally known to me or has produced a drivers license as identification. JOANN MAN GANIELLO �Y °yak MY COMMISSION # CC 507143 EXPIRES: December 22, 1999 o Bonded Thm Notary Public Underwriters o t ary Publ i �a • a °° � My Commission Expires: State of Florlaa` a - , 1' x FOR DEVELOPER: STATE OF FLORIDA ` °•.;�' :A»�NN,,,N ss Its COUNTY OF PALM BEACH The oregoing instrument was acknowl edged e �ore me t s '.26 d4- day of 1 92& by Qvl — of aK a ersl ; 7/ s Go i corporation, on behalf of the corporation. je She is personally known to me R a s identi PRY PU OFFICIAL NOTARY SEAL c� e !� CHRISTINE SCALAMANDRE i * COMMISSION NUMBER Notary Public My Commission � �' M Y COMMISSION 7EXP. State of Florida at large " OF F\V AUG. 31 1998 FOR MORTGAGEE JOINDER: STATE OF FLORIDA ss COUNTY OF PALM BEACH The foregoing instrument was acknowledged before me this day of 19 , by of , a corporation, on behalf of the corporation. He /She is personally known to me or has produced a drivers license as identification. Notary Public My Commission Expires: State of Florida at large 17 ORB 9427 Pq 108 D C Land Co., Ltd., Restaurant Site NAME OF PROJECT FOR PROPERTY OWNER: STATE OF FLORIDA ss COUNTY OF PALM BEACH The foregoing instrument was acknowledged before me this day of 19 by of a corporation, on behalf of the corporation. He /She is personally known to me or has produced a drivers license as identification. Notary Public My Commission Expires: State of Florida at large 18 ORE. 9427 Pg 109 D C Land Co., Ltd., Restaurant Site NAME OF PROPERTY PROPERTY DESCRIPTION SEE ATTACHED SCHEDULE A WITNESSES: DEVELOPER: BY: 11 Otto B. DiVosta, President o EXHIBIT " A " 19 P8Ma -31 uw ;�� li et�n 'desun , ,!'e :1,N •, r,nl n 1 �uawn;,op �o ���I!���''- - r11 n I '�.'.1�a5 vlrr~�.�d0�3d _ b G7 C) d C 30 1 ON L33HS (9fZ-3-96 ON 801' S31ia3doad b'1S3(1b31 lNdanvLs3a S,AH18V3 •" US voOM Pm(Yrrn 03sodobd 7V031 30 H013NS I b i+JJn PuOOr] d7 03>']]NJ S9 :10+d 1 � �^ SOU I'Oad 9612/, ]ir0 021 " a .1 -3* , 09— NMw0 'a a TO. �(, }., 62 C' (� � 50/9 -cc (104) : 3NOHd 96ct )81 M „ V 1,� L 066 J laao 90+ff U 'HOV38 wlVd 153x1 'I'd 001 31In5 'OaVn31nOB 111H 153N0! 0581 16wddoly 1p 6u)fanlnS >Nowpuo 3Al2i0 V1S3f1b31 �- = 00 ObZ =b ,bL b'l nYO �O* W. 1 0'd 01 ,L9,LO.IO = �N n 6105 ON 31r]I3(la3] rG1a01J o ° "A g Y" ON aox3nars 1rNJ1553JOad ' 31 tl0 °-0°, 00042�0��00 �' ( - -) 96/11 /10 (( V� nrl 1 NO3 H 3 H 03dwv15 ONV O31V0 'G3N91S $$3 "] 0110 i. lON IlV ?9 NMOHS Vf JO ONV S3 T310N Ol 13 ? J3113B UNV 39031MOHM xw JO 1538 3xO 's'o'd H Ol 31 3a3H1 NOII 0 m y *s3 1 31vdnJ7v ONV 3I v SI NO3a3H ZO ' ]3 l 1 3M NV '53 Rl v1S ,...O, 'L20311 NO LL on OI " I VN S OIS390 O ! 9 - L OHV'I919 v7 NI Oj 135 V 3nan5 ONVI 1tlN01S - 33i JO iNin 3 N1 S133J 3H1 H 3 M ONV JIMOS3 IV 31 3H 131 1 ONV 3 5133w H]1 O 3$ OHV NOI1JItlJ5301V931 3H1 1tlH1 ONV HOISIAa3dI5 M N In i, ONn 30VM SVA M0383H 0391tl7530 AMdObd 3H1 30 (lJ N713NS ONV tl3N 1 O 2: O NO11MIS30 IV931 3H1 1VH1 AJI1U33 x93 NO/IVJIJ1183J S,a0x3na0S CJ CA \ n\ owr. i . xol r _ ip t- V I m I \ a, S NI ejS''1 \ =o f: - \ 0 1NvynV1S3a **w.+. w w a]s a 9N+ sH0un3n (,n n) m Cb a 0 (03SOdOHd) o a rui oo0v "N r rn un.o1. (+ _ z 0 y W \ O a , T< U 1 1T 901 YL,•Lt - �a ua aOUr (t m n $ a \ r C.:1 Nw.n3v aoov vn+ m. (c 1 -C U N \ G m Li L • ' NO a0p1, aTSW m5aeove (• - I Z OIJNTV Yuvlln JM' SONW.•y1101U0 Ti. 01N Z Q lV" r,,0(e0 S n YcrA 01 tS' 1n O,m1N 'Ynp vLSyWL O , .9 ,eObe' d n r•rvnum w HO.n a]s.9 ]a..amN H.p¢ sa.1N79 I < — 1 Y 1,J Z - 3 \ 2 ,0009 a> o 531OH S.arulan5 I SINV9 9NI1SIX3 Q O-NNIO3 30 1N10d 3H1 Ol 1 333 1S,O :3: `151 10 37NV 151(1 V I -z o.9o.0O nos 3703111 : 1 1331 21 60 10 3O ( LL LLl O / V - 1TV3 .61,15.01 H1 3J DNV CS ,I 33 NV 0 V .00,0.O 1510 0.01 H1n05 33 3H 1331 33 OS 1510 v '15431 0. 06 9 "Id NON HISN3 11162 10 37NV 1510 V 153M S3A ,1 e22 j 37 OH N3 H1 :1331 LB 3L JO H19N31 IV ONV ,1 O.IZ,91 x3tl 3153M 3nN11 NO7 JO J19NV lV lI ZII1. N3 3]Ntl 3n NI tl 11Dn 9(�ON '3ntlI7 0301tl7S 30 3NOJtl 301 _ _ C-) JO JtlI 301 9NOltl 37N3H1 3JN3H1 '9 010 01 0 3 0 JO 1NIOd I r / \ 301 Ol '133! 1L > JO H19N31 ]tltl NV ONtl LS.LOr10 JO 319Ntl IV 81N30 V f - - � '40 nO '3nan7 01tl5 JO 7atl 3111 9N01v A M 81`1 331 OO.011 1 L Sni d !0 TnlOVa v r111M '15v3H1nOS 3x1 Ol 3ntl IONOD 7007 3nan] tl !0 3anl tln an] f0 1N1 0d 3H1 ON130 OSIV 1NIOd OIVS '3n1a0 V1S3n031 JO 3NI1 AVM 30 1HOIN ` x 1tl3N1 tlON 3H1 NO 1NIOd V O1 1331 00 30 37NV 1510 tl153M - 90,62.00 1 '\ N / 0• .11tlON 37N3H1 '1331 65119 30 37NVISIO '3AIN0 V153n031 30 3NI'1a31037 3H1 Ir O ONO IV '153M ,11,01,69 H1nOS 3703H1 IS *ON OVON 31V1S) I'ON xVMH91H 'S I I I \� 10 3N11tl 31 N3J 3H3 ONV 3nItl0 V153n031 30 3NI la31N37 3H1 ltl 0N17N3rvW0] 1 TM011O! Stl \ :17$30 Altl Ntld 1, 304 90139 1)3",s O OINO ' OHIO] 0 HO 30 1d I C, ISV3 11 IONV)l )111111I5 111 m115NMO1 'Ot NOIl 103 J3S NI 9NI NIAI I 1 ONtl !0 378 O — N0I1dIdDS30 1V931 CS i rt o- - 9MA6Vd U-]SOdONcI co N I ,6" 1 ,00006 N ✓ - -- C1 TL., v Id 1.0N - 3 „00,0000£ S— ORB 9427 Fs 11 �. D C_Land Co., Ltd., Restaurant Site NAME OF PROJECT CONNECTION CHARGES The Developer agrees to pay, in order to induce the Utility to provide service, the following connection charges for the share of facilities. Said charges to be paid by Developer are those which are set forth in the Utility's Ordinances and uniform service policies. ITEM I PAYMENT SCHEDULE WATER: The following formula was used to determine Developer's share of Water Facility Charges. Total ERC's Charge Per ERC Total Charges No additional ERC's or related fees required for this restaurant. New building will use 1 metered service as provided to existing use. ITEM II WATER SYSTEM CONTRIBUTIONS The Developer shall install the following pipe, mains and appurtenances thereto and dedicate same to the Village. Said installations are to be in accordance with the approved plans drawn by Michael B. Schorah & Associates, Inc Drawing No. 95 -836 sheets 1 through 8 dated August 13, 1996. UTILITY COMPANY: DEVELOPER: By By: Thomas G. Bradford Village Manager Otto B. iVosta, President WIT SSES: WITNESSES: Ow,,,-, 62� OCAA EXHIBIT "B" 20 ORB 9427 Pg I I DOROTHY H. WILKENi CLERK; RB CWNT I`R FL D C Land Co. , Ltd. , Restaurant Site NAME OF PROJECT LOCATION MAP SEC. 30, TWP. 40S, RNG. 43E. MARTIN COUNTY COUNTY LINE RD \ 0 O o f � BLro \y s � o o PROJECT � ATFRYAY � OR & T S q 8 BE CH RD f Losatwtchee River Jupiter / Inlet �7 r' y WITNESSES: M ELOPE . Ot o B. iVos a, President EXHIBIT "C" RECORDER'`✓'ME7 Le c °" of document 21