HomeMy WebLinkAboutAgreement_General_06/09/2016 (3) Shenandaah Generai Construction Chanqe Order CHANGE ORDER No.1 Project :Miscellaneous Drainage improvements �wner ; Village of Tequesta Subcontractor : Shenandoah General Const�uction Job # : 1916 Additional charges for Slip lining open cut method under asphalt. Net Increase /(Decrease) of this Change �rder...... ...... $5,075.00 Change Order Descri tp ion Change Order Amount #107 Foreman SO.00x10 hrs= 500.00 '` - �;� ���� #110 Vac Truck 19Q.00xlOhrs=1900 �� ` #101 Track Excavator 125 x 10hrs= 1250.00 '' �,�,� #108 Labor 35AOx 40=140Q.00 x �° , : �},�� #1Q9 Air Compressor 25.00x1=25.00 �:� { �#� : _- X � '� � i.E ; -..�. .,. . - ,.._ .. ,.. .,, _:.,, ... -.- ...:... ... ..: :...... Totat...................................................................... $5,075.00 ,. . <. t = ` = , ...: - t ,. � �,� ,..- A , .:. . . ,._., -_, : _. ,_, . :.� All other Terms and Conditions of the Original Subcontract Remain Unchan.qed It is further understood and agreed that aii terms and conditions of said Contract as it may herebefore have been modified shall be and remain the same. This writing comprises the full and entire agreement between tfie parties affecting the wo�ic provided for herein. No other agreement or understanding of any nature conceming the same has been entered into or will be recognized. Contractor has made no inducements or representations to SubconVactor whatsoever except as expressely herein stated . No oral mod�cation of this Chartge Order has any force of effect. This Change Order authorization inciudes not only ali direCt costs of the subCOntractor such as iabar, material, job overhead, and profit marked but also inciudes all costs for modifications or changes in sequence of work to be perforrned, delays, rescheduling, disruptions, extended direct overhead and general overhead, acceleratian, material or other escalation which includes wages, and other impact costs. n Shenandoah Construction lfillage O# Tequesta By :�_ f��.« �� f.�„�� Date : 4/29/16 gX� ������ � P�L� `� / r / (�'� . Title : Project Manager Title : SI..�Eli AN�oAH p$��of2 CONSTRUCTION 1 R88 N.W . 22" Street • Pompano Beach, FL 330b9 (954) 975-OQ98 Faa: (954) 975-47t$ DATE: February O1, 2016 PROPOSAL #P1916 SUBMITTED TO: Tequesta, Willage of STREET: 136 Bridge Rd CITY, STATE & ZIP: Tec{uesta, FL 33469 PHONE: (561)575-6233 FAX: (561) 575-6245 EMAll.: sheady@tequesta.org JOB NAME: Miscellaneous Drainage Improvements A7`TENTION: Sam Heady We propose to furnish a crew and all necessary equipment to provide the following services, at the above mentianed job location. This work will be performed at our following hourly and/or unit prices: 56 Stip L'using 3U". �pe (A� l) (at $85 #1b:LF} 320 I.:F �2'�:209:(�} 81 C1PP 24" Pipe (19" x 30") (Area 5) (at $98.70 LF) 40 LF $3,948.00 81 CIPP 24" Pipe (20° x 26") (Area 6} (at $98.70 LF) 50 LF $4,935.00 20 Light Clean 30" Pipe (Area 1) (at $3.50 LF) 320 LF $1,120.00 17 Light Clean 24" Pipe (Area 5& 6) (at $2.25 LF) 90 LF $202.50 1 Storm Drain Video 0-48" (Area l, 5, & 6 pre and (at $4.00 LF) 820 LF $3,280.U0 post} 83 CIPP 30" Pipe (Area 2) (at $120.75 LF) SS LF $6,641.25 77 C1PP IS" Pipe (Area 2) (at $68.25 LF) l 10 LF $7,507.50 20 Light Clean 30" Pipe (Area 2) (at $3.50 LF) 55 LF $192.50 11 Light Clean I S" Pipe (Area 2} (at $2.Ofl LF) 110 LF $220.00 1 Stocm Urain Video 0-48° (Area 2 pre and post) (at $4.00 LF) 220 LF $880.00 &3 CiPP 30° Pipe (Area 3) (at $120.75 LF) 255 LF $30,791.25 79 CIPP 18" Pipe (Area 3) (at $78.75 LF) 50 LF $3,937.54 20 Light Clean 30" Pipe (Area 3) (at $3.50 LF) 255 LF $892.50 14 LigMt Clean 18" Pipe (Area 3) (at $2.25 LF} 50 LF $112.50 1 Storm Drain Video 0-48" (Area 3 pre and post)) (at $4.00 LF) 610 LF $2,440.00 76 C1PP IS" (12") (Area 4) {at $63.00 LF) 35 LF $2,205A4 83 C1PP 30" Pipe (Area4) (at $120.75 LF) 175 LF $21,131.25 11 Light Clean 15" Pipe (12") (Area 4) (at $2.00 LF) 35 LF $70.00 20 Light Clean 30" Pipe (Area 4) (at $3.50 LF) 175 LF $612.50 1 Storm Drain Video 0-48" (Area 4 Pre and Post)) (at $4.00 LF) 210 LF $840.Q0 Estimated Totai: $l � 9,l S9.2S This Proposal offers the piggy back of our current City of Wellington Contract No. 003-15/DZ This proposal may be withdrawn if not accepted within 30 days. Payment terms net 30 days. All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard practices. Price above is only an estimate of foreseen conditions. Unforeseen conditions can affect the amount of tnme to compleYe the work, therefore increasing or decreasing estimate. All agreements are contingent upon strikes, accidents or delays beyond our control. Unless noted above engineering, permits, testing and bonds are not included in the pricing. Owner is to carry fire, tornado and other necessary insurance. Our workers are fully covered by Workman\'s Compensation Cnsurance. Parties to this proposaUcontract expressly waive all tort claims against each other and limit their remedies to breach of contract. 1J1�1.:1���� \.l C7�� Pa9e 2of2 C4N5TRUCTIt)N l A88 N.W. 22 Street • Pompano Beach, FL 33064 (954) 975-0098 Faz: (954) 975-9718 SIGNATUEZE: SHENANDOAH GENERAL CONSTRUCTION CO. TITLE DATE Danny DiMura Estimator Q2/O1/2016 THE VILLAGE OF TEQUESTA PIGGYBACKING CHECKLIST Instructions: This form is to be completed for any purchase of goods, or contract for services where the Village will utilize a contract competitively bid by another governmental agency (i.e. "Piggyback"). Department: Stormwater Utilities Date: 1/29/2016 Item/Service Maintenance and repair services for storm drainage Infrastructure Vendor/Service Provider Shenandoah Generaf Construction Company � State Contract # �X Other Governmental Agency *Chapter 287, F.S. If piggybacking a State Contract please stop here. Narne of 6overnmental 1 Agency Village of Wellington YES NO Is the contract current? Effective date: 3/24/2015 Expiration � � 2 Date: 03/24/2018 � � 3 Was itemJservice bid out in compliance with the Village's Purchasing Policies & Procedures? Is the price that the Village will receive by piggybacking equal to the price obtained by the agency � � 4 named above? � � 5 Does the contract contain an assignability clause? If the answer to question # 5 is no, has the governmental agency given the Village permission to � � 6 piggyback on the contract? � � 7 Has the vendor/service given the Village permission to piggyback on the contract? Department Head Signature Date Shenandoah Construction, Inc. Public Records: In accordance with Sec. 119.0701, Florida Statutes, the Contractor must keep and maintain this Agreement and any other records associated therewith and that are associated with the performance of the work described in the Scope of Services. Upon request, the Contractar must provide the public with access to such records in accordance with access and cost requirements of Chapter 119, Flarida Statutes. Further, the Contractor shall ensure that any exempt or confidential records associated with this Agreement or associated with the performance of the work described in the Scope of Services are not disclosed except as authorized by law. Finally, the Contractor shali retain the records described in this paragraph throughout the performance of the work described in the Scope of Services, and at the conclusion of said work, transfer to the Village, at no cost to the Village, all such records in the possession of the Contractor and destroy any duplicates thereof. Records that are stored electronically must be transferred to the Village in a format that is compatible with the Village's information technology systems.