HomeMy WebLinkAboutMinutes_Workshop_07/21/2016 MINUTES
VILLAGE OF TEQUESTA
WORKSHOP July 21, 2016
%/'
r � :.�
��� r
��'
CALL TO ORDER AND ROLL CALL
The meeting was called to order at 7:30 a.m. A roll call was taken by Village Clerk, Lori
McWilliams. Present were: Mayor Abby Brennan, Vice Mayor Vince Arena, Council
Member Tom Paterno and Council Member Frank D'Ambra. Council Member Steve Okun
was absent.
APPROVALOFAGENDA
MOTION: Council Member D'Ambra moved approva/ of the agenda; seconded by Vice
Mayor Arena; motion carried unanimously 4-0.
1. Discussion Regarding FDOT US Highway One Corridor Plans
Mayor Brennan reminded Council that this meeting was a follow-up to the Village Council
Workshop they had recently attended on July 19, 2016, regarding the proposed Florida
Department of Transportation (FDOT) US Highway One corridor plans. She asked if
anyone had any thoughts or questions concerning the prior meeting. Council Member
Paterno stated that he had a problem with the plan as it gave the Village no dedicated
turn lanes on US Highway One, which he viewed as a safety issue. Council Member
D'Ambra reminded Council that the Florida Department of Transportation (FDOT) had
certain limitations within the design. He felt the Florida Department of Transportation
(FDOT) gave the Village as much as they were able to and believed the plan was a huge
improvement from the one submitted at the June workshop meeting. Vice Mayor Arena
added that the lane size reduction was a concern of his and asked about a possible speed
limit change. Council Member D'Ambra recalled that the Village could request to reduce
the speed limit. He understood the lane width concern, yet felt if it could not be adjusted,
it was still manageable. Mayor Brennan felt the speed limit may be able to be adjusted
and further revealed that the Jupiter Bridge project would be starting soon. She stated
that she never envisioned maintaining the current speed limit, but imagined a plan that
would capture the vision of a small village area, prompting traffic to naturally slow down.
Council Member Paterno emphasized that taking the speed limit down to 40 miles per
hour was unreasonable, considering five tanes would be reduced into only two lanes. He
continued to state that it would be expensive to remove the concrete curbing, should the
Village elect to make changes in the future. Council Member Paterno maintained that the
new plan was a major safety issue because of the lack of room for making turns and the
Viilage Council Workshop Minutes
July 21, 2016
Page 2
potential for traffic to become bottlenecked. Council Member D'Ambra reminded Council
that the Florida Department of Transportation (FDOT) designed roads all the time and did
the necessary safety studies. Council Member Paterno felt that Council was
concentrating on the businesses instead of the safety components of the plan. Council
Member D'Ambra responded by stating that his objective had always been to create a
roadway that was consistent in keeping with the character of the community. He
emphasized that he was not concerned about commuters that were speeding thru town,
but instead was concerned with creating a friendly road for the residents of Tequesta.
Council Member D'Ambra expressed that the project was about transforming the current
highway into a friendly thoroughfare instead of having an express-way running through
the middle of the Village.
Council Member Paterno expressed that he was not against the Beall's Outlet bump-out,
as it was a prime example of what should be done in certain situations. He was concerned
that the bump-out would push traffic into other lanes and pointed out that a five- foot bump-
out was substantial.
Council Member D'Ambra suggested the Village ask the Florida Department of
Transportation (FDOT) for modifications to the areas of concern instead of cancelling the
entire project.
Mayor Brennan revealed that she was surprised to recently learn that there had only been
five accidents along the US One and Village Boulevard intersection within the past several
years. She explained that it helped her to understand why the Florida Department of
Transportation (FDOT) would not incorporate a turn lane in the plan. Manager Couzzo
stated that the Village would be able to create a turn lane on its own as long as the Florida
Department of Transportation (FDOT) gave their consent.
Vice Mayor Arena conveyed that he understood Council Member Paterno's position on
the bump-out affecting vehicles turning as he had witnessed a similar situation personally.
Council Member D'Ambra felt Council could at least ask the Florida Department of
Transportation (FDOT) about reducing the size of the bump out.
Council Member Paterno relayed that he was not satisfied with the current plan but would
have a clear conscience as he had repeatedly voiced his concerns on the subject.
Mayor Brennan suggested Council ask the Florida Department of Transportation (FDOT)
for additional reflectors and striping at the intersection of Tequesta Drive and US Highway
One. She further informed Council that Father Chuck, Pastor at Saint Jude Catholic
Village Councii Workshop Minutes
July 21, 2016
Page 3
Church, had agreed to the Florida Department of Transportation (FDOT)
recommendations for the turn lane. Mayor Brennan asked Manager Couzzo to speak
with the Florida Department of Transportation (FDOT) about the bump out issue. She
shared with Council that the Jupiter Bridge would be closed for two years and would be
increased by 12 feet in height.
ADJOURNMENT: Council MemberD'Ambra moved to adjourn the meeting; seconded
Vice MayorArena. The motion to adjourn carried unanimously 4-0; therefore, the meeting
was adjourned at 8:26 a.m.
RespectFully submitted,
� � �-(, � ,
f L� t.�-C,�.��--
Lori McWilliams, MMC
Village Clerk
Note: These summary minutes are prepared in compliance with 286.011 F.S. and are �
not verbatim transcripts of the meeting. A verbatim audio record is available from the
office of the Village Clerk. All referenced attachments are on file in the Village Clerk's
office.