HomeMy WebLinkAboutOrders_Variances_08/10/2017_VAR 02-17_Extension_Bartl Real Estate, Inc. ORDER OF THE VILLAGE COUNCIL
VILLAGE OF TEQUESTA
CASE NO.: vAR-o2-1� FILED: �Ilage of Tequesta
Date: ' � '
IN RE: Bartl Real Estate, Inc., Owner/Applicant Time: ' ��Q�"
PROPERTY LOCATION:
U.S. Highway 1, Tequesta, FL 33469 (between Palm Ct., and Harbor Rd., S.)
LEGAL DESCRIPTION:
JUPITER HEIGHTS LTS 1 TO 9 INC & ABND 40 FT STRIP LYG W & ADJ
THERETO BLK 5
PARCEL CONTROL NUMBER:
60-43-40-30-02-005-0010
VARIANCES REQUESTED:
Variance from Sec. 78-143 to allow construction of a new four story office building
with a side setback of 20 feet where the code requires a side setback of 25 feet; and
Variance from Sec. 78-143 to allow construction of a new four story office building
with a rear setback of 10 feet where the code requires a rear setback of 15 feet; and
Variance from Sec. 78-691 to allow construction of a new four story office building
with seven of the required off-street parking spaces being a width of 9.5 feet
where the code requires all off-street parking spaces to have a minimum width of 10
feet; and
Variance from Sec. 78-696 to allow construction of a new four story office building
with a loading zone located in the front drive aisle where the code requires the
loading zone to be located outside of all designated drive aisles; and
Variance from Sec. 78-409 to allow construction of a new four story office building
with a one foot wide landscape buffer on a portion of the site between the parking
lot and the south side of the building where the code requires a four foot wide
landscape buffer.
ORDER GRANTING EXTENSION OF TIME FOR VARIANCE
This cause came on to be heard upon the above request for an extension of time and the
Village Council for the Village of Tequesta being duly advised, hereby finds as follows:
1. The Village Council approved the application for a variance in Case No. VAR-02-17
on March 9, 2017.
2. According to Section 78-68 of the Village of Tequesta Zoning Code, the variance
was set to expire within six months from the date of grant, unless a building permit
Page 1
based upon and incorporating the variance was issued within the six-month period
and construction had begun thereunder.
3. The applicant has made a written request for a six (6) month exCension of time of the
Order granting the variance application so that it will have time to obtain all
necessary permits and commence construction.
4. According to Section 78-68 of the Village of Tequesta Zoning Code, the Village
Council has the right, power and authority to grant the extension being requested by
the applicant.
5. In the judgment of the Village Council, the public convenience and welfare will best
be served by approving the request for an extension.
IT IS THEREUPON CONSIDERED, ORDERED AND ADJUDGED BY THE VILLAGE
COUNCIL OF THE VILLAGE OF TEQUESTA, FLORIDA, AS FOLLOWS:
The request for extension of time for Variance VAR-02-17, Bartl Real Estate, Inc., with
references to the property described herein, located in the Village of Tequesta, Palm Beach County,
Florida, to allow the applicant:
A six (6) month extension of time for the variance granted in Case No. VAR-02-
17; said extension of time to commence on September 9, 2017,
is HEREBY APPROVED in accordance with the Village Zoning Code. Each and every other
requirement and condition of the March 9, 2017 Order Granting Variance shall remain in full force
and effect.
DONE AND ORDERED THIS Ip DAY O GUST, 2017.
�a,o•�°`��11Q��F���T�F"Q��.,y, M YO ABI BRENNAN,
����Q,�?QPP�Rq�;�G�.,,,VILLAGE OF TEQUESTA
�i �(i � ;� � L �'ND�
LORi McWILLIAMS, MMC= ':INCORPORATED;� _
VILLAGE CLERK � �''•• �' :
� �;;�
� �E 4,1g.^pQ'.�°�.
�����„�OF F1-�P\',.
.
,,,,,,,���N�����N,,,,N
Pa�TC 2