Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutResolution_14-18_05/10/2018 RESOLUTION NO. 14-18
A RESOLUTION OF THE VILLAGE COUNCIL OF THE VILLAGE OF
TEQUESTA, FLORIDA,ADOPTING A REVISED BUILDING DEPARTMENT
FEE SCHEDULE AS PROVIDED BY CHAPTER 14, ARTICLE VI OF THE
VILLAGE CODE OF ORDINANCES;PROVIDING THAT THIS SCHEDULE OF
FEES AND CHARGES SHALL BE AVAILABLE FOR INSPECTION AT ALL
TIMES AT THE VILLAGE HALL DURING REGULAR BUSINESS HOURS;
PROVIDING FOR PUBLICATION OF THIS SCHEDULE OF FEES AND
CHARGES IN APPENDIX C. OF THE VILLAGE'S CODE OF ORDINANCES;
PROVIDING AN EFFECTIVE DATE; AND FOR OTHER PURPOSES.
WHEREAS, the Village Council of the Village of Tequesta, Florida, desires to adopt a
revised building department fee schedule for all building activities in the Village for the citizens of
the Village of Tequesta and for other members of the public; and
WHEREAS, the Village Council desires to provide for a waiver provision to allow the
Building Official,based on good cause shown by the applicant,to reduce or waive certain fees under
certain circumstances; and
WHEREAS,the Village Council desires to incorporate all such fees and charges adopted in
accordance with Chapter 14, Article VI of the Code of Ordinances into one comprehensive fee
schedule; and
WHEREAS,the Village Council desires to make certain the schedule of fees and charges is
available for inspection such that any member of the public may be aware of the cost of land
development activity within the Village.
NOW,THEREFORE,BE IT RESOLVED BY THE VILLAGE COUNCIL OF THE
VILLAGE OF TEQUESTA,PALM BEACH COUNTY,FLORIDA,AS FOLLOWS:
Section 1: The Village Council of the Village of Tequesta, Florida, hereby adopts the
revised Schedule of Fees and Charges attached hereto as E�ibit A and made part hereof as if fully
set forth herein.
Section 2: This duly adopted Schedule of Fees and Charges shall be available at the
Village Hall for inspection by the public during normal business hours,and shall further be published
in Appendix C of the Village's Code of Ordinances.
Section 3: This Resolution shall take effect immediately upon adoption.
Resolution 14-18 EXHIBIT A
APPENDIX C - PERMIT FEES
(A) BUILDING PERMIT FEES:
1. Application fee: ..... $75.00
The application fee is nonrefundable and is in addition ad�#e�to the permit fee.
A state surcharge of one and one half##�ee percent (or$2.00, whichever is morel
shall also be assessed to #e� each permit issued. The state surcharqe is
nonrefundable and is in addition to the permit fee; . See F.S.
§ 553.721 .
2. Building permit applicants for new or replacement commercial buildings, new or
replacement multi-family buildings and new or replacement duplexes shall pay a
nonrefundable $3,000.00 fee at the time of filing for a building permit.
Building permit applicants for new or replacement conventional single-family
residence shall pay a non-refundable $1 ,500.00 fee at the time of filing for a
building permit.
Building permit applicants for new or replacement modular homes shall pay a
non-refundable $750.00 fee at the time of filing for a building permit.
Buildina Permit aqplicants for new or replacement modular office/commercial
buildinas shall pav a non-refundable $1,500.00 fee at the time of filina for a
buildina permit .
3. Master permit fees shall be two percent of the valuation unless a fixed fee is listed
herein. "Valuation" shall be based upon all project material costs whether
furnished by the contractor or separately by the owner, direct and indirect labor
costs, design professional service costs, and reasonable profit.
"Valuation" shall be considered the greater denomination of either:
A. The notarized contract between the contractor and the owner of such
property or building; or
B. The valuation method as determined by the International Building Code
(IBC) Section 109.3.
Subcontractors working under a master permit shall be issued a no fee permit to
complete their work if the master permit issued included their proposal, the
nonrefundable application fee of$75.00 will be required. Subcontractors applying
for "stand alone" permits shall be required to provide the required construction
plans and documents. A non-refundable �+� application fee of $75.00 will
be required.
4. Permit fees based upon valuation shall be collected to construct, enlarge, alter,
repair, move, demolish, or change the occupancy of a building or structure, or to
erect, install, enlarge, alter, repair, remove, convert or replace any required
impact-resistant coverings, electrical, gas, mechanical, plumbing system, fire
protection system, accessible, or flood resistant site element, the installation of
which is regulated by the Florida Building Code and Florida Fire Prevention Code,
or to cause any such work to be done, shall first make application to the building
official and obtain the required permit.
Work requiring �# a permit includes, but is not be limited to, the following
examples.
New structures Seawalls/dune walk- Air conditioners
overs
Renovation and demolition Docks/boat lifts/davits Heat pumps/pool heaters
dditions and sunrooms Land fifing and grading Fire protection systems and
alarms
ccessory structures Land clearing and tree Refrigeration systems
azebos/sheds removal
Moving buildings Signs, new or modified Gas equipment, tanks, and
p�p�n9
Flatwork and decks on rade Re air of existin si ns Gutter or downspouts
Seal coating of parking lot Landscaping and French drains, pipe drains
li htin
Re-striping of parking lot and Lawn irrigation systems Awnings or canopies, tents
DA access
Miscellaneous construction Plumbing installations Commercial exhaust vents
and hoods
State approved modular units Plumbing repairs Solar water heaters and pool
setup heaters
Foundations for modular units Sewer/drainage and Electrical installations and
taps repairs
Drivewa s, atios, and sidewalks Storm draina e lines Senrice Panel chan es
Fences and walls; flagpoles over Water heaters and Interior and exterior lighting
0 feet boilers and poles
Roofing (repairs and new roofs) Water mains and Generators and transfer
rotection switches
Hurricane protection and Swimming pools and Transformers and vehicle
shutters Barriers protection
Floodproofing panels and flood Fountains, spa and hot Fire sprinkler and alarm
ents tubs s stem
Retaining or rip rap walls Screen Elevators and platform lifts
enclosures/lanais
indow/door removal and Water features and Dumbwaiters, chairlifts
replacement fountains
aterproofing of areas Tanks (all types) Utility work and public right-
of-way
5. Plan reviews-fees:
A non-refundable plan review fee and shop drawing fee equivalent to $0.00125
times the valuation will #� be added to the �„s;+" +"�� permit fee;$8.^- ^�
4imec tho �ro1���4inr�
• Pre-submittal plan review fee—$150.00 (non-refundable) m�n�m��m foo plus
$50.00 per hour or portion thereof.
• Stamp extra "job copy" fee—$25.00 (non-refundable).
A $50.00 minimum application fee shall be due upon submittal. Each subsequent
plan review after the third plan review rejected for a previously noted violation
shall be charged at four times the normal fee per F.S. § 553.80 (2)(b). Plans
drawn by a licensed subcontractor, when not required to be drawn by a licensed
architect or engineer, shall include the contractor's name, company name,
business address, and license number per F.S. § 553.70.
6. Fixed fees:
Valuation system shall not be used if a fixed fee is set below.
Certificate of occupancy � or Certificate of completion C{ OC1..... $0.00
(included in permit fee �+se�)
Temporary CO residential..... $50.00
Temporary CO or COC commercial and multi-family..... $150.00
Stocking Permit (no employee hiring or training activities allowed without
temporary CO)..... $200.00
Temporary electrical service or power pole..... $125.00
Temporary construction trailer..... $200.00
Temporary sales trailer removal required before certificate of occupancy will be
issued, annual fee..... $200.00
Change of contractor..... $75.00
Tents/canopies/membrane structures (temporary only—Three-day maximum).....
$50.00
FEMA trailers (during a declared disaster only), each..... $150.00
Pfans revision fee (for substantially revised plans): Flat fee..... $75.00
Plans revision fee (for minor revisions to plans): Flat fee..... $45.00
Lost permit card or lost plans fee..... $40.00
Additional sign fees (Villaae Code Sec.78-736) First electrical connection.....
$60.00_ Each additional connection (Villaae Code Sec.78-736)..... $30.00
7. Doina work without a permit; After-the-fact fees.
After the fact permit fees for work done without benefit of a permit will be Dr,— ��
�r .,�+or +ho f,,.+ r�ormi�e� ,. ,n ho assessed to each category of permit includina
building, plumbing, electrical, mechanical, gas, and roofing, at triple the regular
permit fee.
8. Permit extensions (active permits only).
Extension of a permit if no new codes are in effect..... $75.00
Extension of a permit if new codes are in effect..... One percent of valuation.
A. a-- Permit extensions shall not exceed a maximum of 90 days each m����.
B. � Demolition permits may be extended only once, and for a period not to
exceed 30 days.
C. �: Extensions shall be requested in writing by the permit applicant and shall
demonstrate justifiable cause to the satisfaction of the Buildina Offi�ial.
Archived plan retrieval fee $25.00 per request, copies priced per F.S. §
119.07(1}(a}.
If a permit expires, renewal of the expired permit shall require the payment of the
full permit fee in effect at the time of renewal. Subject to the approval of the
Building Official, one or more, not to exceed four, requests for permit extensions
can be made prior to the expiration of a permit. However, in no event shall
extensions be granted by the Building Official on projects which have received
variances, special exceptions, and site plan reviews which have otherwise lapsed
pursuant to Villaae Code Chapter 78.
9. Inspections:
Reinspection fees for rejection of work due to faulty construction, work not ready,
failure to call for inspection, work covered up, work not per plans, and/or no
access (lifts/ladders) to jobsite:
Flat fee..... $100.00
Required inspections are included within regular building permit fees.
Partial inspections, each; must be paid prior to any further inspections being
scheduled..... $50.00
Special (courtesy) inspections where no permit fee has been generated.....
$50.00
After hour inspections, per hour; two-hour minimum..... $75.00
After an initial inspection and one subsequent reinspection for the same code
violation specifically and continuously noted in each rejection, each subsequent
reinspection shall be $400.00 each per F.S. § 553.80(2)(c).
10. Refund policy_
Requests for refunds of permit fees paid must be submitted within 30 days of the
date of issuance of the permit. There shall be no refunds of the plan submittal
and review fee paid at the time of application for permit. There shall be no refunds
once work has commenced. Items desianated as nonrefundable in this fee
schedule are not eliaible for anv refund. Items eligible for refunds ��will
be refunded at 50%.
11. Emergency work:
Where equipment replacements and repairs must be performed in an emergency
situation, the permit application shall be submitted within the next working
business day to the Building Official, without triale �et�le fee.
12. Permit fee reduction or waiver for aood cause:
The Buildina Official is authorized. on a case bv case basis. to reduce or waive
permit fees in his sole discretion for aood cause shown: each reauest shall be
considered on its own merit and iustification for anv reduction or waiver shall be
properlv documented. In no case shall fees be reduced or waived to the extent
that the Villaae's actual costs are not captured.
(B) FLOODPLAIN DEVELOPMENT FEES:
[These fees shall remain in full force and effect as previously adopted]
RESOLUTION Date
,�
14-18 OS/10/2018
Motion Council Member Vince Arena Second Council Member Laurie Brandon
VOTE
FOR ADOPTION AGAINST ADOPTION ABSENT
Mayor Abigail Brennan ✓� � �
Vice-Mayor Tom Paterno � � �
Council Member Vince Arena � � �
Council Member Laurie Brandon � � �
Council Member Kristi Johnson � � �
The Mayor thereupon declared the Resolution duly passed and adopted.
MAYOR OF TEQUESTA ATTEST:
,�,,,,,,,��E������F,,,,,
T"'''"
i �.��,�,GpRPp,9,9 4jG�,
/ � � `�.� ��'.
���?' � ��� t_�>i�C Lc.G7m� :/ ���C �'n�
, . Nr,._ '--�_
A igail�3rennan Lori McWilliams, MMC ,N��" RpORqrFO.;'A=
' Village Clerk ;�'•�ti �
°,,,,�,c,���4� 19�..QP"\,,s°�,,:
���,,,,,,,,,�,�,��R`,,,,,,,.