HomeMy WebLinkAboutMinutes_Planning and Zoning_06/15/2017 MINUTES
VILLAGE OF TEQUESTA
PLANNING AND ZONING June 15, 2017
BOARD MEETING 4
,
CALL TO ORDER AND ROLL CALL
The meeting was called to order at 5:35 p.m. by Board Chair Janet Strand. A roll call was
taken by Community Development Planner, Lance Lilly. Present were: Board Chair Janet
Strand, Board Member Elizabeth Schauer, Board Member Michael Schmidt, Board
Member Ashley Warren, Alternate Member Leslee Dasher and Alternate Member Theresa
Maggio. Also present were Village Attorney Amity Barnard and Community Development
Director Nilsa Zacarias. Vice Chair Steve Eagen was absent.
APPROVAL OF AGENDA
MOTION: Board Member Elizabeth Schauer moved approval of the agenda; seconded by
Alternate Member Ashley Warren; motion carried unanimously 5-0.
1. Approval of Previous Meeting Minutes
MOT/ON: Board Member Elizabeth Schauer moved approval of the minutes; seconded by
Alternate Member Leslee Dasher; motion carried unanimously 5-0.
2. SPM 04-17
Application from 236 US Highway One LLC for a site plan modification to paint
exterior building, add gable roofing with decorative brackets to the front
elevation, replace windows and doors, and improve landscaping. The proposed
application includes painting the existing monument sign to match current color
and installing a new wall sign. The address of the property is 236 US Highway
One, Tequesta, Florida 33469.
Village Attorney Amity Barnard swore in two people regarding this item. No ex-parte
communication was disclosed by the Board Members. Niki Norton thanked Lance Lilly and
Nilsa Zacarias for their extreme helpfulness with this process. SPM 04-17 was opened for
public comment but there was none.
MOTION: Board Member Elizabeth Schauer moved approval of SPM 04-17; seconded by
Alternate Member Leslee Dasher; motion carried unanimously 5-0.
3. SPR 05-17
Application from John J. Walsh Jr. & Maria A. Walsh for a site plan modification
to replace a kitchen door and side light with high-impact windows and to replace
the entry door and side light with a new impact door. The proposed wall color
Minutes—Planning and Zoning 0611 5120 1 7
Page 2
will match the existing buiiding color. The address of the property is 325 Beach
Road, Unit 1 Q7, Tequesta, Florida 33469.
After the quasi-judicial nature of the hearing was announced by Village Attorney Barnard,
she swore in one person. No ex-parte communication was d'rsclosed by the Board
Members. Chair Janet Strand opened the item to the Board for discussion and after a
comment from the board about the fiamiliarity of the project; Board Member Elizabeth
Schauer asked Community Development Director Nilsa Zacarias whether simi(ar projects
in the same condominium complex could be reviewed as a group rather than individually.
Ms. Zacarias stated that the preference was to handle these type of changes as a blanket
request (as in the past) but the time limit on it had expired. Owner, Beth Keys advised she
was told by the Association that each unit owner would have ta proceed individua[ly. SPM
5-17 was opened for public comment but there was none.
MOTION: Board Member Elizabeth Schauer moved approva/ of SPM 05-17; seconded by
Board Member Michael Schmidt; motion carried unanimous/y 5-0.
4. SPR 03-1?
Application of Bartl Rea1 Estafie Inc. for a site plar� review to build a four {4} level
15,29fi sq. ft. office building. The application includes a landscaping plan, one
(i} monument sign, and other site improvements on the parcel. The property is
located on U5 Highway 1 between Palm Court and Harbor Raad South in
Tequesta, Florida, 33469. The legal descriptian for the property is JUPITER
HEIGHTS L.T� 1 TO 9 INC & ABND 40 FT STRIP LYG W & ADJ THERETO
BLK 5. The Parcel Control Number #or the properiy is fi0-43-4Q-30-42-OQ5-
4010.
Village Attorney Barnard explained this item was quasi-judicial and swore in several
people. She asked the Board to disclose any ex-parte cammunication and Board Member
Elizabeth Schauer announced that she had received notice that this application was
coming forward but that was all. Attorney Barnard reminded the public of the parameters
for speaking during this proceeding.
Community Developmen# Director Nilsa Zacarias gave an overview af this item, which
included a graphic of its progression through the review and approval process.
Gertified Planner and Project Agent Michael Sanchez presented the project and explained
that the owner was out-growing his two business locations on Northlake Boulevard in Palm
Beach Gardens, therefore purchased this praperty an which to build an administrative
office building. He noted that there was an eight to nine foot elevation drop between the
firont and rear af the lot and that a very similar project had been approved in 2005. Mr.
Sanchez showed renderings and gave details about the elevatian, exterior, parking,
drainage and landscaping. He clased by stating that this was not a develaper but an end-
user and that was more compatible with the surraundings than other uses approved for
that zone.
Minutes—Planning and Zoning 4611512017
Page 3
Remarks from the Board were regarding the modern laok of the building. Mr. Sanchez
confirmed for Chair Janet Strand that equipment such as air conditioning located on the
raof would not be visible from the street; he also described the retracting glass roof-
access hatch as noted in the plans. Tequesta Fire Chief Joel Medina responded to
�lizabeth Schauer's inquiry as to whether Fire Department would be able to access the
third f�oor by stating that the Fire Departmen� made recommendations and it was easy to
work with the applicant who had done every#hing #hey had suggested,
SPR 03-17 was apened for public comment.
Thase who spake were Frank Sardina of 3433 Harbor Raad South; Frank Sardina III af
1111 SW First Avenue, Miami; Phil Babbit of 3447 Palm Caurt; and Joshua McManus of
3417 Harbor Road South. They noted that Palm Beach County owned the a#ley separating
this property from the adjoining residential area and felt that the owner had not attempted
to work with neighbors at all, nor did they feel they received adequate communication from
Village Council. They expressed concern that the project was too big and the setbacks taa
small; the buffer between residential and commercial areas was being obliterated; the
planned driveway was on the side street instead of U.�. Highway 1 and they were worried
about traffic; alleyway flooding and drainage; and water, sediment and debris runoff to
r�eighboring properties,
Board Member Elizabeth Schauer asked whether an entrance on U.�. Highway 1 was
passible however, Mr. Sanchez explained that the lat was nat wide enough ta
accommodate the Florida Department of Transportatian requirements far a driveway. In
addition, according ta Mr. Sanchez the plans already considered the future U.S. Highway 1
lane reduc#ion as depicted in one of the renderings.
SPR 03-17 was closed #or public comment. Attorney Barnard remir�ded the B�ard that
they were allowed to recommend conditions to the plans if they desired and Community
Development Director Zacarias painted out an example of one from th� staff report.
Michael Schmidt inquired of Ms. Zacarias about ownership of the alley. She confirmed
that the al[ey is a public way lacated in Palm Beach County and reported that in 2005, it
was highly recommended that the alley be annexed inta the Village of Tequesta. When
Board Member Schauer asked about the effects of starm water in the alleyway, Civil
Engineer Spencer Schroeder, P.E. of Mock Roos and Associates, Inc. pointed out
proposed grating in alley and stated that all runoff wauld be contained and treated in
exfiltration trenches. He further explained that there were two exfiltration systems, one on
the property (within The Village) and a separate one in the alley (outside The Village).
According to Mr. �chroeder, exfiltratian trench calculatians based on soil type, trench
length and undergraund flo�nr would far exceed the Village's requiremer►ts. 5ince this plan
was larger than the plan approved in 2405, Board Member Warren asked whether it was
passible to reduce the size of the building but Mr. Sanchez stated that this is the size
building his client needs.
Mr. Schroeder assured that this project would not affec# water flow on the roadways ta
either side of it as what came down the roads was from U.S. Highway 1 artc� not from this
Minutes —Planning and Zoning 06/15/2017
Page 4
property. Furthermore, the grading plan showed the runoff path tilted inward; to develop or
not develop the lot made no difference in water runoff to neighboring properties.
The matter was closed for public comment and opened to the board. Attorney Barnard
reminded the Board that they were the recommending body and advised them to be as
specific as possible. Board Member Schauer recalled that the residents of Harbor Road
South and Palm Court refused annexation into the Village years ago and while she
understood the issues these neighbors raised, the Board represented the Village of
Tequesta residents.
MOTION: Board Member Elizabeth Schauer recommended moving approva/ of SPR 03-
17; seconded by First Alternate Leslee Dasher; motion carried 3-2 with Michael Schmidt
and Ashley Warren opposed.
STAFF COMMENTS
There were none.
PUBLIC COMMENTS:
There were none.
BOARD COMMENTS
There were none.
ADJOURNMENT: Board Member Elizabeth Schauer moved to adjourn the meeting;
seconded by Alternate Member Les/ee Dasher; the motion to adjourn carried unanimously
5-0; therefore, the meeting was adjourned at 6:54 P.M.
Respectfully submitted,
�� ����
Lori McWilliams, MMC
Village Clerk
Note: These summary minutes are prepared in compliance with 286.011 F.S. and are not
verbatim transcripts of the meeting. A verbatim audio record is available from the Office of
the Village Clerk. All reference attachments are on file in the Village Clerk's Office.