May 14, 2018
Via U.S. Mail and Certified Mail, Retum Receipt Requested
7013 2630 0000 4758 0444
DaRell D. Pastuch
391 Riverside Drive
Tequesta, FL 33469
Re: Village of Tequesta Sidewalk Replacement Project; Response to Com-
plaints Raised
Dear Mr. Pastuch:
I am in receipt of your several e-mails to the Village of Tequesta, including public
records requests, regarding the above referenced matter. I have consulted with various
Village personnel involved with the sidewalk replacement project and the following is the
Village's position on the matter and response to your correspondences on the topic:
In September, 2017, with the approval and adoption of the 2017/2018 budget via
Resolution 45-17, the Village Council authorized the expenditure of funds for the
Sidewalk Replacement Project.
The Sidewalk Replacement Project was competitively bid in September, 2017 via
RFP No. PW03-17. Pursuant to the RFP process, R&D Paving was determined to be
tne proposer that best served the Vilfage's interests and needs.
On September 20, 2017 the Village awarded the contract for performance of the
Sidewalk Replacement Project to R�D Paving, the contract was approved by the Village
Council and on October 12, 2017 was executed by the Mayor.
Between the months of October, 2017 and April, 2018, the Sidewalk Replace-
ment Proje�t Work was performed by R&D Paving. As various aspects of the project
were peRnitted through the Building Department, they w ere also inspected and deter-
mined to be in compliance with the applicable requirements of the Florida Building
Code.
701 Northpoint Parkway, Si�ite 205,West Palm Beach, FL 33407 � p 561-586-7116 �f 561-586-9611
wu�co.davisashtonlaw.com �`��I V
0
♦LEADING EXPERTS IN LOCAL GOVERNMENT LAW AND ETHICS♦ ��,n_I,., ,•�
� C]W
��J J�l.C�t/�
1
J May 14,2018
Village of Tequesta Sidewalk Replacement Projecf;Response tn Complaints Raised
As the documentation which establishes the above facts reveals, the Sidewalk
Replacement Project was properly budgeted and was approved to be implemented by
the Village Council; the project was competitively bid and the contractor was selected in
accordance with Village procurement requirements; the work was performed in accord-
ance with industry best practices; upon permitting and inspection by licensed inspec-
tors, the work was determined to meet applicable Florida Building Code requirements.
Although we have reviewed your numerous complaints, it is the Village's position that
they are unfounded, and that the sidewalk replacement project is a success. There is
no question that the new concrete sidewalks are a vast improvement over the old
asphalt sidewalks and wil{ be an asset to the Village for many years to come. Be
advised that the Village of Tequesta, having addressed your complaints and having
responded to your public records requests, now considers this matter closed. You
should not expect any further response from the Village of Tequesta related to the
sidevralk replacernent projec:.
Si .� ly,
.� ��---
, �,
/J �•
�`Keit . , sq--
General Counsel
cc: Michael Cou�o, Village Manage�
Jose Rodriguez, Building Official
Doug Chambers, Pubtic Works Department Director
Gus Medina, Chief of Police
John Carey, Palm Beach County Inspector General
2
R
r
Engineer. Large boulders and other obstructions shall be removed to a minimum depth
of 6-inches bebw the finished subgrade elevation,and the space shall be backfilled with
sand, base course material or other material or suitable material which shall be
thoroughly compacted by rolling or tamping.
• The subgrade shall be accurately trimmed to the required elevation with a Y-inch
tolerance. High areas shall be trimmed to proper elevation. Low areas may be filled with
suitable material and compacted to the specified density or filled with concrete
integrally with the placing of the pavement.
• (2)Setting Forms:The forms shall be accurately set to line and grade and such that they
rest firmly,throughout their entire length upon the compacted subgrade surface. Forms
shall be joined neatly and tightty and braced to resist the pressure of the concrete and
the finished operations. The alignment and grade of all forms shall be approved before
and immediately prior to the placing of concrete.
• (3) Slipforming: The slipforming method will be allowed, provided that an acceptable
finished product,true to line,grade,and cross section is consistently produced.
• (4) Mixing Concrete: Concrete shall be mixed in accordance with the requirement of
Section 03000.
c. Installation
(1) Placing concrete:
• The concrete shall be distributed on the subgrade to such depth that, when it is
consolidated and finished,the thickness required by the drawings will be obtained at all
points and the surface will at no point be below the grade specified for the finished
surface.The concrete shall be deposited on the subgrade in a manner which will require
as little �ehandling as possible. Placing of the concrete shall be continuous between
transverse joints,without the use of intermediate bulkheads.
• Reinforcement shall be placed and maintained at this location during the placing and
finishing operation.
• Concrete shall be thoroughly consolidated against and along the faces of all forms by
means of vibrators. Vibrators shall not be permitted to come in contact with the
subgrade or a side form. �bration at any one location shall not continue so long as to
produce puddling or the accumulation of excessive grout on the surface. In no case shall
the vibrator be operated longer than 15 seconds in any one location.
(2) Striking-off, Consolidating and Finishing Concrete: Immediately after the placing, the concrete
shall be stuck off, consolidated and finished, to produce a finished product conforming to the
existing area and or required by the drawings,Specifications and Instructions.
(3) Straightening and Surface Corrections: After floating has been completed and the excess water
removed, but while the concrete is still in a plastic state, the surFace of the concrete shall be
tested for trueness with an accurate 10-foot st�aightedge.The straightedge shall be furnished by
the Contractor.The straightedge shall be held in successive positions parallel to the walk center
line,in contact with the surface,and the whole area tested from the side of the slab to the other
as necessary.The advance along the walk shall be in successive stages of not more than one-half
the length of the straightedge. Any depressions shall be immediately filled with freshly mixed
15
\
SIDEWAIK REPLACEMENT PROGRAM
BID FORM Schedule A
Filing for 1 permit ti��iil be required at the Cont�actors cost. The permit �vill cover the entire sidewalk
replacement program.
Proposai A
Demolition, rernoval, disposal and repiacement of four inch (4"} concrete sidewalk per square foot per
location, including installation and/or removal of sand, dirt, tree roots or any obst�uction as needed to
meet grade.Back filling with clean fifl dirt and remova!of�r�aod forms is required.
� • I 'rJ PER SQ FOOT Unit Price Figures
Proposal B
Demolition, removal, disposal and replacement of six inch (6") concrete driveway aprons a�d/or
sidewalks per square foot {ocation, including inst'aliation and/o�the removal of sand, dirt,t�ee roots or
any obstruction as needed to meet grade. Back filling �:�ith clean fill dirt, removal of forms and
restoration of area is required.
� � 5 Q PER SQ FOOT Unit Price Figure
Proposal C
Cvnstruction of new 4 inch{4")concrete side4valk per square foot location,including excavation,grading
and/or the removal of sand,dirt,tree roots or any obstruction as needed to meet grade.Back filling wrth
clean fiil dirt,removal of forms and restoration of area is required.
�� � 1• .1� PER SQ FOOT Unit Price Figures
Proposa!D
Construction of new 6 inch (6") concrete sidewalk/driveway per square foot location, includi�g
excavation, grading andJor the removal of sand, dirt, tree roots or any obstruction as needed to meet
grade. Back filling with clean fill dirt,�emoval of forms and restoration of area is required.
� � �' �C PER SQ FOOT Unit P�ice Figures
Proposal E
Demolition, removal, disposal a�d replacement of four inch (4"j asphalt sidewalk per square foot per
tocation, including insta{tation a�d/or removal of sand, dirt, tree roots or any abstructie.^. �� .^.^^a^a i^
meet grade.Back ftlling with clean fitl dirt and removal of wood forms is required.
� � r • s � PER 54 FOOT Unit Price Figures
II
�
Bt0 FORM Schedule A(Co�tinued)
Propasal F
Demolition, removal, disposal and replacement of six inch (5"} asphalt driveway aprons and/or
sidewiatks per square foot location, including instatlation and/or the removal of sand, di�t, tree roots or
any obstruction as needed to mezt grade. Back filling �vith clean fill dirt, removal of forms and
restoration of area is required.
� � � • � 5 pER 54 F00T Unit Price Figure
Proposal G
Construction of new 4 inch (4") Asphaft sidewalk per square foot location, including excavation,gradirig
and/or the removal af sand,dirt,tree roots or any obstruction as needed to meet grade.Back filting with
ciean fill dirt,removal of forms and restoration of area is reauired.
� � 5 • 5 � PER SQ FOOT Unit Price Figures
Proposal H
Construction of new 6 inch (6") Asphaft sidewalk/driveway per square foot location, including
excavation, grading and/or the removal of sand, dirt, tree roots o�any obstruction as needed to meet
grade. Back fifling with clean fill dirt,remova{of forms and restoration of area is required.
� � �' ! 5 PER SQ FOOT Unit Price Figures
/�dditio�al tnformation:
12
� � Print Page 1 of 2
Subje�ct: Fwd: Sidewalk Tequesta Dr.
From: Tom Patemo(tpatemo@tequesta.org)
To: dpastuch@belisouth.net;
Date: Wednesday,April 25, 2018 1:09 PM
Attachments availabie until May 25. 2Q18
I thought you would like to receive this emaii.
Thanks.
Thomas Patemo
tpaterno@teG�,�est�.oro
954-683-7679
Think Big,�n Big�
Begin forwarded message:
From: Debra Teifrin <dteifrin@tequesta.org>
Subject: Sidewalk Tequesta Dr.
Date: April 19, 2018 at 12:26:26 PM EDT
To: Abby Brennan <abrennan@tequesta.org>, Kristi Johnson
<kjohnson@tequesta.org>, Laurie Brandon <ibrandon@tequesta.org>, Tom
Patemo <tpaterno@tequesta.org>, "Vince Areana (AOL)"
<finchaser50 a�aoi.c�m>, Vince Arena <varena@��questa.org>
Cc: Debra Telfrin <dteffrin c�tequesta.org>, Michael Couzzo
<mcouzzo@tequesta.org>, Jose Rodriguez <jrodriguez@tequesta.org>, Lori
McWilliams <Imcvrrilfiams�a tequesta.org>
Good afternoon,
At the request of the Manager the email below and attachments above are forwarded for
your review.
Thank you,
Debra A. Telfrin
Executive Assistant
561-768-0465
Mr.Couzzo:
You have requested information regarding the above-referenced Permits for the Sidewalk
Rehabilitation and Construction project located on the south sideof Tequesta Drive between Seabrook
Road and Country Club Drive (the Project). The above-referenced permits(the
Permits) have been issued and
https://mail.yahoo.com/neo/launch?.src=ym&reason=myc 5/25/2018
�
f Print Page 2 of 2
finalized as they are in accordance with the contractual requirements as well as the Florida Building
Code.
The contractor for the Project, R&D Paving LLC, was chosen by a Request for Proposal (RFP)
committee review. A signed contract was provided as partof the RFP review which detailed the Project
requirements, including the width and depth of the paving concrete.
On April l8, 2018, a final inspection ofthe Project was performed by me in my capacity as
Building O�cial for the Village of Tequesta.
I inspected 15 different areas of the Project to verify the
concrete depth, as documented in the attached photographs. I verified that the sidewalk is at least4
inches thick and the concrete in the driveways are at least 6 inches thick. Accordingly,the
Permits have been issued for the Project.
Attached,for your review, is a copy of the Permits and supporting documentation,the
inspection photographs and the contract.
Please let me know ifyou need anything additional on this.
Regards,
Thank You
Jose Rodriguez, BCA
Building Official
34� Tet�uesta Drive
Tequesta Florida 33469
561-768-0511
�`�v'tC t0 �10`�vf��G�{�� Gii�;K i0 E10��1�iilGc:t;
RD Paving LLC-Contract.pdf Inspection Photoqraphs.pdf
3.7 MB 31.4 MB
Cl�c�: t� �c�:n�o�:d
Permits and Supporting Documentation.pdf
9.9 MB
This email has been scanned for email related threats and delivered safely by Mimecast.
For more information please visit http:/lwww.mimecast.com
https://mail.yahoo.com/neo/launch?.src=ym&reason=myc 5/25/2018
}
�� 0
Purchase Order
vi�of req�
. 345 Tequesta Drive • • o - a o�'� •-� - i = � a
� Tequesta,FL 33469 18-000900 18-000100 10/312017 01348
� -
-{ o
._ '
VENDOR ADDRESS: SHIP TO:
01348 �
R 8�D PAVING LLC Doug Chambers
400 EXECUTNE CENTER DR
SUfI'E 210 �
WEST PALM BEACH,FL 3:i401 ,
� ORDERED BY PRICE SOURCE DEPARTlAENT
DOUG CNAMBERS" CONTRACT " •PW
�O DESCRIPTION: S[DEWALK IMPROVEMENT-SOUTH S[DE OF TEQUESTA DR.FROM SEABROOK RD.TO RNERS
QUANTITY DESCRIPTION'• UNIT PRlCE AMOUNT
9 SmEWALiC11�ROVElIIEt�'fS 7b'3,687.50 163,687.5D
301-210-663.652 Pathway/SideMralk Impnrnre�neNs 163,667.50
NET TOTAl: 163,687.50
VILLAGE OF TEQUESTA
� PURCHASlNG DATE
CONTINUATION SHEET
AtA DOCUMENT 0703 Pa 2 ot 2
qlA Document G7Q2,APPLICATION AND CERTIFlCATE FOR PAYMENT APPUCATION NO: ONE
APPUCATION DATE: 11127M7
PERIOO TO. 112W17
ITEM DESCRIPTION OF WORK PRICE �UANTITY MEAB VALUE WORK COMPLETED WORK CONPLETED TOTAL % BAIAWCE
NO. PREVIOVB APPL. THIS P9t10D COMPLETED (C41C) TO FINISN
QUANTITY AMOUNT �UANTITY AMOUNT 4UANTITY AND 8TORED (C-0)
TO DATE TO DATE
�EMS
Item -Proled Ganaro!Condlllons
1 Mobilimlion 6!Suparvi�ion S 730.00 !.0 L.S. S 730.00 0.00 0.00 1.00 760.00 1.00 780.00 100.0096 •
A Ramove dc Rcpieoe 4"Conuote Sidawalk S 14.75 9,000.0 S.F. S 132.730.00 0.00 0.00 3,000.00 44,280.00 3,000.00 44,260.00 33.33% 88,600,00
B Remove&Repleca 6"Concrctc Drivavvay and/or
Sidewalk I 17.50 1,725.0 S.F. S 30,167.50 0.00 0,00 822.00 14,388.00 822.00 14,388.00 4T,9696 18,802.60
� Construction of New 4"Concrole . _ .
Sidewalk/Ddve�vay S II.SO S.F. S 0.00 0.00 0.00 0.00 0.00
p Construcdon of Na�v 6"Concrete .
SldmwlWDriveway S 14.00 S.C.
E Removo�Replex 4"Asphelt Sidewalk S 17.50 S.F. S - 0.00 0.00 0.00 0.00 0.00 - •
F Jtemovo&Replaco 6"Asphnit Driveway endlor - _ _
Sidowalka S 18.75 S.F. S 0.00 0.00 0.00 0.00 0.00
O Construction ofNcv 4"Asphalt Sidowalk S 15.50 S.F. S - � "
H Conawction ofNew 6"Aspha�t SidcwalWDrlveway S 16.75 S.F. S - 0.00 0,00 0.00 0.00 0.00 • •
CONTRACT TOTAL i 183 88T.60 5 389 86.00 � 6!�Q6.00 38.28% S 104,302.60
.
.
°�• e
Purchase Order
vi�of r��
- �T�� • • • - A o�'� •-� -' i • • o
q Tequesla,FL 33469 18-000100 18-000100 10C31/�17 01348
� •
-{ e
.._ �
VEND�R ADDRESS: SHIP TO:
01348
R 8�D PAVING LLC Doug Chambers
400 D�CUTiVE CENTER DR
SUITE 210 �
WEST PALM BEACH,FL 33401 ,
� ORDERED BY PRICE SOURCE DEPARTMENT
DOUG CHAMBERS'� CONTRACT " •PW
�O DESCRIPTION: SIDEWALK IMPROVEMENT-SOUTN SIDE OF TEQUESTA DR.FROM SEABROOK RD.TO RNERS
QUANTITY DESCRlPTION'• UNCC PRICE AMOUNT
1 SIDEYVALKUAPROVElAEN'fS 163,687.5Q 763.687.50
301 210-663.652 Pathwayl5ide�raNc Improvements 163,687.50
NET TOTAL: 163,687.5Q
ViLLAGE OF TEQUESTA
� puRCHas�N� �n-rE
. �
09'EO£'40� S °Ye9Z'9fi 00'98C 89 = 00'99 89t ' 4 09't99£9� 4 lV1O110Vlt1N09
• - 00'0 00'0 00'0 UO'0 00'0 - S 'd'S SL'91 8 ���anNMI1�P!S 1�e4dit+�9�NJo uopanusoo� H
- - - S 'r1'S OS'SI 3 XI��PlS 1N4dsN.4�K3o uog�wnco� D
- - 00'0 00'0 00'0 00'0 00'0 - 3 '3'5 SL'81 S a�I��PlS 3
�o�pua�taewe�p 11�ydsy�9 oao�do�:g aeowa�
• - 00'0 00'0 00'0 00'0 00'0 - S 'd'S OS'L 1 S �II��PlS 11B4�d.6��i�l aP onouu� e
• ':1'S 00'bi S �0A�0Al�4/�Ilo^+oPIS Q
aw�o'J„9 nwN,�o uop�Ms�J
• - QO'0 00'0 00'0 00'0 00'0 � S 'd'S OS'1I S ��+��^NQMI�Pl5 �
alaauaJ„4 n�aH,�o uo�wJ
09'L08'9L 9i9B'L4 00'S�'4� 00'ZZ8 00'9B£'Vt 00'ZZ9 00'0 00'0 OS'L81'Of S 'd'S 0'SZL'l OS'LI S �IIoM�PIS g
JO/�1Y6�YM9AUQ O�AWU0,7�9 aoa�doa�+onowoy
00'009�B8 %EE'EE 00'09Z'4t� 00'000'£ 00'09Z'4Y 00'000'E 00'0 00'0 00'OiL'Z£i S '3'S 0'000'6 SL'6t S KNA19plg alouuo�„y ove�dob ap anowoy v
• 9�W0'OOL 00'09L 00'� 00'09L 00'� 00'0 00'0 00'OSL S 'S"I 0'I 00'OSL S uo�:ln�odngg+uo����qo�y T
�.�
21V0 Ol 31tl0 Ol
(EY�J1 03l1018 ONV AlI1NVftb 1NflOWY 1LLLLNdf1� 1Nf10WV 1LLLLNVf10
H81NId Ol ��/JI 031TIdV110� QOIN3d SIHl '�ddV Sf101/13ad 'ON
30M/1V8 '16 'IV101 0313'1dN0�H2SOM 03131dVV0�NZIOM 3f1lVA Sd3W /LLLLNVf10 3�Rid �ILIOM d0 NOIldR1�330 W311
LIJ07J11 �Ol GOla3d
LNLZlLI �31tl4 NOl1tlJl'IddV
3N0 �ON NOIll1011ddd 1N3W,ltld aOd 31YJIdiltf3�ONV NOLLIMJI1ddV'TAL'J Neutnao0 brlV
Z Jo Z gd £OLO 1N3Wf1�00 VIO'
133HS NOIlbf1NI1N0�
�
.�
Village of Tequesta
345 Tequesta Drive 561-768-0700
Tequesta, FL 33469 www.tequesta.org
TEQUESTA PL'BLIC WORK.S DEPART�fENT ME�40RANDt 1i
To: �lichael R. Couzzo,Village ;�lanager
From: Douglas M. Chambers, Public Works Deputy Director
Subject: Resolution to Appropriatc Funds for Sidewalk Repairs
Date: February 1,2018
The following Agenda item addresses the need for a RESOLUTION INCREASING THE FISCAL YEAR 2017/2018
GENERAL FUNO#001 BUDGET BY APPROPRIATING FUND BALANCE IN THE AMOUNT OF$113,905.00 TO FUND
ADDITIONAL EXPENDITURES IN THE PUBLIC WORKS DEPARTMENT FOR SIDEWALK REPAIRS.
We are currently repairing the sidewalk on the South side of Tequesta Drive from Seabrook Road to Riverside
Drive.tt would be beneficial and desirous to continue the repairs on the South Side of Tequesta Drive from Point
Drive to Country Club Orive.
BD IlEY:FURNISFI AlID INSTALL atJANT17Y UI�IT UNIT PRICE TOTAL
MoDiizeUion(Besed on 1 moNe) 1 LS $750.W
Proposd A
Derta end Replecemerd ot 4"Goncrete
Sitlew�elc b"Wide 7280 SF s14 7°r S1tl7;38U 0(i
Proposd B
Dertb and Repl�cemerd of 6"Concrele
Srclew9lc 6'Wide 33(1 SF s17°�tl �e,77,'�.q0
TOTAI: f11�,806_00
Douglas M. Chambers
Deputy Director Public Works
Village of Tequesta
�'ice-�fayor Frank D_�lmbra \ia�•oi.�1bb�•Brennan Council\iember Tom Paterno
Council Yiember Steve Okun Council\Iember Vince.�rena
�'illage\fanager�Gchael Couzzo
�
!
AV� C
S/WBE-M/WBE
400 E7iECUTIVE CEhTER DR.,STE.210
WEST PALbi BF.ACH,FL 33401
(561)588-6681
Fa:(561)Z&1-6541
PROPOSAL 6 Revised
January 31,2018
TO: Vlllage of Tequesta PROJECT:Tequesta Drive From
345 Tequesta Orive Bridge to EI Portal
Tequesta,FL 33469 New Concrete Sidewaik
ITEM�BID ITEM: FURNISH AND INSTALL QUANTITY UNR UNIT PRICE TOTAL
1 Mobil'¢ation(Based on 1 move) 1 LS $750.00
2 Proposal A
Demo and Replacement of 4"Concrete
Sidewalk 6'Wide 7280 SF $14.75 $107,380.00
3 Proposal B
Demo and Replacement of 6"Concrete
Sidewalk 6'Wide 330 SF $17.50 $5,775.00
TOTAL: a113,905.00
Matthew M. Donnell
Estimator