Loading...
HomeMy WebLinkAboutHandouts_Workshop_06/04/2018 Pastuch Handouts 6/4/18 � � 1 � DAVIS s� . ` ASHTON [�.A. , Keith W.Davis,Esq. Floridrt Bnr Barrrd Certifred Attonre� City,Courety mid Locel('�oaernment Lrrco Email:keith�davisashtonlaw.mm May 14, 2018 Via U.S. Mail and Certified Mail, Retum Receipt Requested 7013 2630 0000 4758 0444 DaRell D. Pastuch 391 Riverside Drive Tequesta, FL 33469 Re: Village of Tequesta Sidewalk Replacement Project; Response to Com- plaints Raised Dear Mr. Pastuch: I am in receipt of your several e-mails to the Village of Tequesta, including public records requests, regarding the above referenced matter. I have consulted with various Village personnel involved with the sidewalk replacement project and the following is the Village's position on the matter and response to your correspondences on the topic: In September, 2017, with the approval and adoption of the 2017/2018 budget via Resolution 45-17, the Village Council authorized the expenditure of funds for the Sidewalk Replacement Project. The Sidewalk Replacement Project was competitively bid in September, 2017 via RFP No. PW03-17. Pursuant to the RFP process, R&D Paving was determined to be tne proposer that best served the Vilfage's interests and needs. On September 20, 2017 the Village awarded the contract for performance of the Sidewalk Replacement Project to R�D Paving, the contract was approved by the Village Council and on October 12, 2017 was executed by the Mayor. Between the months of October, 2017 and April, 2018, the Sidewalk Replace- ment Proje�t Work was performed by R&D Paving. As various aspects of the project were peRnitted through the Building Department, they w ere also inspected and deter- mined to be in compliance with the applicable requirements of the Florida Building Code. 701 Northpoint Parkway, Si�ite 205,West Palm Beach, FL 33407 � p 561-586-7116 �f 561-586-9611 wu�co.davisashtonlaw.com �`��I V 0 ♦LEADING EXPERTS IN LOCAL GOVERNMENT LAW AND ETHICS♦ ��,n_I,., ,•� � C]W ��J J�l.C�t/� 1 J May 14,2018 Village of Tequesta Sidewalk Replacement Projecf;Response tn Complaints Raised As the documentation which establishes the above facts reveals, the Sidewalk Replacement Project was properly budgeted and was approved to be implemented by the Village Council; the project was competitively bid and the contractor was selected in accordance with Village procurement requirements; the work was performed in accord- ance with industry best practices; upon permitting and inspection by licensed inspec- tors, the work was determined to meet applicable Florida Building Code requirements. Although we have reviewed your numerous complaints, it is the Village's position that they are unfounded, and that the sidewalk replacement project is a success. There is no question that the new concrete sidewalks are a vast improvement over the old asphalt sidewalks and wil{ be an asset to the Village for many years to come. Be advised that the Village of Tequesta, having addressed your complaints and having responded to your public records requests, now considers this matter closed. You should not expect any further response from the Village of Tequesta related to the sidevralk replacernent projec:. Si .� ly, .� ��--- , �, /J �• �`Keit . , sq-- General Counsel cc: Michael Cou�o, Village Manage� Jose Rodriguez, Building Official Doug Chambers, Pubtic Works Department Director Gus Medina, Chief of Police John Carey, Palm Beach County Inspector General 2 R r Engineer. Large boulders and other obstructions shall be removed to a minimum depth of 6-inches bebw the finished subgrade elevation,and the space shall be backfilled with sand, base course material or other material or suitable material which shall be thoroughly compacted by rolling or tamping. • The subgrade shall be accurately trimmed to the required elevation with a Y-inch tolerance. High areas shall be trimmed to proper elevation. Low areas may be filled with suitable material and compacted to the specified density or filled with concrete integrally with the placing of the pavement. • (2)Setting Forms:The forms shall be accurately set to line and grade and such that they rest firmly,throughout their entire length upon the compacted subgrade surface. Forms shall be joined neatly and tightty and braced to resist the pressure of the concrete and the finished operations. The alignment and grade of all forms shall be approved before and immediately prior to the placing of concrete. • (3) Slipforming: The slipforming method will be allowed, provided that an acceptable finished product,true to line,grade,and cross section is consistently produced. • (4) Mixing Concrete: Concrete shall be mixed in accordance with the requirement of Section 03000. c. Installation (1) Placing concrete: • The concrete shall be distributed on the subgrade to such depth that, when it is consolidated and finished,the thickness required by the drawings will be obtained at all points and the surface will at no point be below the grade specified for the finished surface.The concrete shall be deposited on the subgrade in a manner which will require as little �ehandling as possible. Placing of the concrete shall be continuous between transverse joints,without the use of intermediate bulkheads. • Reinforcement shall be placed and maintained at this location during the placing and finishing operation. • Concrete shall be thoroughly consolidated against and along the faces of all forms by means of vibrators. Vibrators shall not be permitted to come in contact with the subgrade or a side form. �bration at any one location shall not continue so long as to produce puddling or the accumulation of excessive grout on the surface. In no case shall the vibrator be operated longer than 15 seconds in any one location. (2) Striking-off, Consolidating and Finishing Concrete: Immediately after the placing, the concrete shall be stuck off, consolidated and finished, to produce a finished product conforming to the existing area and or required by the drawings,Specifications and Instructions. (3) Straightening and Surface Corrections: After floating has been completed and the excess water removed, but while the concrete is still in a plastic state, the surFace of the concrete shall be tested for trueness with an accurate 10-foot st�aightedge.The straightedge shall be furnished by the Contractor.The straightedge shall be held in successive positions parallel to the walk center line,in contact with the surface,and the whole area tested from the side of the slab to the other as necessary.The advance along the walk shall be in successive stages of not more than one-half the length of the straightedge. Any depressions shall be immediately filled with freshly mixed 15 \ SIDEWAIK REPLACEMENT PROGRAM BID FORM Schedule A Filing for 1 permit ti��iil be required at the Cont�actors cost. The permit �vill cover the entire sidewalk replacement program. Proposai A Demolition, rernoval, disposal and repiacement of four inch (4"} concrete sidewalk per square foot per location, including installation and/or removal of sand, dirt, tree roots or any obst�uction as needed to meet grade.Back filling with clean fifl dirt and remova!of�r�aod forms is required. � • I 'rJ PER SQ FOOT Unit Price Figures Proposal B Demolition, removal, disposal and replacement of six inch (6") concrete driveway aprons a�d/or sidewalks per square foot {ocation, including inst'aliation and/o�the removal of sand, dirt,t�ee roots or any obstruction as needed to meet grade. Back filling �:�ith clean fill dirt, removal of forms and restoration of area is required. � � 5 Q PER SQ FOOT Unit Price Figure Proposal C Cvnstruction of new 4 inch{4")concrete side4valk per square foot location,including excavation,grading and/or the removal of sand,dirt,tree roots or any obstruction as needed to meet grade.Back filling wrth clean fiil dirt,removal of forms and restoration of area is required. �� � 1• .1� PER SQ FOOT Unit Price Figures Proposa!D Construction of new 6 inch (6") concrete sidewalk/driveway per square foot location, includi�g excavation, grading andJor the removal of sand, dirt, tree roots or any obstruction as needed to meet grade. Back filling with clean fill dirt,�emoval of forms and restoration of area is required. � � �' �C PER SQ FOOT Unit P�ice Figures Proposal E Demolition, removal, disposal a�d replacement of four inch (4"j asphalt sidewalk per square foot per tocation, including insta{tation a�d/or removal of sand, dirt, tree roots or any abstructie.^. �� .^.^^a^a i^ meet grade.Back ftlling with clean fitl dirt and removal of wood forms is required. � � r • s � PER 54 FOOT Unit Price Figures II � Bt0 FORM Schedule A(Co�tinued) Propasal F Demolition, removal, disposal and replacement of six inch (5"} asphalt driveway aprons and/or sidewiatks per square foot location, including instatlation and/or the removal of sand, di�t, tree roots or any obstruction as needed to mezt grade. Back filling �vith clean fill dirt, removal of forms and restoration of area is required. � � � • � 5 pER 54 F00T Unit Price Figure Proposal G Construction of new 4 inch (4") Asphaft sidewalk per square foot location, including excavation,gradirig and/or the removal af sand,dirt,tree roots or any obstruction as needed to meet grade.Back filting with ciean fill dirt,removal of forms and restoration of area is reauired. � � 5 • 5 � PER SQ FOOT Unit Price Figures Proposal H Construction of new 6 inch (6") Asphaft sidewalk/driveway per square foot location, including excavation, grading and/or the removal of sand, dirt, tree roots o�any obstruction as needed to meet grade. Back fifling with clean fill dirt,remova{of forms and restoration of area is required. � � �' ! 5 PER SQ FOOT Unit Price Figures /�dditio�al tnformation: 12 � � Print Page 1 of 2 Subje�ct: Fwd: Sidewalk Tequesta Dr. From: Tom Patemo(tpatemo@tequesta.org) To: dpastuch@belisouth.net; Date: Wednesday,April 25, 2018 1:09 PM Attachments availabie until May 25. 2Q18 I thought you would like to receive this emaii. Thanks. Thomas Patemo tpaterno@teG�,�est�.oro 954-683-7679 Think Big,�n Big� Begin forwarded message: From: Debra Teifrin <dteifrin@tequesta.org> Subject: Sidewalk Tequesta Dr. Date: April 19, 2018 at 12:26:26 PM EDT To: Abby Brennan <abrennan@tequesta.org>, Kristi Johnson <kjohnson@tequesta.org>, Laurie Brandon <ibrandon@tequesta.org>, Tom Patemo <tpaterno@tequesta.org>, "Vince Areana (AOL)" <finchaser50 a�aoi.c�m>, Vince Arena <varena@��questa.org> Cc: Debra Telfrin <dteffrin c�tequesta.org>, Michael Couzzo <mcouzzo@tequesta.org>, Jose Rodriguez <jrodriguez@tequesta.org>, Lori McWilliams <Imcvrrilfiams�a tequesta.org> Good afternoon, At the request of the Manager the email below and attachments above are forwarded for your review. Thank you, Debra A. Telfrin Executive Assistant 561-768-0465 Mr.Couzzo: You have requested information regarding the above-referenced Permits for the Sidewalk Rehabilitation and Construction project located on the south sideof Tequesta Drive between Seabrook Road and Country Club Drive (the Project). The above-referenced permits(the Permits) have been issued and https://mail.yahoo.com/neo/launch?.src=ym&reason=myc 5/25/2018 � f Print Page 2 of 2 finalized as they are in accordance with the contractual requirements as well as the Florida Building Code. The contractor for the Project, R&D Paving LLC, was chosen by a Request for Proposal (RFP) committee review. A signed contract was provided as partof the RFP review which detailed the Project requirements, including the width and depth of the paving concrete. On April l8, 2018, a final inspection ofthe Project was performed by me in my capacity as Building O�cial for the Village of Tequesta. I inspected 15 different areas of the Project to verify the concrete depth, as documented in the attached photographs. I verified that the sidewalk is at least4 inches thick and the concrete in the driveways are at least 6 inches thick. Accordingly,the Permits have been issued for the Project. Attached,for your review, is a copy of the Permits and supporting documentation,the inspection photographs and the contract. Please let me know ifyou need anything additional on this. Regards, Thank You Jose Rodriguez, BCA Building Official 34� Tet�uesta Drive Tequesta Florida 33469 561-768-0511 �`�v'tC t0 �10`�vf��G�{�� Gii�;K i0 E10��1�iilGc:t; RD Paving LLC-Contract.pdf Inspection Photoqraphs.pdf 3.7 MB 31.4 MB Cl�c�: t� �c�:n�o�:d Permits and Supporting Documentation.pdf 9.9 MB This email has been scanned for email related threats and delivered safely by Mimecast. For more information please visit http:/lwww.mimecast.com https://mail.yahoo.com/neo/launch?.src=ym&reason=myc 5/25/2018 } �� 0 Purchase Order vi�of req� . 345 Tequesta Drive • • o - a o�'� •-� - i = � a � Tequesta,FL 33469 18-000900 18-000100 10/312017 01348 � - -{ o ._ ' VENDOR ADDRESS: SHIP TO: 01348 � R 8�D PAVING LLC Doug Chambers 400 EXECUTNE CENTER DR SUfI'E 210 � WEST PALM BEACH,FL 3:i401 , � ORDERED BY PRICE SOURCE DEPARTlAENT DOUG CNAMBERS" CONTRACT " •PW �O DESCRIPTION: S[DEWALK IMPROVEMENT-SOUTH S[DE OF TEQUESTA DR.FROM SEABROOK RD.TO RNERS QUANTITY DESCRIPTION'• UNIT PRlCE AMOUNT 9 SmEWALiC11�ROVElIIEt�'fS 7b'3,687.50 163,687.5D 301-210-663.652 Pathway/SideMralk Impnrnre�neNs 163,667.50 NET TOTAl: 163,687.50 VILLAGE OF TEQUESTA � PURCHASlNG DATE CONTINUATION SHEET AtA DOCUMENT 0703 Pa 2 ot 2 qlA Document G7Q2,APPLICATION AND CERTIFlCATE FOR PAYMENT APPUCATION NO: ONE APPUCATION DATE: 11127M7 PERIOO TO. 112W17 ITEM DESCRIPTION OF WORK PRICE �UANTITY MEAB VALUE WORK COMPLETED WORK CONPLETED TOTAL % BAIAWCE NO. PREVIOVB APPL. THIS P9t10D COMPLETED (C41C) TO FINISN QUANTITY AMOUNT �UANTITY AMOUNT 4UANTITY AND 8TORED (C-0) TO DATE TO DATE �EMS Item -Proled Ganaro!Condlllons 1 Mobilimlion 6!Suparvi�ion S 730.00 !.0 L.S. S 730.00 0.00 0.00 1.00 760.00 1.00 780.00 100.0096 • A Ramove dc Rcpieoe 4"Conuote Sidawalk S 14.75 9,000.0 S.F. S 132.730.00 0.00 0.00 3,000.00 44,280.00 3,000.00 44,260.00 33.33% 88,600,00 B Remove&Repleca 6"Concrctc Drivavvay and/or Sidewalk I 17.50 1,725.0 S.F. S 30,167.50 0.00 0,00 822.00 14,388.00 822.00 14,388.00 4T,9696 18,802.60 � Construction of New 4"Concrole . _ . Sidewalk/Ddve�vay S II.SO S.F. S 0.00 0.00 0.00 0.00 0.00 p Construcdon of Na�v 6"Concrete . SldmwlWDriveway S 14.00 S.C. E Removo�Replex 4"Asphelt Sidewalk S 17.50 S.F. S - 0.00 0.00 0.00 0.00 0.00 - • F Jtemovo&Replaco 6"Asphnit Driveway endlor - _ _ Sidowalka S 18.75 S.F. S 0.00 0.00 0.00 0.00 0.00 O Construction ofNcv 4"Asphalt Sidowalk S 15.50 S.F. S - � " H Conawction ofNew 6"Aspha�t SidcwalWDrlveway S 16.75 S.F. S - 0.00 0,00 0.00 0.00 0.00 • • CONTRACT TOTAL i 183 88T.60 5 389 86.00 � 6!�Q6.00 38.28% S 104,302.60 . . °�• e Purchase Order vi�of r�� - �T�� • • • - A o�'� •-� -' i • • o q Tequesla,FL 33469 18-000100 18-000100 10C31/�17 01348 � • -{ e .._ � VEND�R ADDRESS: SHIP TO: 01348 R 8�D PAVING LLC Doug Chambers 400 D�CUTiVE CENTER DR SUITE 210 � WEST PALM BEACH,FL 33401 , � ORDERED BY PRICE SOURCE DEPARTMENT DOUG CHAMBERS'� CONTRACT " •PW �O DESCRIPTION: SIDEWALK IMPROVEMENT-SOUTN SIDE OF TEQUESTA DR.FROM SEABROOK RD.TO RNERS QUANTITY DESCRlPTION'• UNCC PRICE AMOUNT 1 SIDEYVALKUAPROVElAEN'fS 163,687.5Q 763.687.50 301 210-663.652 Pathwayl5ide�raNc Improvements 163,687.50 NET TOTAL: 163,687.5Q ViLLAGE OF TEQUESTA � puRCHas�N� �n-rE . � 09'EO£'40� S °Ye9Z'9fi 00'98C 89 = 00'99 89t ' 4 09't99£9� 4 lV1O110Vlt1N09 • - 00'0 00'0 00'0 UO'0 00'0 - S 'd'S SL'91 8 ���anNMI1�P!S 1�e4dit+�9�NJo uopanusoo� H - - - S 'r1'S OS'SI 3 XI��PlS 1N4dsN.4�K3o uog�wnco� D - - 00'0 00'0 00'0 00'0 00'0 - 3 '3'5 SL'81 S a�I��PlS 3 �o�pua�taewe�p 11�ydsy�9 oao�do�:g aeowa� • - 00'0 00'0 00'0 00'0 00'0 - S 'd'S OS'L 1 S �II��PlS 11B4�d.6��i�l aP onouu� e • ':1'S 00'bi S �0A�0Al�4/�Ilo^+oPIS Q aw�o'J„9 nwN,�o uop�Ms�J • - QO'0 00'0 00'0 00'0 00'0 � S 'd'S OS'1I S ��+��^NQMI�Pl5 � alaauaJ„4 n�aH,�o uo�wJ 09'L08'9L 9i9B'L4 00'S�'4� 00'ZZ8 00'9B£'Vt 00'ZZ9 00'0 00'0 OS'L81'Of S 'd'S 0'SZL'l OS'LI S �IIoM�PIS g JO/�1Y6�YM9AUQ O�AWU0,7�9 aoa�doa�+onowoy 00'009�B8 %EE'EE 00'09Z'4t� 00'000'£ 00'09Z'4Y 00'000'E 00'0 00'0 00'OiL'Z£i S '3'S 0'000'6 SL'6t S KNA19plg alouuo�„y ove�dob ap anowoy v • 9�W0'OOL 00'09L 00'� 00'09L 00'� 00'0 00'0 00'OSL S 'S"I 0'I 00'OSL S uo�:ln�odngg+uo����qo�y T �.� 21V0 Ol 31tl0 Ol (EY�J1 03l1018 ONV AlI1NVftb 1NflOWY 1LLLLNdf1� 1Nf10WV 1LLLLNVf10 H81NId Ol ��/JI 031TIdV110� QOIN3d SIHl '�ddV Sf101/13ad 'ON 30M/1V8 '16 'IV101 0313'1dN0�H2SOM 03131dVV0�NZIOM 3f1lVA Sd3W /LLLLNVf10 3�Rid �ILIOM d0 NOIldR1�330 W311 LIJ07J11 �Ol GOla3d LNLZlLI �31tl4 NOl1tlJl'IddV 3N0 �ON NOIll1011ddd 1N3W,ltld aOd 31YJIdiltf3�ONV NOLLIMJI1ddV'TAL'J Neutnao0 brlV Z Jo Z gd £OLO 1N3Wf1�00 VIO' 133HS NOIlbf1NI1N0� � .� Village of Tequesta 345 Tequesta Drive 561-768-0700 Tequesta, FL 33469 www.tequesta.org TEQUESTA PL'BLIC WORK.S DEPART�fENT ME�40RANDt 1i To: �lichael R. Couzzo,Village ;�lanager From: Douglas M. Chambers, Public Works Deputy Director Subject: Resolution to Appropriatc Funds for Sidewalk Repairs Date: February 1,2018 The following Agenda item addresses the need for a RESOLUTION INCREASING THE FISCAL YEAR 2017/2018 GENERAL FUNO#001 BUDGET BY APPROPRIATING FUND BALANCE IN THE AMOUNT OF$113,905.00 TO FUND ADDITIONAL EXPENDITURES IN THE PUBLIC WORKS DEPARTMENT FOR SIDEWALK REPAIRS. We are currently repairing the sidewalk on the South side of Tequesta Drive from Seabrook Road to Riverside Drive.tt would be beneficial and desirous to continue the repairs on the South Side of Tequesta Drive from Point Drive to Country Club Orive. BD IlEY:FURNISFI AlID INSTALL atJANT17Y UI�IT UNIT PRICE TOTAL MoDiizeUion(Besed on 1 moNe) 1 LS $750.W Proposd A Derta end Replecemerd ot 4"Goncrete Sitlew�elc b"Wide 7280 SF s14 7°r S1tl7;38U 0(i Proposd B Dertb and Repl�cemerd of 6"Concrele Srclew9lc 6'Wide 33(1 SF s17°�tl �e,77,'�.q0 TOTAI: f11�,806_00 Douglas M. Chambers Deputy Director Public Works Village of Tequesta �'ice-�fayor Frank D_�lmbra \ia�•oi.�1bb�•Brennan Council\iember Tom Paterno Council Yiember Steve Okun Council\Iember Vince.�rena �'illage\fanager�Gchael Couzzo � ! AV� C S/WBE-M/WBE 400 E7iECUTIVE CEhTER DR.,STE.210 WEST PALbi BF.ACH,FL 33401 (561)588-6681 Fa:(561)Z&1-6541 PROPOSAL 6 Revised January 31,2018 TO: Vlllage of Tequesta PROJECT:Tequesta Drive From 345 Tequesta Orive Bridge to EI Portal Tequesta,FL 33469 New Concrete Sidewaik ITEM�BID ITEM: FURNISH AND INSTALL QUANTITY UNR UNIT PRICE TOTAL 1 Mobil'¢ation(Based on 1 move) 1 LS $750.00 2 Proposal A Demo and Replacement of 4"Concrete Sidewalk 6'Wide 7280 SF $14.75 $107,380.00 3 Proposal B Demo and Replacement of 6"Concrete Sidewalk 6'Wide 330 SF $17.50 $5,775.00 TOTAL: a113,905.00 Matthew M. Donnell Estimator