HomeMy WebLinkAboutMinutes_Selection Review_08/14/2018 MINUTES
VILLAGE OF TEQUESTA
COMMUNITY CENTER PLANNING
AND DESIGN SELECTION ` �
COMMITTEE AUGUST 14, 2018
CALL TO ORDER AND ROLL CALL
The meeting was called to order at 9:00 am by Village Clerk / Admin PIO Lori
McWilliams, MMC who also called the roll. Selection Committee Members present
were: Greg Corbitt, Doug Chambers and Stephen Fowler. Council Member Arena and
Attorney Mitty Bernard were also in attendance.
1. Proposal Presentations
• 9:00 a.m. REG Architects
Mr. Rick Gonzalez presented on behalf of REG Architects, introduced his team
including Christine Merrell as the Project Manager and Don Hearing as the
Landscape Architect. He noted they have 17 architects on staff and have been
in business for over 30 years. He offered a Saturday or evening charrette for
resident feedback and noted the office was close to the Village. He reviewed the
proposed design including parking (130 spaces), gym size, and office space in
the middle to monitor all around activities, a warming kitchen to serve up to 300
for banquets, and use of a pre-engineered building.
Mr. Gonzalez, Mr. Hearing and Ms. Merrell answered Selection Committee
inquiries regarding value engineering, other projects the project manager has
previously managed, cost per square foot ($150-$180), project size and priority,
minimization to neighboring residents, low bid versus construction manager at
risk, a running track, park and shuttle, solar panels, a generator, grants for green
building, and LEED buildings.
• 9:30 a.m. Stephen Boruff Architects & Planners
Mr. Stephen Boruff presented on behalf of Stephen Boruff Architects & Planners,
introduced his team including Nelo Freijomel, Robert Curto and Don Hearing. He
commented on similar completed projects and a current project in the Town of
Palm Beach. He advised there were no limitations, only design opportunities, the
need to be sensitive to surrounding residents, parking for staff in the back of the
building (99 spaces), alternate construction techniques, tiltwall construction to
minimize impact to the neighborhood, times and cost savings. He commented
on the design, which leads people past the building to interact prior to entering
the building, the playground/splash pad area, colonnade, two-story building,
future expansion and their broad range of experience.
Mr. Boruff's team responded to the Selection Committee questions regarding
cost per square foot ($150-$200), utilization of both Parks and Recreation sites,
Spanish Revival architecture, other potential design styles to better fit the Village
character, option for outdoor playground, sufficient parking, lien process for
shared project pool to save money, contractors involved on the front-end, low bid
versus CMA, rising costs would be site work, utilities and drainage, and owner
purchase of materials when possible to cut costs.
• 10:00 a.m. Synalovski Romanik Saye, LLC
Ms. Merrill Romanik presented on behalf of Synalovski Romanik Saye,
introduced her team. She reviewed local projects they have been involved with,
advised they are certified minority in Florida but not Palm Beach County with
over 30 years experience, 286 municipal projects and 87 of them similar. She
discussed materials to celebrate parking (80-160 spaces), process, time, how to
bring people in without cars, covered drop-off, single point entry, visibility of
reception area for safety, natural light, cost ($240 sq. ft.), and tilt wall
construction.
Ms. Romanik and her team responded to the Selection Committee questions
regarding engineering in-house, mitigating rising costs, and priority of project.
2. Evaluation and Ranking of Proposals
The Selection Committee discussed the three presentations noting that the third
presentation had all costs including finishing incorporated in the square footage
cost, whereas the first two were shell only. Additionally, they discussed the side
only access of the third presentation, grant funding ideas, pre-fabs, and benefits
of the project manager living in Tequesta. Mr. Fowler suggested the evaluation
should be based on qualifications at this point and not on price.
The scores for each presenter were read aloud and the Village Clerk totaled the
scores. The results of the evaluation and ranking were:
Firm 7/19/18 8/14/18 Total
Score Score Score
1. REG Architects 274 291 565
2. S nalovski Romanik Sa e, LLC 283 260 543
3. Ste hen Boruff, Architect and Planners 258 240 498
ADJOURNMENT: The meeting was adjourned at 11:18 a.m.
Respectfully submitted,
��-m �
Lori McWilliams, MMC
Village Clerk
Note: These summary minutes are prepared in compliance with 286.011 F.S. and are
not verbatim transcripts of the meeting. A verbatim audio record is available from the
Office of the Village Clerk. All reference attachments are on file in the Village Clerk's
Office.