HomeMy WebLinkAboutDocumentation_Special Meeting_Tab 15_12/08/2005RESOLUTION NO. 36-05/06
•
A RESOLUTION OF THE VILLAGE COUNCIL OF THE
VILLAGE OF TEQUESTA, PALM BEACH COUNTY,
FLORIDA, AUTHORIZING THE EXECUTION OF THE
ATTACHED EXHIBIT "A", ENGINEERING SERVICES
WORK AUTHORIZATION, IN THE AMOUNT OF 26,000.00
TO ARCADIS, RMA, BUDGETED IN THE STORMWATER
UTILITY FUND #403, ACCOUNT #403-320-662.632,
ARCHITECT & ENGINEERING, OTHER, WITH A
2005/2006 BUDGET OF $30,000.00 AND AUTHORIZING
THE VILLAGE MANAGER TO EXECUTE THE APPLICABLE
WORK AUTHORIZATION ON BEHALF OF THE VILLAGE.
NOW, THEREFORE, BE IT RESOLVED BY THE VILLAGE
COUNCIL OF THE VILLAGE OF TEQUESTA, PALM BEACH
COUNTY, FLORIDA, AS FOLLOWS:
Section 1. Consideration to execute work
authorizations in the total amount of $26,000.00,
with funds budgeted in the Stormwater Utility Fund
• #403 2005/2006 budget, Account # 403-320-662.632,
Architect & Engineering, Other; and with the
engineering services work authorization attached
hereto as Exhibit "A" and incorporated by
reference as a part of this Resolution is hereby
approved and the Village Manager of the Village of
Tequesta is authorized to execute the same on
behalf of the Village.
THE FOREGOING RESOLUTION WAS OFFERED by
Councilmember who moved its
adoption. The motion was seconded by
Councilmember and upon being
put to a vote, the vote was as follows:
FOR ADOPTION AGAINST ADOPTION
•
• The Mayor thereupon declared the Resolution duly
passed and adopted this 8th day of December, A.D,
2005.
MAYOR OF TEQUESTA
James Humpage
ATTEST:
Gwen Carlisle
Village Clerk
•
Village of Tequesta
Purchase Order Requisition
(Not a Purchase Onte~ Date:
Date Purchase Order is Req'd:
Department:
Req. #: 12/1/2005
12/9/2005
Utilities
Quotes Received: (See Attached)
Vendors
1 Recommended Vendor: Vendor #: 0163
Arcadis Reese Macon & Associates
Address: 6415 Lake Worth Road
2 City: Lake Worth
3 State & Zip: Florida, 33463-2907
Comments: En ineerin for South C ress, Desi n, errnittin and biddin onl .
Resolution # 36-05/06
Manuf./
Item Descri tion Part# Q
Unit Price Total Cost Account # Available Balance
Finance Use Onl
ineerin Services $26,000.00 403-320 662.632
South C ress
THIS AMOUNT Total: $26,000.00
De artment Head Si nature: F/in/ance/Admini trative Use Only:
K-~ ~ Date: 12 i 2 op,~"
nce Director Si nature: Date:
Villa a Mana er A royal: Date:
Villa a Council A royal: Resolution #: 36-05/06 Date:
PO#: Processed By: Date:
• VILLAGE OF TEQUESTA
Engineering Services Work Authorization
South Cypress Drive Streetscape Improvement
This Work Authorization authorizes ARCADIS G&M Inc., to perform the work set forth
herein and is issued pursuant to the "Professional Engineering Consulting Services
Agreement", dated November 22, 2005, referred to hereinafter as "Agreement". All
terms and conditions of said agreement shall be applicable to this work authorization.
SCOPE
The Engineer understands this authorization to cover engineering services related to the
design, permitting, bidding and construction of the South Cypress Drive Improvements
from Tequesta Drive to the Tequesta corporate limits. The improvements, shall consists
of the following:
• Replacement of the existing 4-inch water main.
• Road construction (drainage, curbing, asphalt and striping).
• • Street light conduit/pull boxes.
. • Coordinate with adjacent businesses.
The work will be as set forth in the Agreement Section 2.1, paragraphs 2.1.2 through
2.1.7, inclusive, including partial resident inspection services (during critical
components).
COMPENSATION
For work performed according to paragraph 2.1.2 through 2.1.5 of the Agreement
(design, permitting, bidding) the Consultant shall be paid a lump sum fee of twenty six
thousand dollars ($26,000.00).
For work performed according to paragraphs 2.1.6 through 2.1.7 of the Agreement
(services during construction) the Consultant shall be paid a lump sum fee of twenty two
thousand five hundred dollars ($22,500.00). Note that this fee assumes that the R4 raw
water main extension will be occurring at the same time as this construction.
TIME OF PERFORMANCE
The Consultant will complete the design and have the project ready for bid and
permitting within 90 days of receipt of this work authorization, fully executed.
•
1 of 2
•
ACCEPTED BY:
ARCADIS G&M, Inc.
~~~'
William D. Reese, P.E., Vice President
Date: ~ ~ Zg "r'
•
•
Village of Tequesta
Michael R. Couzzo,Village Manager
Date: