HomeMy WebLinkAboutMinutes_Special Meeting_09/11/1989
VILLAGE OF TEQUESTA
Post Office Box 3273 • 357 Tequesta Drive
Tequesta, Florida 33469-0273 • (407) 575-6200
FAX: (407) 575-6203
V I L L A G E
D O W N T O W N D E V E L
D E S I G N
M E E T I N
S E P T E M B E
I. OPENING REMARKS
O F T E Q U E S T A
O P M E N T T A S K
C H A R R E T T E
G M I N U T E S
R 1 1 1 9 8 9
F O R C E
The Tequesta Downtown Development Task Force held the final
presentation of their Design Charrette on September 11, 1.989, at the
Lighthouse Gallery, 373 Tequesta Drive, `Pequest.a, Florida. The
purpose of the Charrette t.as to examine, study and design a. downtown
Village Center, generally described as an area encompassing
approximately 90 acres from the FEC Ra,ilroa.d on the west. to U.S.
Highway 1 on the east, from Bridge Road on the south to new road
"Village Boulevard" on the north, plus additional Dorner land north
of Village Boulevard.
pillage Planning Consultant, Jack Horniman, welcomed those in
• r~t.tendance and proceeded to explain the consuma.tion of the
~:`harrett.e, a five-day design symposium, to develop a downtown center
for the Village of Tequesta. He pointed out, the four main
properties involved: the Lighthouse Plaza, the Tequesta Plaza, the
Dorner property holdings along Dixie Highway and adjacent to
Lighthouse Plaza, and the St.. Jude's Church property. Some of this
area of the Village has been si.zffering. Four of the major anchor.
tenants have relocated, fortunately only moving to other shopping
centers in Tequesta. There is still a market here for major anchor
stores. The Vi.tlage Council established a Downtown Development Tasli
Force to analyse the 90-acre area a.nd make .recommendations, develop
a master plan for the downtown Village center and set up a.
Charrette, a. five-day workshop and design symposium which began
September 7, 1989.
The first day of the workshop was devoted primarily to interviewing
the Tegi.~esta people; the Downtown Develpment. Task Farce, the four
major property owners; the Village staff; and the Charrette Design
Team. Interviews with the Village Council were re-scheduled far. a
later time.
The second day interviews were held with anyone who might be
important t.o the process - anyone who might have input. or pot.entia.l
effect on the downtown area. Officials of utilities and public
services, the Florida. Department. of Transportation,
envir.onment.al_i.sts, the County road engineering staff, land ocaners,
•
Downtown Development Task Force
• C,harrette Meeting Minutes
September 11, 1989
Page 2
-------------------------------
shopping center owners, members of the business community, were
brought in. From that day until September 11, the Design Team
worked intensely on creating a Master Plan for the new downtown
Village Center in Tequesta.
II. PRESENTATION OF MASTER PLAN.
Mark Schimmenti, of Urban Design Studios, and the Image Network
staff explained the Master Plan. Mr. Schimmenti explained that for
the past five days a huge amount. of data had been collected about
Tequesta and its goals - the landholders' plans far development; the
Task Force concepts of development i.n that area; the citizens' and
Village Council's ideas. The general consensus was that Tequesta
wanted a downtown Village center in where they could live, work,
play and a sense of neighborhoodliness in a downtown community in
northern Palm Beach County.
• Tequesta has lots of suburbs, but no center. With present codes,
the downtown center of Tequesta could become an asphalt jungle of
high rises, with no sense desirable living space. Mixed uses are
the key t.o a neighborhood type community. A computer imaged grid
diagram was presented showing the two possible ways Tequesta could
develop. Tequesta presently has a segregation of uses which are not.
always easily accessible. The alternative could be a neighborhood
type setting with pedestrian walkways to previously hard-to-reach
shopping areas. The program goals are to design the dead areas of
the Village to become vibrant again with building types conducive to
making attractive public space.
Strategies that might work for a one-story building that is 600 feet
long are: 1) break it down into understandable components,
reorganized in such a way that it might be rented in smaller unit
as opposed to waiting for an anchor store to come i_n; and/or, apply
a much better layer of architecture along the front.
In order to implement a good Master Plan, it .is necessary to write
concise, clear architectural standard codes and zoning codes to go
Wlth lt.
The sign for the Village of Tequesta - entrance to the Village -
remai_ns. Lighthouse Plaza could become the Lighthouse Cul.tura.l.
Center, with art schools, and a shaded walkway to the entrance.
•
Downtown Development Task Force
Charrette Meeting Minutes
• September 11, 1989
Page 3
-------------------------------
•
A new downtown City Hall is conceived as a possibility for this
location, with a fountain on Tequesta Drive. Village Boulevard can
provide an east-west entry to the neighborhood type center with an
expanded Post Office.
Three neighborhoods were pictured.: 1) A cultural center northwest
of the old k-Mart, south. of Village Boulevard, to include an
auditorium-theatre, library, Lighthouse Gallery, and an outdoor
amphitheatre.; 2) A civic center along Tequesta Drive, with some
cultural studios i.n the vacated Winn-Dixie; 3) and a suburban
neighborhood, all being in easy walking distance of each other. The
Plan has a system of networks: a religious center, a civic center,
the center of the town, and the outlying suburban center, entries to
the communities with each one being well marked, with defined
arterial. circulation (Church Street, Village Boulevard, Tequesta
Drive), tying al.l the centers together. The new Master Plan has a.
network of green spaces, recreation areas, and natural elements that
work its wag throughout the entire Plan. The Plan also allows
people to move from one area to another without crossing a sea of
parking lots.
Question and Answer Session
Leslie Cook, Chairman of the Community .Appearance Board, asked Mr.
Schimmenti to reiterate what happens to the entrance of Tequesta.
Plaza. He responded that i_t pretty much stays intact in the Master
Plan, except for the parting of the median and trees in the middle
as defined by the two roads coming down to that point in the Master
Plan.
A citizen asked how the Master Plan interfaces with what exists now
and what is proposed; it appears the FEC tracks cut everything off.
Mr. Schimmenti. responded: The tracks do cut everything off and that
is why this area has been developed as a neighborhood.. It's all
tied together culturally. Those on the west side of the tracks have
chosen a suburban lifestyle a.nd understand they will have to get
into their car to go somewhere. There i_s a difference between being
in the suburbs and being in the urban center.
.john Gi_ba was concerned that much walking would be required in this
new development .and felt inclement weather or age might restrict
many carrying packages. Mr. Schimmenti replied that it is not a
recommendation that everyone get rid of their cars, and that much
parking had a]_so been provided for, but i.t would not entail lots of
driving to complete a.l.l of one's tasks.
•
Downtown Development Task Force
Charrette Meeting Minutes
• September 11, 1989
Page 4
-------------------------------
Another citizen was concerned about what would happen to existing
business on IJ.S. Highway 1. Mr. Schimmenti. felt they would not be
too affected by the Master Plan, with the L.S. 1 market being a more
regional market, and the new d.evel.opment more of a neighborhood
market.
Dr. Jacobs asked approximately how many residential units would be
added to downtown Tequesta. Mr. Schimmenti explained there would be
approximately 900 new units of housing with potential for over 2000
new citizens.
Another citizen asked what would happen to existing cultural centers
and the city hall when the3- become displaced? Mr. Schimmenti felt
the displacement process would be gradual without leaving behind a
blighted area. Police and. possible Public Safety deparments could
perhaps utilize the present Village Hall.
A citizen asked how long this progressive plan would take. Mr.
Schimmenti responded if there was one landowner, perhaps five years;
~~ut with so many factors to consider, it was difficult, to say. He
• felt the wisest place to start developing would be the civic center
<3nd defining that plaza. It doesn't have to be built out to find if
it's going to work - it can be built in smaller increments. The
plan allows for a lot of flexibility.
Another question posed was: Is there anything in the Master Plan
that will help the Village to implement. this plan, since the Town
Counci_1 changes every two years. Mr. Schimmenti answered there are
a number or ways to implement this Plan: 1) You can set up a special.
development agency; 2) Appoint someone to manage it; 3) ,you can
actually take the Charrette finished. product and use it for a master
plan, pass the resolutions and get the statewide and countywide
permits that you need. It i.s easily packaged. If the citizens are
behind the Master Plan, it will happen.
III. CLOSING REMARKS
Vice-Mayor Ed Howell stated that now we know the definition of the
word Charrette, we understand its nature, and after five days of
intensive work we surely have seen the function of a Charrette. The
full impact of the findings of Image Network and the entire
Charrette Team will. take some time to be translated into reality.
This will be the task, ialt.imat.ely, of the Village Council, once the
r1
LJ
Downtown Development Task Force
Charrette Meeting Minutes
September 11, 1989
Page 5
-------------------------------
Downtown Development Task Force is through analysing the Charrette
present,a.tion. But, the right mood has been created - much
enthusiasm and positive input and visionary thinking from many
people has taken place in a very short time.
Vice-Mayor Howell thanked everyone on the behalf of Mayor Capr.etta
who could not be here tonight. on the outstanding job they ha.d done.
Specific thanks were extended toward Carlton Stoddard, Chairman, and
the Downtown Development. Task Force; Fay Schrecengost of Lighthouse
Gallery-; Joann Manganiello, Charrette Coordinator; Jack Horniman and
the Image Network team. All were thanked for their unrelenting
work.
All. were invited to join in a social time after the close of the
meeting. The meeting closed at. 9:30 P.M.
R.es~~E r-•t.f~a11; s~~brn tted,
~~/ L~/Zti ~~~~~~
Fra~~ }ii hers
Recording Secretary
DATE APPROVED:
September 28, 1J89
ATTEST : ~ ~~~
Bill C. -ascavelis
Finance Director/Village Clerk
•