MEMORANDUM:
.., , ~ ~:
`~. i
,,\\
TO: Thomas G. Bradford, Village Manager
FROM: Thomas C. Hall, Water System Manager
SUBJECT: Bid Award Well 8R.
DATE: June 16, 1988
Based on the latest information received from Gee & Jensen
Engineers relative to the above, I would like to recommend
Council approval for the Bid Award to Hoff Electric in the
amount of $91,680.00. This is a substantial savings over the
original bid amount with savings to be realized by the Village
by purchasing items directly.
I recommend we move forward with this project so this badly
needed well may be placed into service providing some relief on
our strained system.
TCH:ibl
~ Nr
1/11411/
In\ !.)Cfl/
June 13, 1988
GEE &JENSON
Engineers-Architects- �. ���C."•,�, a
Planners,Inc.
JU/1 314
Mr. Thomas Bradford .s 79�, -9
Village of Tequesta '��
Post Office Box 3273 G; ' �5 vo
Tequesta, Florida 33468-0273
Re : Equipping of Well 8R
Dear Tom:
Over the past several weeks we have been negotiating on behalf of
the Village with Hoff Electric, the apparent low bidder on the
above referenced project. If you will recall, this project came
in over the Village's budgeted amount of $80 ,000. Note that the
budget amount was based upon an Engineer ' s estimate which was
established in September 1987. Hoff Electric's bid was $140 ,384.
Items which led to increased costs were:
* Change to variable speed control
* Steel to fiberglass suction pipe
* Magnetic meter in place of a Rockwell Turbine Meter
- * Concrete meter/valve vault
* Abandonment of Well 8 and monitoring well
* Underground electrical vs. overhead
In order to save the Village money, our first recommendation is
to delete the emergency generator and have the Village purchase
this on their own, at a cost of $30 ,000, a savings of $7,490 over
the contractor ' s bid price. Our next approach was to negotiate.
item by item, with Hoff Electric. It is here that we were able
to reduce the cost by 11% or $11,214, bringing the bid price down
to $91,680 (excluding the emergency generator) .
It is therefore our recommendation, based upon the availability of
additional funds, that Hoff Electric be awarded this project in
the amount of $91 ,680. The emergency generator, at $30,000,
could be purchased from funds originally set aside for the
purchase of the lot at well 23.
One Harvard Circle • P.O.Box 24600 • West Palm Beach,Florida 33416-4600 • 305/683-3301 • Telex 513472 G&J WPB
091)
Mr. Thomas Bradford
Village of Tequesta
June 13 , 1988 - Page 2
If you would like to discuss this further, please do not hesitate
to call.
Very truly yours,
GEE & JENSON
Engineers-Architects-Planners, Inca
Thomas C. Jensen, P. E.
TCJ/jef
88-061
cc: Thomas Hall
Gary McCollum
Bill Snow
GEE&JENSON Engineers,Architects.Planners.Inc.
` ti
1
111119111
VILLAGE OF TEQUESTA
EQUIPPING WELL 8R
HOFF ELECTRIC BID PRICES
NEGOTIATED
BID PRICE BID PRICE
1. Abandonment of well 8 and
Monitoring Well $ 3,283.00 $ 3,124,00
2. Redevelopment of Well 8R 3 ,591.00 ' 3,413.00
3 . Fence removal, clean existing
structure, add new metal door,
paint structure inside and out
including door, site work and sod 6,043.00 4,384.00
4. Pump and motor 8,738.00 7,643.00
5. Fiberglass Pipe 3 ,275.00 3,139.00
6 . DIP and valves and fittings 7,059.00 6,765.00
7 . 6" magnetic meter 7,632.00 6,709.00
8. Concrete vault 6,868.00 8,119.00
9. Motor control center and
electrical conduit, wiring 56,045.00 48,384.00
10. Portable generator 37,490.60 0.00
TOTAL BID PRICE $140,384.00 $ 91,680.00
GEE&JENSON Engineers,Architects,Planners.Inc.
4 L-t.AG4 OP /E'er V e'S EQv/iP/Nb IN EtL S!e
•
A.DzioopM
• CovTit'if•c.r" a I a. m •
QeCi� Ni a
• Co re+ ToR AMD OAfT• Co Ai( N 5 a'
M
Drr- t72 E 3. "
qE S
r ?
5ULLitii)rJ Coop. YE $ 152 t Dco •bo Lee S ?
Can Tr AC--r-0 It� c - tC $ 15 9 ga ► 00 4'� s
CONS- k6 c -r 01.1 YES 142 59 4 , 00 4'Es
.... ... .. . .
•
ej
Z
O
v
• ••1
. • m