Loading...
HomeMy WebLinkAboutDocumentation_Regular_Tab 09A_06/23/1988~, VILLAGE OF TEQUESTA WATER DEPARTMENT Post Office Box 3474 • 357 Tequesta Drive Tequesta. Florida 33469-0474 • (305) 746-4595 MEMORANDUM: .., , ~ ~: `~. i ,,\\ TO: Thomas G. Bradford, Village Manager FROM: Thomas C. Hall, Water System Manager SUBJECT: Bid Award Well 8R. DATE: June 16, 1988 Based on the latest information received from Gee & Jensen Engineers relative to the above, I would like to recommend Council approval for the Bid Award to Hoff Electric in the amount of $91,680.00. This is a substantial savings over the original bid amount with savings to be realized by the Village by purchasing items directly. I recommend we move forward with this project so this badly needed well may be placed into service providing some relief on our strained system. TCH:ibl ~ Nr 1/11411/ In\ !.)Cfl/ June 13, 1988 GEE &JENSON Engineers-Architects- �. ���C."•,�, a Planners,Inc. JU/1 314 Mr. Thomas Bradford .s 79�, -9 Village of Tequesta '�� Post Office Box 3273 G; ' �5 vo Tequesta, Florida 33468-0273 Re : Equipping of Well 8R Dear Tom: Over the past several weeks we have been negotiating on behalf of the Village with Hoff Electric, the apparent low bidder on the above referenced project. If you will recall, this project came in over the Village's budgeted amount of $80 ,000. Note that the budget amount was based upon an Engineer ' s estimate which was established in September 1987. Hoff Electric's bid was $140 ,384. Items which led to increased costs were: * Change to variable speed control * Steel to fiberglass suction pipe * Magnetic meter in place of a Rockwell Turbine Meter - * Concrete meter/valve vault * Abandonment of Well 8 and monitoring well * Underground electrical vs. overhead In order to save the Village money, our first recommendation is to delete the emergency generator and have the Village purchase this on their own, at a cost of $30 ,000, a savings of $7,490 over the contractor ' s bid price. Our next approach was to negotiate. item by item, with Hoff Electric. It is here that we were able to reduce the cost by 11% or $11,214, bringing the bid price down to $91,680 (excluding the emergency generator) . It is therefore our recommendation, based upon the availability of additional funds, that Hoff Electric be awarded this project in the amount of $91 ,680. The emergency generator, at $30,000, could be purchased from funds originally set aside for the purchase of the lot at well 23. One Harvard Circle • P.O.Box 24600 • West Palm Beach,Florida 33416-4600 • 305/683-3301 • Telex 513472 G&J WPB 091) Mr. Thomas Bradford Village of Tequesta June 13 , 1988 - Page 2 If you would like to discuss this further, please do not hesitate to call. Very truly yours, GEE & JENSON Engineers-Architects-Planners, Inca Thomas C. Jensen, P. E. TCJ/jef 88-061 cc: Thomas Hall Gary McCollum Bill Snow GEE&JENSON Engineers,Architects.Planners.Inc. ` ti 1 111119111 VILLAGE OF TEQUESTA EQUIPPING WELL 8R HOFF ELECTRIC BID PRICES NEGOTIATED BID PRICE BID PRICE 1. Abandonment of well 8 and Monitoring Well $ 3,283.00 $ 3,124,00 2. Redevelopment of Well 8R 3 ,591.00 ' 3,413.00 3 . Fence removal, clean existing structure, add new metal door, paint structure inside and out including door, site work and sod 6,043.00 4,384.00 4. Pump and motor 8,738.00 7,643.00 5. Fiberglass Pipe 3 ,275.00 3,139.00 6 . DIP and valves and fittings 7,059.00 6,765.00 7 . 6" magnetic meter 7,632.00 6,709.00 8. Concrete vault 6,868.00 8,119.00 9. Motor control center and electrical conduit, wiring 56,045.00 48,384.00 10. Portable generator 37,490.60 0.00 TOTAL BID PRICE $140,384.00 $ 91,680.00 GEE&JENSON Engineers,Architects,Planners.Inc. 4 L-t.AG4 OP /E'er V e'S EQv/iP/Nb IN EtL S!e • A.DzioopM • CovTit'if•c.r" a I a. m • QeCi� Ni a • Co re+ ToR AMD OAfT• Co Ai( N 5 a' M Drr- t72 E 3. " qE S r ? 5ULLitii)rJ Coop. YE $ 152 t Dco •bo Lee S ? Can Tr AC--r-0 It� c - tC $ 15 9 ga ► 00 4'� s CONS- k6 c -r 01.1 YES 142 59 4 , 00 4'Es .... ... .. . . • ej Z O v • ••1 . • m