HomeMy WebLinkAboutMinutes_Special Meeting_04/25/1985J ~ • MINUTES OF A SPECIAL COUNCIL MEETING OF THE VILLAGE OF TEQUESTA, FLORIDA APRIL 25, 1985 A Special Council Meeting was held by the Village Council of the Village of Tequesta, Florida at S:OO P.M., April 25, 1985 in the Village Hall, 357 Tequesta Drive, Tequesta, Florida. Councilmembers present were: Gemino, Howell, Mapes, Murphy and Stoddard. Also present were Robert Harp, Village Manager and Cyrese Colbert, Village Clerk. This Special Council Meeting was called to discuss the problem of excessive noise levels at the new Well 7R. Mr. Bill Reese, P.E., Gee ~ Jenson was present and presented Council with two (2) drawings, one a concrete block barrier wall and the other a concrete block pump house. Mr. Reese told Council that Gee ~ Jenson have looked at other alter- native to this well. One suggestion would be to go with a submergeable pump which they would not recommend because it would be a maintenance night mare. Another .suggestion would be a smaller submergeable pump with less yield but it would not pump enough. If the Village were to drill another well at another location, the cost would be something in the range of $35,000 to $40,000. They would not recommend this either because there is no guarantee of the water at a new well. Mike Davila, Gee ~ Jenson talked with Council about the noise level sound reading. With Scheme 1, which was the concrete block barrier wall, the reading would be 50 dba's, with Scheme 2, which is the concrete block pump house, the reading would be 40 dba's. Mapes moved, "that the Village Manager be authorized to follow Scheme 2 and spend up to $12,000 without coming back to the Village Council". Murphy seconded and vote on the motion was: Gemino - for Howell - for Mapes - for Murphy - for • Stoddard - for and therefore the motion was passed and adopted. • Special Council Minutes April 25, 1985 Page 2 - The meeting was adjourned at 5:39 P.M. ~~' CY ESE COLBERT CC:mk ~' ate Approve ~..__ JILL G I 0 ~~l _ `~ ~ .~ ~C~/ `~,~ ~ ~~ ~. EDWARD C. HORN LL "~,/ ~ , /,/ ~.lo W. HARVEY MAPES, R. 1.. CARLTON D. STODDARD v~v~ ~ _ .~ ARTHUR R. MURPHY ', • • • • ,` ~T ~~~ ~' .~ ~~Z ;IltE ~~~~~ r ~, r ~-2 d6 ~ r +i ~-- -- o. ~ u r~ o w n i NEW 8 TH ' S'-O" H-GH CONCRETE BLOCK WALL. (20'x 10' ) PROPER"T7 L-NE -~\ ti .r ~covv rcrri SUMP " ICK x SO d BA /~ i I ~' I RESIDENCES 1 I SCHEME 1 CONCRETE BLOCK BARRIER WAIL 45' ± _ 4O' ± ESTIMATED ATTENUATION 12 ;2 dB • • ~, r as €T ~~~ ~~ ~~Z i~llf fI) DOOR --~` FAN w~ sou-vo TRAP _~~ i +nt c~ , PuN PAL ROOF AGC:ESS FOR PU1`'IP REMOVAL }O' ± 3Cc00 RPM PUMP RES-DENCES NEw 8" THICK x 8'-O" HIGH CONGRE"fE BLOCK PUMP 1-IOUSE w/ PROPERTY CONCRETE ROOF LINE (2.0'x10') SCHEME ?_ 4 S' ± LOUVER W/ ~~SOUND "SRA CONCRETE BLOCK PUMP HOUSE I I ,1~ ESTIMATED ATTENUATION 22 ;2 dB ~~ I• • SCHEME 1 ESTIMATED COST $2.600 - $3.000 PRO LOW GO ST NO OPERA-f ING GO ST LOW MAIN'TCNAN CE COST EASY PUMP ACCESS CON : LESS A"fTENUA710N ?HAN PUMP HOUSE t 1 - 2 d ~ IN OPEN DIRECTION SCHF~,~IE 2 ESTIMATED COST $7,~~~ - $8.~0• PRO MORE A"TTENUA'fION NO I~IREGTIYITY EFFEG75 PRO'1'EGTS AGAINST VANDALISM CON MORE COSTLY OPExRATIN~a COST FAN FAN MAIN'TENANGE / PUMP MAIN'rENANGE MOR6c DIFFICULT LIMITED PUMP ACCESS ~ ~ ~ GEE & JENSON ~~~ _~ _