Tequesta Drive Bridge Replacement Conceptual Design Meeting
September 2008
C,
Agenda
• Purpose
• Objective
• Design Team
• Existing Bridge
• Other Bridge Concepts
• The Village Concept
• The Next Step
• Questions /Comments
C,
Purpose
C,
To gather input from Residents, Village
Council, and the Bridge Committee on what
they would like their bridge to look like, both
aesthetically and geometrically.
Objective
C,
To conclude this meeting with at least two
bridge design concepts.
Design Team
C,
Village of Tequesta Residents and Mayor Pat Watkins
and Council Members
Consultants:
~~~` ARCADIS
,~
'~ - Thomas C. Jensen, PE -Project Manager
- Hank Deibel, PE, -Roadway
- Kris Dean, EI, -Utilities
• Bridge Design Associates
- Brian Rheault, PE -Bridge /Structural Design
• Wayne Villavaso Landscape Architecture
- Wayne Villavaso, ASLA, ULI - Landscape/ Rendering
• Techno Engineering
- Nazie D'Jahanshai, PE - Electrical /Lighting
Existing Bridge
West
C,
East
North Elevation
C,
Looking East
C,
Bridge Concepts
C,
Bridge Concepts
C,
Bridge Concepts
C,
Bridge Concepts
C,
Bridge Concepts
C,
Bridge Concepts
C,
Bridge Concepts
C,
The Village Concept
• Bridge Height
• Width (Lanes /Sidewalks)
• Side Elevation
• Materials
• Lighting
• Landscaping
C,
Bridge Height South Elevation
C,
Width -Looking East
C,
Materials
• Concrete
• Rock
• Aluminum vs concrete railings
• Asphalt /concrete/ pavers
Lighting
• On the bridge
• Bridge approaches
Landscaping
• On the bridge
• Bridge approaches
C,
The Next Step
• Collect thoughts /ideas
• Prepare rendering of proposed
bridge
• Prepare updated cost estimate
• Conduct a second meeting to
finalize design concept
Questions /Comments
C,