Loading...
HomeMy WebLinkAboutDocumentation_Special Meeting_Tab 02_09/30/2008Village of Tequesta Tequesta Drive Bridge Replacement Conceptual Design Meeting September 2008 C, Agenda • Purpose • Objective • Design Team • Existing Bridge • Other Bridge Concepts • The Village Concept • The Next Step • Questions /Comments C, Purpose C, To gather input from Residents, Village Council, and the Bridge Committee on what they would like their bridge to look like, both aesthetically and geometrically. Objective C, To conclude this meeting with at least two bridge design concepts. Design Team C, Village of Tequesta Residents and Mayor Pat Watkins and Council Members Consultants: ~~~` ARCADIS ,~ '~ - Thomas C. Jensen, PE -Project Manager - Hank Deibel, PE, -Roadway - Kris Dean, EI, -Utilities • Bridge Design Associates - Brian Rheault, PE -Bridge /Structural Design • Wayne Villavaso Landscape Architecture - Wayne Villavaso, ASLA, ULI - Landscape/ Rendering • Techno Engineering - Nazie D'Jahanshai, PE - Electrical /Lighting Existing Bridge West C, East North Elevation C, Looking East C, Bridge Concepts C, Bridge Concepts C, Bridge Concepts C, Bridge Concepts C, Bridge Concepts C, Bridge Concepts C, Bridge Concepts C, The Village Concept • Bridge Height • Width (Lanes /Sidewalks) • Side Elevation • Materials • Lighting • Landscaping C, Bridge Height South Elevation C, Width -Looking East C, Materials • Concrete • Rock • Aluminum vs concrete railings • Asphalt /concrete/ pavers Lighting • On the bridge • Bridge approaches Landscaping • On the bridge • Bridge approaches C, The Next Step • Collect thoughts /ideas • Prepare rendering of proposed bridge • Prepare updated cost estimate • Conduct a second meeting to finalize design concept Questions /Comments C,